Roadway CAD Design Support
AUTOMATION & GRAPHICS BRANCH
|
The CADD Support addresses the requirements to effectively utilize Computer Aided Design and Drafting (CADD) for production, delivery and processing of electronic projects for the Department. In addition to software and configuration requirements, it identifies the tools, techniques, applications, standards and procedures that are to be used to produce quality products in a timely manner.
The CADD Support also serves to provide professional services administrators, project managers, consultants, in-house designers, and others, a procedure which shall be incorporated by reference into scopes and other contract documents for services. |
Branch Manager: |
Lance Grant |
(405) 522-3494 |
Automation & Graphic Supervisor: |
Carl Eldridge |
(405) 522-6088 |
Software/Hardware Liaison: |
Eddie Sells |
(405) 522-3475 |
|
|
|
|
PERFORMANCE, DEVELOPMENT AND QUALITY ASSURANCE BRANCH
|
This Technical Design section is designed to provide professional services administrators, project managers, consultants, in-house designers, and others, a procedure to incorporate by reference into scopes and other contract documents for services. It also addresses the common practices used in the development process of Roadway’s Design plans.
The Example documentation and illustrations displayed here are not to be taken as policy unless explicitly stated. They are intended to support the Design Manual, Green Book, Standards, Specifications, and any other booklets that may apply to Roadway’s calculations and design criteria. It as well identifies the tools, techniques, applications, standards and procedures that are used to produce quality products in a timely manner. The Oklahoma Department of Transportation and/or its Divisions and Branches assume no responsibility to the accuracy implied or expressly stated by these documents and/or illustrations. |
Performance & Development Branch Manager: |
Terrie Troupe-Nazari |
(405) 521-6806 |
Performance & Development Supervisor: |
Kandice Doan |
(405) 522-3122 |
CADD Specialist: |
Justin Frost |
(405) 521-6758 |
Civil Software Development: |
Clint Reininger |
(405) 595-0965 |
Quality Assurance Branch Manager: |
Vacant |
(405) 522-3494 |
Quality Assurance Supervisor: |
Michael Bickerstaff |
(405) 521-2043 |
Plan Review: |
Mickey Henry |
(405) 521-2046 |
Plan Review: |
Bill Johnson |
(405) 521-2045 |
Plan Review: |
Larry Clayton |
(405) 522-6724 |
CADD Support
|
Sheet Designs |
Title Sheet Examples |
16FEB2012 |
Title Sheet |
30AUG2011 |
General Information |
Station and Stationing |
Township, Section and Range |
Control Section and Control Sub-Section |
Design Traffic Data |
Title Sheet Test |
Typical |
15FEB2012 |
Plan-and-Profile |
28NOV2011 |
Cross-Sections |
28NOV2011 |
Policies and Procedures |
Construction Plan Review Policies & Procedures |
22SEP2011 |
Load Sheets and Check List |
Roadway Design Plans |
06MAR2012 |
Title Load Sheet |
28FEB2012 |
Typicals |
Asphalt |
04NOV2011 |
Concrete |
04NOV2011 |
Structures |
Before June 2010 |
DRAINAGE STRUCTURE (PIPE) |
05APR2010 |
SKEWED DRAINAGE STRUCTURE (BOX) |
05APR2010 |
SKEWED BOX DRAINAGE STRUCTURE (EXTENSION) |
06APR2010 |
After June 2010 |
0° DRAINAGE STRUCTURE (PIPE) |
12OCT2010 |
SKEWED DRAINAGE STRUCTURE (PIPE) |
12OCT2010 |
0° DRAINAGE STRUCTURE (PIPE) EXTENSION |
12OCT2010 |
0° SKEWED BOX DRAINAGE STRUCTURE |
12OCT2010 |
30° SKEWED BOX DRAINAGE STRUCTURE ONLY |
12OCT2010 |
0° SKEWED BOX DRAINAGE STRUCTURE (EXTENSION) |
12OCT2010 |
SuperElevation Work Sheet |
15NOV2011 |
Cells & Styles |
Survey Level Weight Linestyle and Color Guide |
Roadway Master Level Library |
Rdy Cell List |
Rdy Line Styles |
Rdy Line Weights |
Font Table and TrueType |
Deliverables |
Using the Print Command and Print Organizer |
Roadway Design Application |
InRoads Version (SS2) |
16OCT2012 |
Outline and Index |
Chapter_01 ~ Project Preparation |
Chapter_02 ~ Horizontal Alignment |
Chapter_03 ~ Vertical Alignment |
Chapter_04 ~ Template Creation |
Chapter_05 ~ Roadway Designer |
Chapter_06 ~ P&P Sheets |
Chapter_07 ~ Cross Sections |
Mass Diagram (SS2) |
16OCT2012 |
Chapter_08 ~ Storm & Sanitary |
Chapter_09 ~ Quantity Manager |
Chapter_10 ~ Helpful Tools |
Chapter_11 ~ Reports |
Production |
V8i CADD Support Files |
08DEC2011 |
How to retrieve Archived Survey Data |
08JAN2002 |
PES into DGN file |
Inserting Geo-Graphics Aerials into DGN files |
County Maps (DGN) |
Plotting Scale Factor |
Miscellaneous |
Full SuperElevation |
EARTHWORK |
2012 Side Drain Class |
Setting up MicroStation V8i |
Microstation Tips |
20AUG2008 |
MS Attributes and Locks |
20AUG2008 |
MS Alternate Key-ins |
20AUG2008 |
Connecting with Bridgit Meetings |
Forms |
DEQ Notice of Intent_Form606-002A |
13SEP2012 |
Memos |
Grading Width Revision |
26APR2007 |
Base and Dimensioning |
18JUN2008 |
AMG (Automated Machine Grading) |
File & Folder Compress Files Setup |
06MAY2014 |
|