HOMEConstruction Engineering2009 Special Provisions

SP Number Description Revision
Date
SPList List of Special Provisions - Print and include completed form with project submission. 10-09-2018
Submission Project Submission Letter 01-29-2019
QC/QA QC/QA Request Form N/A
101-1 Maintenance Bonds 05-08-2017
102-4 A + B Bidding 01-04-2010
102-9 Bonding Requirements for Right-Of-Way Clearance Contracts N/A
103-1 Bonding Requirements N/A
104-1 Railroad Flagging (with pay item) N/A
104-2 Railroad Flagging (without pay item) N/A
106-5 Buy America 03-07-2016
107-8 Legal Relations and Responsibility to Public (Railroad Insurance) N/A
107-12 Federal Aviation Regulations 08-24-2010
108-1 Progress and Prosecution for Right-of-Way Clearance Contracts 02-19-2016
108-2 Administration and Extension of Contract Time (Winter Time Suspension) 09-27-2012
108-3 Contractors Critical Path Method (CPM) Schedule Requirements N/A
108-5 Prosecution Progress (90 Days) 01-04-2010
108-6 Prosecution Progress (120 Days) 01-04-2010
108-23 Prosecution and Progress Flexible Start 01-04-2010
108-27 Delayed Notice to Proceed 01-04-2010
108-81 Disincentive for Exposed Cold-Milled Pavement 09-05-2014
108-182 Subletting of Contract (70%) 01-04-2010
109-3 Price Adjustment for Fuel 03-30-2011
109-7 Price Adjustment for Asphalt Binder 04-16-2018
110-1 General Provisions for Use of Electronic Data 06-22-20
201-1 Eastern Red Cedar Eradication 06-20-2013
202-2 Osage Nation Mineral Reservation Sandy Soil Mining Permit N/A
221-1 Temporary Fiber Log 02-27-2013
246-2 Geogrid Earth Reinforcement N/A
303-1 Aggregate Base 11-09-2012
303-2 Aggregate Base (Plant Mixed) 11-09-2012
317-8 Cement Treated Base 02-05-2013
325-1 Moisture Barrier Membrane N/A
407-2 Bonded Hot Mix Asphalt N/A
407-3 Non-Tracking (NT) Tack Material 02-01-2016
410-1 Milled Hot Recycling of Bituminous Material (Partial Depth) 2" Surface Recycling N/A
411-9QA Percent Within Limits (PWL) Acceptance Procedures for Asphalt Concrete Pavement N/A
411-12 Longitudinal Joint Density On Asphalt Concrete Pavement 12-30-2014
411-13 Warm Mix Asphalt 01-04-2010
411-14 Asphalt Safety Edge 02-27-2013
411-15 Rich Intermediate Layer (RIL) N/A
411-16 Hot Mix Asphalt (Lime) 09-27-2012
411-17 Compaction of Hot Mix Asphalt 03-10-2014
411-18 Intelligent Compaction of Asphalt 02-10-2015
414-17 Longitudinal Finish 05-27-10
414-18 Optimized Gradation for Portland Cement Concrete Pavement 10-13-2016
415-1 Bituminous (Fiber Fill) Crack Sealing 01-04-2010
430-2QA Pavement and Bridge Deck Smoothness 01-23-2018
435-3 Fiber Reinforced, Bonded Portland Cement Concrete Overlay 01-04-2010
504-1 Bridge Decks, Approaches, Rails and Parapets N/A
504-2 Finger Type Expansion Device 01-04-2010
504-4QA Quality Control and Acceptance for Concrete Bridge Decks N/A
504-6 Rail, Parapets, and Curbs N/A
504-7 Bridge Deck Finish on County Bridges 02-16-2012
507-1 Bearing Assemblies 02-04-2011
513-1 Anodes 08-16-2011
516-1 Pulse-Echo Testing of Drilled Shafts 01-04-2010
516-3 Drilled Shaft Foundations 07-15-2014
524-3 Fiber Reinforced Polymer Material N/A
525-1 Migratory Bird Nest Prevention for Bridge Structures and Culverts 10-18-18
535-1 Corrosion Inhibitor (Surface-Applied) 10-06-2011
613-1 Polypropylene Pipe Drainage Conduit 05-13-2015
619-4 Plugging and Abandonment of Oil Wells N/A
619-5 Oil Field Equipment Removal N/A
656-4 American Burying Beetle (ABB) 06-20-2013
701-14 Optimized Gradation for Portland Cement Concrete Pavement 09-19-2016
708-21 Reclaimed Asphalt Pavement and Shingles N/A
708-22 Warm Mix Asphalt Material Requirements 11-12-2013
708-23 Hamburg Rut Testing of Hot Mix Asphalt 07-08-2011
708-24 Performance-Graded Asphalt Binder Using Multiple Stress Creep Recovery (MSCR) Test N/A
708-25 Material Requirements for Non-Tracking (NT) Tack Material 02-03-2016
708-26 Plant Mix Bituminous Bases and Surfaces (Superpave) 03-19-2012
708-27 Lime for Asphalt Mixtures 08-29-2012
708-28 Multiple Stress Creep Recovery (MSCR) Testing 11-12-2013
711-1 Permanent Pavement Marking Tape 07-31-2012
724-1 Bridge Bearing Structural Steel 03-16-2011
726-1 Structural Steel Plate Pipe, Pipe Arches, and Arches 09-13-2010
726-2 Polypropylene Pipe Drainage Conduit 08-29-2014
733-1 Elastomeric Bearing Pads 10-04-2012
737-2 Anti-Graffiti Coating Systems N/A
809-1 Bridge Navigation Lighting 01-04-2010
823-1 Temporary Traffic Signals N/A
855-7 Traffic Stripe (Plastic) 04-09-2013
856-1 Traffic Stripe (Multi-polymer) 04-09-2013
857-2 Construction Zone Pavement Markings 07-16-2014
877-1 Portable Longitudinal Barrier 11-17-2011
880-1 Plastic Drums 08-16-11
880-6 Temporary Roadway Lighting Assembly 08-17-11
880-10 Traffic Surveillance 12-27-17
882-2 Smart Work Zone N/A

HOMEConstruction Engineering2009 Special Provisions