HOMEConstruction Engineering2009 Special Provisions

>
SP Number Description Revision
Date
SPList List of Special Provisions - Print and include completed form with project submission. 05-03-2012
Submission Project Submission Letter 05-03-2012
QC/QA QC/QA Request Form N/A
102-4 A + B Bidding 01-01-2010
103-1 Bonding Requirements N/A
104-1 Railroad Flagging (with pay item) N/A
104-2 Railroad Flagging (without pay item) N/A
107-8 Legal Relations and Responsibility to Public (Railroad Insurance) N/A
107-12 Federal Aviation Regulations 08-24-2010
108-3 Contractors Critical Path Method (CPM) Schedule Requirements N/A
108-5 Prosecution Progress ( 90 Days ) 01-04-2010
108-6 Prosecution Progress ( 120 Days ) 01-04-2010
108-23 Prosecution and Progress Flexible Start 01-04-2010
108-27 Delayed Notice to Proceed 01-04-2010
108-81 Disinsentcentive for Exposed Cold-Milled Pavement 01-04-2010
108-182 Subletting of Contract ( 70% ) 01-04-2010
109-3 Price Adjustment for Fuel 03-30-2011
109-7 Price Adjustment for Asphalt Binder 11-04-2011
202-2 Osage Nation Mineral Reservation Sandy Soil Mining Permit 01-04-2010
246-2 Geogrid Earth Reinforcement N/A
325-1 Moisture Barrier Membrane N/A
407-2 Bonded Hot Mix Asphalt N/A
410-1 Milled Hot Recycling of Bituminous Material (Partial Depth) 2" Surface Recycling N/A
411-3QA Quality Control and Acceptance Procedures for Plant Mix AC Pavement N/A
411-12 Longitudinal Joint Density On Asphalt Concrete Pavement 01-04-2010
411-13 Warm Mix Asphalt 01-04-2010
411-14 Asphalt Safety Edge 11-01-2010
414-2QA Quality Control and Acceptance Procedures N/A
414-17 Longitudinal Finish 05-27-2010
415-1 Bituminous (Fiber Fill) Crack Sealing 01-04-2010
430-2QA Pavement and Bridge Deck Smoothness 11-17-2011
435-3 Fiber Reinforced, Bonded Portland Cement Concrete Overlay 01-04-2010
504-1 Bridge Decks, Approaches, Rails and Parapets N/A
504-2 Finger Type Expansion Device 01-04-2010
504-4QA Quality Control and Acceptance for Concrete Bridge Decks N/A
504-6 Rail, Parapets, and Curbs N/A
504-7 Bridge Deck Finish on County Bridges 02-16-2012
507-1 Bearing Assemblies 02-04-2011
513-1 Anodes 08-16-2011
516-1 Pulse-Echo Testing of Drilled Shafts 01-04-2010
524-3 Fiber Reinforced Polymer Material 10-28-2011
535-1 Corrosion Inhibitor ( Surface-Applied ) 10-06-2011
619-3 Building Removal and NESHAP Inspection N/A
619-4 Plugging and Abandonment of Oil Wells N/A
619-5 Oil Field Equipment Removal N/A
643-6QA Contractors Quality Control N/A
648-1QA Payment for Contractors Quality Control N/A
656-4 American Burying Beetle ( ABB ) 01-04-2010
708-22 Warm Mix Asphalt Material Requirements 01-04-2010
708-23 Hamburg Rut Testing of Hot Mix Asphalt 07-08-2011
708-26 Plant Mix Bituminous Bases and Surfaces (Superpave) 03-19-2012
724-1 Bridge Bearing Structural Steel 03-16-2011
726-1 Structural Steel Plate Pipe, Pipe Arches, and Arches 09-13-2010
733-1 Elastomeric Bearing Pads 02-04-2011
737-2 Anti-Graffiti Coating Systems N/A
809-1 Bridge Navigation Lighting 01-04-2010
823-1 Temporary Traffic Signals N/A
855-6 Thermoplastic Stripe 01-04-2010
855-7 Traffic Stripe (Plastic) 10-28-2011
856-1 Traffic Stripe (Multi-polymer) 02-04-2011
857-2 Construction Zone Pavement Markings 03-19-2012
871-1 Impact Attenuators N/A
871-2 Construction Zone Impact Attenuators N/A
877-1 Portable Longitudinal Barrier 11-17-2011
880-1 Plastic Drums 08-16-11
880-6 Temporary Roadway Lighting Assembly 08-17-11
882-2 Smart Work Zone N/A

HOMEConstruction Engineering2009 Special Provisions