SPList
|
List of Special Provisions - Print and include completed form with project submission.
|
10-09-2018
|
Submission
|
Project Submission Letter
|
01-29-2019
|
QC/QA
|
QC/QA Request Form
|
N/A
|
101-1
|
Maintenance Bonds
|
05-08-2017
|
102-4
|
A + B Bidding
|
01-04-2010
|
102-9
|
Bonding Requirements for Right-Of-Way Clearance Contracts
|
N/A
|
103-1
|
Bonding Requirements
|
N/A
|
104-1
|
Railroad Flagging (with pay item)
|
N/A
|
104-2
|
Railroad Flagging (without pay item)
|
N/A
|
106-5
|
Buy America
|
03-07-2016
|
107-8
|
Legal Relations and Responsibility to Public (Railroad Insurance)
|
N/A
|
107-12
|
Federal Aviation Regulations
|
08-24-2010
|
108-1
|
Progress and Prosecution for Right-of-Way Clearance Contracts
|
02-19-2016
|
108-2
|
Administration and Extension of Contract Time (Winter Time Suspension)
|
09-27-2012
|
108-3
|
Contractors Critical Path Method (CPM) Schedule Requirements
|
N/A
|
108-5
|
Prosecution Progress (90 Days)
|
01-04-2010
|
108-6
|
Prosecution Progress (120 Days)
|
01-04-2010
|
108-23
|
Prosecution and Progress Flexible Start
|
01-04-2010
|
108-27
|
Delayed Notice to Proceed
|
01-04-2010
|
108-81
|
Disincentive for Exposed Cold-Milled Pavement
|
09-05-2014
|
108-182
|
Subletting of Contract (70%)
|
01-04-2010
|
109-3
|
Price Adjustment for Fuel
|
03-30-2011
|
109-7
|
Price Adjustment for Asphalt Binder
|
04-16-2018
|
110-1
|
General Provisions for Use of Electronic Data
|
06-22-20
|
201-1
|
Eastern Red Cedar Eradication
|
06-20-2013
|
202-2
|
Osage Nation Mineral Reservation Sandy Soil Mining Permit
|
N/A
|
221-1
|
Temporary Fiber Log
|
02-27-2013
|
246-2
|
Geogrid Earth Reinforcement
|
N/A
|
303-1
|
Aggregate Base
|
11-09-2012
|
303-2
|
Aggregate Base (Plant Mixed)
|
11-09-2012
|
317-8
|
Cement Treated Base
|
02-05-2013
|
325-1
|
Moisture Barrier Membrane
|
N/A
|
407-2
|
Bonded Hot Mix Asphalt
|
N/A
|
407-3
|
Non-Tracking (NT) Tack Material
|
02-01-2016
|
410-1
|
Milled Hot Recycling of Bituminous Material (Partial Depth) 2" Surface Recycling
|
N/A
|
411-9QA
|
Percent Within Limits (PWL) Acceptance Procedures for Asphalt Concrete Pavement
|
N/A
|
411-12
|
Longitudinal Joint Density On Asphalt Concrete Pavement
|
12-30-2014
|
411-13
|
Warm Mix Asphalt
|
01-04-2010
|
411-14
|
Asphalt Safety Edge
|
02-27-2013
|
411-15
|
Rich Intermediate Layer (RIL)
|
N/A
|
411-16
|
Hot Mix Asphalt (Lime)
|
09-27-2012
|
411-17
|
Compaction of Hot Mix Asphalt
|
03-10-2014
|
411-18
|
Intelligent Compaction of Asphalt
|
02-10-2015
|
414-17
|
Longitudinal Finish
|
05-27-10
|
414-18
|
Optimized Gradation for Portland Cement Concrete Pavement
|
10-13-2016
|
415-1
|
Bituminous (Fiber Fill) Crack Sealing
|
01-04-2010
|
430-2QA
|
Pavement and Bridge Deck Smoothness
|
01-23-2018
|
435-3
|
Fiber Reinforced, Bonded Portland Cement Concrete Overlay
|
01-04-2010
|
504-1
|
Bridge Decks, Approaches, Rails and Parapets
|
N/A
|
504-2
|
Finger Type Expansion Device
|
01-04-2010
|
504-4QA
|
Quality Control and Acceptance for Concrete Bridge Decks
|
N/A
|
504-6
|
Rail, Parapets, and Curbs
|
N/A
|
504-7
|
Bridge Deck Finish on County Bridges
|
02-16-2012
|
507-1
|
Bearing Assemblies
|
02-04-2011
|
513-1
|
Anodes
|
08-16-2011
|
516-1
|
Pulse-Echo Testing of Drilled Shafts
|
01-04-2010
|
516-3
|
Drilled Shaft Foundations
|
07-15-2014
|
524-3
|
Fiber Reinforced Polymer Material
|
N/A
|
525-1
|
Migratory Bird Nest Prevention for Bridge Structures and Culverts
|
10-18-18
|
535-1
|
Corrosion Inhibitor (Surface-Applied)
|
10-06-2011
|
613-1
|
Polypropylene Pipe Drainage Conduit
|
05-13-2015
|
619-4
|
Plugging and Abandonment of Oil Wells
|
N/A
|
619-5
|
Oil Field Equipment Removal
|
N/A
|
656-4
|
American Burying Beetle (ABB)
|
06-20-2013
|
701-14
|
Optimized Gradation for Portland Cement Concrete Pavement
|
09-19-2016
|
708-21
|
Reclaimed Asphalt Pavement and Shingles
|
N/A
|
708-22
|
Warm Mix Asphalt Material Requirements
|
11-12-2013
|
708-23
|
Hamburg Rut Testing of Hot Mix Asphalt
|
07-08-2011
|
708-24
|
Performance-Graded Asphalt Binder Using Multiple Stress Creep Recovery (MSCR) Test
|
N/A
|
708-25
|
Material Requirements for Non-Tracking (NT) Tack Material
|
02-03-2016
|
708-26
|
Plant Mix Bituminous Bases and Surfaces (Superpave)
|
03-19-2012
|
708-27
|
Lime for Asphalt Mixtures
|
08-29-2012
|
708-28
|
Multiple Stress Creep Recovery (MSCR) Testing
|
11-12-2013
|
711-1
|
Permanent Pavement Marking Tape
|
07-31-2012
|
724-1
|
Bridge Bearing Structural Steel
|
03-16-2011
|
726-1
|
Structural Steel Plate Pipe, Pipe Arches, and Arches
|
09-13-2010
|
726-2
|
Polypropylene Pipe Drainage Conduit
|
08-29-2014
|
733-1
|
Elastomeric Bearing Pads
|
10-04-2012
|
737-2
|
Anti-Graffiti Coating Systems
|
N/A
|
809-1
|
Bridge Navigation Lighting
|
01-04-2010
|
823-1
|
Temporary Traffic Signals
|
N/A
|
855-7
|
Traffic Stripe (Plastic)
|
04-09-2013
|
856-1
|
Traffic Stripe (Multi-polymer)
|
04-09-2013
|
857-2
|
Construction Zone Pavement Markings
|
07-16-2014
|
877-1
|
Portable Longitudinal Barrier
|
11-17-2011
|
880-1
|
Plastic Drums
|
08-16-11
|
880-6
|
Temporary Roadway Lighting Assembly
|
08-17-11
|
880-10
|
Traffic Surveillance
|
12-27-17
|
882-2
|
Smart Work Zone
|
N/A
|