INCOG (Tulsa Area) Project List - As Planned for the Bid Opening shown

Information source is the ODOT Programs Division Job Piece system - Sun 9/13/2009 12:19:27 PM
Note: This potential project list has been compiled in support of ARRA project preparations. All data should be considered preliminary and will be subject to change without notice. The completion of the encompassed projects on an accelerated schedule is entirely dependent upon the subsequent availability of ARRA funding. The projects may be ultimately financed with multiple funding sources.




County Bid
Opening
Job
Piece
Project Hwy.
No
Work Type
Description
Job
Description
Length Estimated
Cost
Fund
Code
ARRA
Funds
Federal
Funds
State
Funds
Other
Funds

TULSA 10/2009 2668404 STP -STIM (264) IG CT ST RESURFACE BROKEN ARROW ARRA; ELM PLACE - NEW ORLEANS ST TO FLORENCE ST 1 $1,257,450.00 0C230 $1,257,000.00 $0.00 $0.00 $0.00
0L230 $0.00 $450.00 $0.00 $0.00
Project Total $1,257,450.00   $1,257,000.00 $450.00 $0.00 $0.00

TULSA 10/2009 2668804 STP -STIM (268) IG CT ST RESURFACE BROKEN ARROW ARRA: 9TH STREET AT HOUSTON STREET 0.25 $314,857.00 0C230 $314,000.00 $0.00 $0.00 $0.00
0L230 $0.00 $857.00 $0.00 $0.00
Project Total $314,857.00   $314,000.00 $857.00 $0.00 $0.00

TULSA 10/2009 2668904 STP -STIM (269) IG CT ST TRAFFIC SIGNALS BROKEN ARROW ARRA: ALBANY ST AT STONE RIDGE DRIVE(TRAFFIC SIGNALS)(DEL FR 08-09, ADD TO 10-09; ENVIRON ISSUES) 0.125 $140,711.00 0C230 $140,000.00 $0.00 $0.00 $0.00
0L230 $0.00 $711.00 $0.00 $0.00
Project Total $140,711.00   $140,000.00 $711.00 $0.00 $0.00

TULSA 10/2009 2669004 STP -STIM (270) IG CT ST TRAFFIC SIGNALS BROKEN ARROW ARRA: NEW ORLEANS AT 9TH ST(TRAFFIC SIGNALS) (DEL FR 08-09, ADD TO 10-09; ENVIRON ISSUES) 0.125 $140,711.00 0C230 $140,000.00 $0.00 $0.00 $0.00
0L230 $0.00 $711.00 $0.00 $0.00
Project Total $140,711.00   $140,000.00 $711.00 $0.00 $0.00

TULSA 10/2009 2669104 STP -STIM (271) IG CT ST TRAFFIC SIGNALS BROEKN ARROW ARRA: ELM PLACE AT STONEWOOD DRIVE(TRAFFIC SIGNALS) (DEL FR 08-09, ADD TO 10-09; ENVIRON ISSUES) 0 $140,711.00 0C230 $140,000.00 $0.00 $0.00 $0.00
0L230 $0.00 $711.00 $0.00 $0.00
Project Total $140,711.00   $140,000.00 $711.00 $0.00 $0.00

TULSA 10/2009 2670104 STP -STIM (282) IG CT ST GRADE, DRAIN & SURFACE TULSA ARRA: YALE AVE FROM ADMIRAL PLACE TO PINE STREET 1 $1,615,000.00 0C230 $1,600,000.00 $0.00 $0.00 $0.00
0L230 $0.00 $15,000.00 $0.00 $0.00
Project Total $1,615,000.00   $1,600,000.00 $15,000.00 $0.00 $0.00

TULSA 10/2009 2696804 STP -STIM (482) IG CT ST INTERSECTION MOD. & TRAF. SIGNALS TULSA ARRA: 21ST AT SHERIDAN ROAD 0 $1,250,000.00 0C230 $1,237,500.00 $0.00 $0.00 $0.00
0L230 $0.00 $12,500.00 $0.00 $0.00
Project Total $1,250,000.00   $1,237,500.00 $12,500.00 $0.00 $0.00