HOME  > Roadway Design > Support Units > Geometrics Contact Roadway

Roadway Design
Staff Members
Support Units

     Roadside Development

     Automation & Graphics

     Consultant

     Hydraulics Design

     Geometrics

     Pavement Design

     Roadway Standards

     Performance &
     Development

     Quality Assurance
Design Units
CADD Students
      (Employment)

Engineer Manager ~ Lauren Ludwig, PE
(405) 522-3513
Geometrics Sign

    Primary Responsibilities:

  • Evaluate and comment on the proposed horizontal and vertical alignments.
  • Review and determine intersection design detail (e.g., auxiliary turn lanes, intersection sight distance, turning treatments)
  • Determine interchange design details (e.g., lengths of acceleration and deceleration lanes, ramp widths, ramp alignment)
  • Provide design sketches for preparation of roadway design plans.

Oklahoma Interstate Access Approval Policy

Government Links

FHWA’s Interstate Access Justification Guide


   Roadway's Directory




Information in
pdf Format Requires
Adobe gif
HOME  > Roadway Design > Support Units > Geometrics BACK TO TOP