Skip to main content
Construction Control Directives
HOME
Construction Engineering
Control_Directives
Contact Construction
Cancelled CCDs
By Year
2 0 1 6
2 0 1 4
2 0 0 9
2 0 0 6
2 0 0 4
2 0 0 2
2 0 0 1
2 0 0 0
1 9 9 9
1 9 9 8
1 9 9 7
1 9 9 6
1 9 9 5
1 9 9 4
1 9 9 3
1 9 9 2
1 9 9 1
1 9 9 0
1 9 8 9
20221024
- 10/24/22 - Evaluation of Sediment Control Measures
Attachment 1
- Evaluation Form
Attachment 2
- Proposed Sediment Control Measures
20160418
- 01/07/20 - Monitoring the Davis-Bacon Act
Attachment 1
- Truck Flow Chart
20141024
- 10/24/14 - Unsatisfactory Performance by the Contractor
Attachment 1
- Unsatisfactory Performance S Curve
Attachment 2
- Sample Initial Unsatisfactory Performance Letter
Attachment 3
- Sample Refusal of Proposal Letter
Attachment 4
- Sample Resume Issuance of Proposal Letter
20141023
- 12/16/19 - Contractor's Performance Evaluation
Attachment 1
- Rating Form
Attachment 2
- Instructions
20140620
- 2/15/24 - Buy America: Summary of Recent Changes
20140620
- 1/1/24 - Buy America (January 2024 Revision)
20140620
- 12/20/22 - Buy America (December 2022 Revision)
Attachment 1 -
Contractor Letter(pdf)
Contractor Letter(docx)
Attachment 2 -
MDT-1 (Blank)
MDT-1 (Example)
MDT-1 (Fillable)
20140620
- 07/01/16 - Buy America
Attachment 1 -
Contractor Letter (2009 Spec)(pdf)
Contractor Letter (2009 Spec)(docx)
Contractor Letter (2019 Spec)(pdf)
Contractor Letter (2019 Spec)(docx)
Attachment 2 -
Steel Products Spreadsheet (example)
Attachment 3 -
MDT-1 (blank)
MDT-1 (example)
MDT-1 (Fillable)
Attachment 4 -
MDT-2 (blank)
MDT-2 (example)
MDT-2 (Fillable)
Attachment 5 -
MDT-3 (blank)
MDT-3 (example)
20101116
- 11/16/10 - Summary of Bridge Work Report
Attachment 1
- Summary of Bridge Work
20100720
- 07/20/10 - Administration of Construction Management Contracts
Attachment 1
- Task Order Request for Services
Attachment 2
- Sample - Consultant Request for Task Order Approval
Attachment 3
- Performance Evaluation
20070301
- 04/04/08 - 404 Permit Requirements
20070201
- 02/01/07 - Contract Administration and Documentation Utilizing SiteManager
20060717
- 11/1/17 - Hazardous Waste Reporting
20060209
- 02/09/06 - Equipment Rental Rates
20020215
- 02/29/16 - Use of Contractor’s Test Results for Acceptance Purposes
Attachment 1
- Appendix A - D
20020214
- 02/14/02 - Quality Control and Acceptance Procedures for Concrete Bridge Decks
Attachment 1
- 504-4QA(a-g) 99 (02-13-01) Special Provision
Attachment 2
- 504-4QA(a-g) 99 (09-26-01) Special Provision
20020213
- 03/01/02 - Overweight Deliveries
Attachment 1
- 47 O.S. § 14-109
Attachment 2
- ODOT Policy D-404-3 Nonpayment of Overweight Deliveries
20020212
- 02/12/02 - Pay Adjustments for Work Failing to Meet Specifications
20010316
- 02/15/02 - Post-Construction Review Process
Attachment 1
- Post Construction Review
20010212
- 02/15/02 - Contractor’s Railway Flagging Certificate
Attachment 1
- ODOT-RR010212 Contractor’s Railway Flagging Certificate
20000831
- 02/15/02 - Joint Sealant & Elastomeric Mortar
20000526
- 02/15/02 - Acceptance Testing By Certified Technicians
Attachment 1
- DTL-15 (Revised 03/97) Report on Sampling and Testing Fresh Concrete
Attachment 2
- Sample DT-Form 224 Information on Material Submitted for Testing
Attachment 3
- DT-Form 224 (Revised 01/02) Information on Material Submitted for Testing
20000321
- 02/08/07 - Speed Limits and Oversized Loads
Attachment 1
- §47-11-803. When Local Authorities May and Shall Alter Maximum Limits
Attachment 2A
- Oklahoma Highway Patrol Troop Headquarters
Attachment 2B
- Oklahoma with Counties Shown
20000225
- 01/03/14 - Change Order Instructions
Attachment 1
- Change Order Guide
Attachment 2
- DT Form 39A - Cost Breakdown for Support of Supplemental Agreement
Attachment 3
- Public Interest Finding Form (PIF)
20000105
- 10/01/2019 - Disadvantaged Business Enterprise (DBE) Monitoring Requirements
19991007
- 02/15/02 - Coarse Aggregate for Class P Concrete
19990917
- 02/15/02 - Bond Breaker Between Beams and Bridge Floor
Attachment 1
- forming Bridge Deck Haunches for Prestressed Concrete Beams
19990901
- 02/15/02 - Pile Bent Protection
Attachment 1
- Specifcations for Painting Piling
19990729
- 10/05/05 - Profilograph Settings
Attachment 1
- Analyzing Data with the computerized Ames profilograph
Attachment 2
- California Style Computerized Profilograph Setup
19990625
- 02/15/02 - Curtain Wall Substitutions
Attachment 1
- Curtain Walls for Reinforced Concrete Boxes
19990512
- 01/14/04 - Charging Time to Construction Projects
Attachment 1
- DT From 78 7-98 Time & Diary Report
Attachment 2
- DT From 78 2-02 Time & Diary Report
Attachment 3
- Monthly Time and Diary Report
Attachment 4
- Monthly Time and Diary Report
19990331
- 02/15/02 - Clarification of Construction Signs(Metric)
Attachment 1
- Construction Control Signs
19990202
- 02/15/02 - Separator Fabric Specification
19980917
- 02/15/02 - Comparison of Contract with Estimate System
19980501
- 02/15/02 - Omission of Areas for Smoothness Consideration
19971226
- 04/18/2016 - Bulletin Board Postings
19971107
- 02/15/02 - Form for Field Change Orders
Attachment 1
- Field Work Order Form
19970709
- 02/15/02 - Drilled Shafts-Permanent Casing(C.G.S.P. for Double Casing Method)
19970605
- 02/15/02 - Coarse Aggregate Gradation for Portland Cement Concrete
19970317
- 02/15/02 - Waivers of Acceptance Testing
19970115
- 02/15/02 - Certification of Materials
Attachment 1
- Sample Certification Letter
19961121
- 03/13/12 - Change Orders - F.H.W.A. Prior Approval
Attachment 1
- Form FHWA-1365
19960521
- 02/15/02 - Handling of Underground Storage Tanks
19960508
- 02/15/02 - Cancelled Material on Local Government Projects
19950623
- 11/15/06 - Documents Requiring Professional Engineer’s Seal
Attachment 1
- Use of Engineer’s Seals
Attachment 2
- Registraion Law Requirements
19950515
- 08/04/22 - Storm Water Runoff Inspections
19940414
- 02/15/02 - Scheduling of Erosion Control
19940406
- 10/24/14 - Project Completion and Acceptance
Attachment 1
- DT Form 393 (Rev. 7-14) Final Acceptance Notice
Attachment 2
- DT Form 394 (Rev. 7-14) Final Inspection Report
19940218
- 02/15/02 - Construction Joints in Continuous Reinforced Concrete Pavement
Attachment 1
- Construction Advisory
19931227
- 03/07/07 - Notification of Plant Installation
19930730
- 02/15/02 - Payments for Material-On-Hand
19930324
- 02/15/02 - Final Estimates for Processing
19920904
- 02/15/02 - Procedure for Cost Reduction Incentive Proposals
Attachment 1
- Procedure
19920713
- 02/15/02 - Approval of Asphalt Mix Design
19910429
- 02/15/02 - Use of Rotary Type Finishers for Concrete Paving
19901115
- 09/12/2016 - Operation and Control of Nuclear Density Devices
19900219
- 03/31/22 - Clarification of Asphalt Compaction Procedures
19891128
- 02/15/02 - Procedure for Handling Contractor Requests
19890831
- 03/31/22 - Final Estimate Status Report
Attachment 1
- Final Estimate Status - Sample Report
19890331
- 10/06/09 - Construction Control Directive Numbering System
HOME
Construction Engineering
Control Directives
BACK TO TOP