INCOG (Tulsa Area) Project List - As Planned for the Bid Opening shown
County |
Bid Opening |
Job Piece |
Project |
Hwy. No |
Work Type Description |
Job Description |
Length |
Estimated Cost |
Fund Code |
ARRA Funds |
Federal Funds |
State Funds |
Other Funds |
|
CREEK |
/ |
2669804 |
STP -STIM (279) IG |
CT ST |
GRADE, DRAIN & SURFACE |
SAPULPA ARRA: E. LINE ST FROM MISSION ST TO MOCCASIN PLACE |
0 |
$698,540.00 |
0L230 |
$0.00 |
$540.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0C230 |
$698,000.00 |
$0.00 |
$0.00 |
$0.00 |
Project Total |
$698,540.00 |
|
$698,000.00 |
$540.00 |
$0.00 |
$0.00 |
|
TULSA |
/ |
2668504 |
STP -STIM (265) IG |
CT ST |
RESURFACE |
BROKEN ARROW ARRA: ELM PLACE & HOUSTON STREET |
0 |
$299,190.00 |
0C230 |
$299,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L230 |
$0.00 |
$190.00 |
$0.00 |
$0.00 |
Project Total |
$299,190.00 |
|
$299,000.00 |
$190.00 |
$0.00 |
$0.00 |
|
TULSA |
07/2009 |
2669704 |
STP -STIM (278) IG |
CT ST |
RESURFACE |
SAND SPRINGS ARRA: EUCHEE CR BLVD TO NW |
0 |
$630,595.00 |
0C230 |
$585,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L230 |
$0.00 |
$45,595.00 |
$0.00 |
$0.00 |
Project Total |
$630,595.00 |
|
$585,000.00 |
$45,595.00 |
$0.00 |
$0.00 |
|
TULSA |
07/2009 |
2669706 |
STP -STIM (422) IG |
CT ST |
RESURFACE |
SAND SPRINGS ARRA: E 2ND STREET - MAIN TO ADAMS |
0 |
$290,825.00 |
0C230 |
$250,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L230 |
$0.00 |
$40,825.00 |
$0.00 |
$0.00 |
Project Total |
$290,825.00 |
|
$250,000.00 |
$40,825.00 |
$0.00 |
$0.00 |
|
WAGONER |
/ |
2669404 |
STP -STIM (274) IG |
CT ST |
RESURFACE |
COWETA ARRA: 151ST STREET FROM DIVISION TO BROADWAY/SH-72 |
0 |
$205,500.00 |
0C230 |
$177,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0CITY |
$0.00 |
$0.00 |
$0.00 |
$28,229.00 |
|
|
|
|
|
|
|
|
| 0L230 |
$0.00 |
$271.00 |
$0.00 |
$0.00 |
Project Total |
$205,500.00 |
|
$177,000.00 |
$271.00 |
$0.00 |
$28,229.00 |
|
Information source is the ODOT Programs Division Job Piece system - Mon 6/29/2009 1:55:06 PM
Note: This potential project list has been compiled in support of ARRA project preparations.
All data should be considered preliminary and will be subject to change without notice. The completion of the
encompassed projects on an accelerated schedule is entirely dependent upon the subsequent availability of
ARRA funding. The projects may be ultimately financed with multiple funding sources.
|