Pedestrian Improvement Project List - As Planned for the Bid Opening shown
County |
Bid Opening |
Job Piece |
Project |
Hwy. No |
Work Type Description |
Job Description |
Length |
Estimated Cost |
Fund Code |
ARRA Funds |
Federal Funds |
State Funds |
Other Funds |
|
ALFALFA |
/ |
2720604 |
STP -STIM (467) EH |
SH045 |
PEDESTRIAN IMPROVEMENTS |
GOLTRY ARRA SH-45 FROM 7TH ST SOUTH TO 1/4 MI SOUTH OF MAIN ST |
0.1 |
$848,000.00 |
0C220 |
$800,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L220 |
$0.00 |
$48,000.00 |
$0.00 |
$0.00 |
Project Total |
$848,000.00 |
|
$800,000.00 |
$48,000.00 |
$0.00 |
$0.00 |
|
BEAVER |
/ |
2720704 |
STP -STIM (468) EH |
US064 |
PEDESTRIAN IMPROVEMENTS |
FORGAN ARRA US-270 FROM TEXAS ST TO MISSISSIPPI AVE |
0.1 |
$954,000.00 |
0C220 |
$900,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L220 |
$0.00 |
$54,000.00 |
$0.00 |
$0.00 |
Project Total |
$954,000.00 |
|
$900,000.00 |
$54,000.00 |
$0.00 |
$0.00 |
|
BLAINE |
/ |
2720004 |
STP -STIM (461) EH |
SH051 |
PEDESTRIAN IMPROVEMENTS |
CANTON ARRA SH-51 FROM GRANT ST TO LINCOLN ST; SH-58 FROM MAIN ST TOPARK ST |
0.1 |
$848,000.00 |
0L220 |
$0.00 |
$48,000.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0C220 |
$800,000.00 |
$0.00 |
$0.00 |
$0.00 |
Project Total |
$848,000.00 |
|
$800,000.00 |
$48,000.00 |
$0.00 |
$0.00 |
|
BRYAN |
/ |
2718204 |
STP -STIM (443) EH |
SH022 |
PEDESTRIAN IMPROVEMENTS |
CADDO ARRA SH-22 FROM MAIN ST TO ARKANSAS ST |
0.1 |
$424,000.00 |
0C220 |
$400,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L220 |
$0.00 |
$24,000.00 |
$0.00 |
$0.00 |
Project Total |
$424,000.00 |
|
$400,000.00 |
$24,000.00 |
$0.00 |
$0.00 |
|
CADDO |
/ |
2721304 |
STP -STIM (474) EH |
US277 |
PEDESTRIAN IMPROVEMENTS |
CEMENT ARRA US-277(SH-19) FROM "F" AVE WEST TO ONE BLK WEST OF MAIN ST |
0.1 |
$795,000.00 |
0C220 |
$750,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L220 |
$0.00 |
$45,000.00 |
$0.00 |
$0.00 |
Project Total |
$795,000.00 |
|
$750,000.00 |
$45,000.00 |
$0.00 |
$0.00 |
|
CARTER |
/ |
2721404 |
STP -STIM (475) EH |
SH053A |
PEDESTRIAN IMPROVEMENTS |
GENE AUTRY ARRA SH-53A FROM GRANT AVE TO MILL ST (WEST SIDE ONLY) |
0.1 |
$318,000.00 |
0L220 |
$0.00 |
$18,000.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0C220 |
$300,000.00 |
$0.00 |
$0.00 |
$0.00 |
Project Total |
$318,000.00 |
|
$300,000.00 |
$18,000.00 |
$0.00 |
$0.00 |
|
CHEROKEE |
/ |
2717204 |
STP -STIM (434) EH |
SH051 |
PEDESTRIAN IMPROVEMENTS |
HULBERT ARRA: SH-51 RIDER LN TO HALF BLOCK EAST OF THE POST OFFICE |
0.1 |
$530,000.00 |
0C220 |
$500,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L220 |
$0.00 |
$30,000.00 |
$0.00 |
$0.00 |
Project Total |
$530,000.00 |
|
$500,000.00 |
$30,000.00 |
$0.00 |
$0.00 |
|
COTTON |
/ |
2721004 |
STP -STIM (471) EH |
SH065 |
PEDESTRIAN IMPROVEMENTS |
TEMPLE ARRA SH-65 FROM OREGON ST SOUTH TO OKLAHOMA ST |
0.1 |
$636,000.00 |
0C220 |
$600,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L220 |
$0.00 |
$36,000.00 |
$0.00 |
$0.00 |
Project Total |
$636,000.00 |
|
$600,000.00 |
$36,000.00 |
$0.00 |
$0.00 |
|
CREEK |
/ |
2721504 |
STP -STIM (476) EH |
US075A |
PEDESTRIAN IMPROVEMENTS |
MOUNDS ARRA US-75A FROM 9TH ST TO 14TH ST |
0.2 |
$795,000.00 |
0C220 |
$750,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L220 |
$0.00 |
$45,000.00 |
$0.00 |
$0.00 |
Project Total |
$795,000.00 |
|
$750,000.00 |
$45,000.00 |
$0.00 |
$0.00 |
|
DEWEY |
/ |
2719904 |
STP -STIM (460) EH |
US060 |
PEDESTRIAN IMPROVEMENTS |
VICI ARRA SH-51 FROM SPECK ST EAST TO BROWN ST |
0.1 |
$636,000.00 |
0L220 |
$0.00 |
$36,000.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0C220 |
$600,000.00 |
$0.00 |
$0.00 |
$0.00 |
Project Total |
$636,000.00 |
|
$600,000.00 |
$36,000.00 |
$0.00 |
$0.00 |
|
ELLIS |
/ |
2720404 |
STP -STIM (465) EH |
US283 |
PEDESTRIAN IMPROVEMENTS |
SHATTUCK ARRA US-283 FROM GRAND AVE SOUTH TO 10TH ST |
0.1 |
$530,000.00 |
0L220 |
$0.00 |
$30,000.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0C220 |
$500,000.00 |
$0.00 |
$0.00 |
$0.00 |
Project Total |
$530,000.00 |
|
$500,000.00 |
$30,000.00 |
$0.00 |
$0.00 |
|
ELLIS |
/ |
2720504 |
STP -STIM (466) EH |
SH046 |
PEDESTRIAN IMPROVEMENTS |
GAGE ARRA SH-46 FROM NORTH ST SOUTH TO SH-46/SH-15 JCT |
0.1 |
$636,000.00 |
0C220 |
$600,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L220 |
$0.00 |
$36,000.00 |
$0.00 |
$0.00 |
Project Total |
$636,000.00 |
|
$600,000.00 |
$36,000.00 |
$0.00 |
$0.00 |
|
GARVIN |
/ |
2718804 |
STP -STIM (449) EH |
SH019 |
PEDESTRIAN IMPROVEMENTS |
MAYSVILLE ARRA SH-19/SH-74 EAST TO PINE ALLEY |
0.1 |
$530,000.00 |
0C220 |
$500,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L220 |
$0.00 |
$30,000.00 |
$0.00 |
$0.00 |
Project Total |
$530,000.00 |
|
$500,000.00 |
$30,000.00 |
$0.00 |
$0.00 |
|
GRADY |
/ |
2720904 |
STP -STIM (470) EH |
US081 |
PEDESTRIAN IMPROVEMENTS |
POCASSET ARRA US-81 FROM 1ST ST SOUTH TO 5TH ST |
0.1 |
$371,000.00 |
0C220 |
$350,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L220 |
$0.00 |
$21,000.00 |
$0.00 |
$0.00 |
Project Total |
$371,000.00 |
|
$350,000.00 |
$21,000.00 |
$0.00 |
$0.00 |
|
GRADY |
/ |
2721104 |
STP -STIM (472) EH |
SH017 |
PEDESTRIAN IMPROVEMENTS |
RUSH SPRINGS ARRA SH-17/SH-81B JCT TO SH-81 |
0.1 |
$1,060,000.00 |
0C220 |
$1,000,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L220 |
$0.00 |
$60,000.00 |
$0.00 |
$0.00 |
Project Total |
$1,060,000.00 |
|
$1,000,000.00 |
$60,000.00 |
$0.00 |
$0.00 |
|
GREER |
/ |
2720104 |
STP -STIM (462) EH |
SH034 |
PEDESTRIAN IMPROVEMENTS |
MANGUM ARRA SH-34 FROM EAST JACKSON ST TO EAST SOUTH ST |
0.1 |
$848,000.00 |
0L220 |
$0.00 |
$48,000.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0C220 |
$800,000.00 |
$0.00 |
$0.00 |
$0.00 |
Project Total |
$848,000.00 |
|
$800,000.00 |
$48,000.00 |
$0.00 |
$0.00 |
|
HARMON |
/ |
2719704 |
STP -STIM (458) EH |
US062 |
PEDESTRIAN IMPROVEMENTS |
HOLLIS ARRA US-62 FROM MAIN ST EAST TO 1ST ST |
0.1 |
$424,000.00 |
0L220 |
$0.00 |
$24,000.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0C220 |
$400,000.00 |
$0.00 |
$0.00 |
$0.00 |
Project Total |
$424,000.00 |
|
$400,000.00 |
$24,000.00 |
$0.00 |
$0.00 |
|
HASKELL |
/ |
2717704 |
STP -STIM (439) EH |
SH031 |
PEDESTRIAN IMPROVEMENTS |
KINTA ARRA SH-31 FROM HOYT TO MAIN; SH-2 FROM 4TH ST TO NORTH OF 2ND ST |
0.1 |
$530,000.00 |
0C220 |
$500,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L220 |
$0.00 |
$30,000.00 |
$0.00 |
$0.00 |
Project Total |
$530,000.00 |
|
$500,000.00 |
$30,000.00 |
$0.00 |
$0.00 |
|
JEFFERSON |
/ |
2721204 |
STP -STIM (473) EH |
SH005 |
PEDESTRIAN IMPROVEMENTS |
HASTINGS ARRA SH-5 FROM COMMERCIAL AVE TO 4TH ST |
0.1 |
$424,000.00 |
0L220 |
$0.00 |
$24,000.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0C220 |
$400,000.00 |
$0.00 |
$0.00 |
$0.00 |
Project Total |
$424,000.00 |
|
$400,000.00 |
$24,000.00 |
$0.00 |
$0.00 |
|
KAY |
/ |
2719104 |
STP -STIM (452) EH |
US077 |
PEDESTRIAN IMPROVEMENTS |
TONKAWA ARRA US-77/US-60 FROM GRAND AVE TO PARK AVE & MAIN ST TOPUBLIC ST |
0.1 |
$795,000.00 |
0L220 |
$0.00 |
$45,000.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0C220 |
$750,000.00 |
$0.00 |
$0.00 |
$0.00 |
Project Total |
$795,000.00 |
|
$750,000.00 |
$45,000.00 |
$0.00 |
$0.00 |
|
KINGFISHER |
/ |
2719204 |
STP -STIM (453) EH |
US081 |
PEDESTRIAN IMPROVEMENTS |
OKARCHE ARRA US-81 FROM IOWA ST NORTH TO MISSOURI (EAST SIDE ONLY) &MEMORIAL (WEST SIDE) |
0.1 |
$424,000.00 |
0L220 |
$0.00 |
$24,000.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0C220 |
$400,000.00 |
$0.00 |
$0.00 |
$0.00 |
Project Total |
$424,000.00 |
|
$400,000.00 |
$24,000.00 |
$0.00 |
$0.00 |
|
KINGFISHER |
/ |
2719304 |
STP -STIM (454) EH |
US081 |
PEDESTRIAN IMPROVEMENTS |
HENNESSEY ARRA US-81 FROM IOWA ST SOUTH TO 6TH ST |
0.1 |
$848,000.00 |
0C220 |
$800,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L220 |
$0.00 |
$48,000.00 |
$0.00 |
$0.00 |
Project Total |
$848,000.00 |
|
$800,000.00 |
$48,000.00 |
$0.00 |
$0.00 |
|
KINGFISHER |
/ |
2719604 |
STP -STIM (457) EH |
US081 |
PEDESTRIAN IMPROVEMENTS |
KINGFISHER ARRA US-81 NORTH OF SH-33 RECONSTRUCTION OF THREE INTERSECTIONS |
0.87 |
$318,000.00 |
0L220 |
$0.00 |
$18,000.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0C220 |
$300,000.00 |
$0.00 |
$0.00 |
$0.00 |
Project Total |
$318,000.00 |
|
$300,000.00 |
$18,000.00 |
$0.00 |
$0.00 |
|
KIOWA |
/ |
2720204 |
STP -STIM (463) EH |
US183 |
PEDESTRIAN IMPROVEMENTS |
HOBART ARRA US-183 |
1 |
$848,000.00 |
0C220 |
$800,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L220 |
$0.00 |
$48,000.00 |
$0.00 |
$0.00 |
Project Total |
$848,000.00 |
|
$800,000.00 |
$48,000.00 |
$0.00 |
$0.00 |
|
LEFLORE |
/ |
2717904 |
STP -STIM (441) EH |
US271 |
PEDESTRIAN IMPROVEMENTS |
TALIHINA ARRA US-271 FROM 1ST ST TO DUKE ST 1/2 BLOCK NORTH ON SH-1 |
0.1 |
$530,000.00 |
0C220 |
$500,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L220 |
$0.00 |
$30,000.00 |
$0.00 |
$0.00 |
Project Total |
$530,000.00 |
|
$500,000.00 |
$30,000.00 |
$0.00 |
$0.00 |
|
LINCOLN |
/ |
2718504 |
STP -STIM (446) EH |
SH018 |
PEDESTRIAN IMPROVEMENTS |
AGRA ARRA SH-18 HAYES ST TO WASHINGTON ST |
0.1 |
$530,000.00 |
0C220 |
$500,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L220 |
$0.00 |
$30,000.00 |
$0.00 |
$0.00 |
Project Total |
$530,000.00 |
|
$500,000.00 |
$30,000.00 |
$0.00 |
$0.00 |
|
LINCOLN |
/ |
2718604 |
STP -STIM (447) EH |
SH105 |
PEDESTRIAN IMPROVEMENTS |
TRYON ARRA SH-105 FROM OKLAHOMA ST TO 1ST ST |
0.1 |
$424,000.00 |
0C220 |
$400,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L220 |
$0.00 |
$24,000.00 |
$0.00 |
$0.00 |
Project Total |
$424,000.00 |
|
$400,000.00 |
$24,000.00 |
$0.00 |
$0.00 |
|
LOGAN |
/ |
2719404 |
STP -STIM (455) EH |
SH074 |
PEDESTRIAN IMPROVEMENTS |
CRESCENT ARRA SH-74 FROM NORTH LOCUST ST SOUTH TO WEST ADAMS ST |
0.1 |
$477,000.00 |
0L220 |
$0.00 |
$27,000.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0C220 |
$450,000.00 |
$0.00 |
$0.00 |
$0.00 |
Project Total |
$477,000.00 |
|
$450,000.00 |
$27,000.00 |
$0.00 |
$0.00 |
|
LOGAN |
/ |
2719504 |
STP -STIM (456) EH |
SH000B |
PEDESTRIAN IMPROVEMENTS |
LANGSTON ARRA SH-OB FROM WASHINGTON ST EAST TO MARTIN LUTHER KING ST |
0.01 |
$1,590,000.00 |
0L220 |
$0.00 |
$90,000.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0C220 |
$1,500,000.00 |
$0.00 |
$0.00 |
$0.00 |
Project Total |
$1,590,000.00 |
|
$1,500,000.00 |
$90,000.00 |
$0.00 |
$0.00 |
|
MCCURTAIN |
/ |
2718104 |
STP -STIM (442) EH |
US070 |
PEDESTRIAN IMPROVEMENTS |
BROKEN BOW ARRA US-70 FROM PARK DR TO CHATA RD; US-259 FROM US-70 NORTH0.4 MI (WEST SIDE ONLY) |
0.1 |
$530,000.00 |
0C220 |
$500,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L220 |
$0.00 |
$30,000.00 |
$0.00 |
$0.00 |
Project Total |
$530,000.00 |
|
$500,000.00 |
$30,000.00 |
$0.00 |
$0.00 |
|
MARSHALL |
/ |
2718404 |
STP -STIM (445) EH |
US070 |
PEDESTRIAN IMPROVEMENTS |
KINGSTON ARRA US-70 FROM MAYTUBBY ST TO HANEY ST; US-70B FROM US-70 TO1ST ST |
0.1 |
$424,000.00 |
0C220 |
$400,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L220 |
$0.00 |
$24,000.00 |
$0.00 |
$0.00 |
Project Total |
$424,000.00 |
|
$400,000.00 |
$24,000.00 |
$0.00 |
$0.00 |
|
MAYES |
/ |
2721904 |
STP -STIM (480) EH |
US412A |
PEDESTRIAN IMPROVEMENTS |
LOCUST GROVE ARRA US-412A FROM BROADWAY EAST TO CHEROKEE ST |
0.1 |
$636,000.00 |
0C220 |
$600,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L220 |
$0.00 |
$36,000.00 |
$0.00 |
$0.00 |
Project Total |
$636,000.00 |
|
$600,000.00 |
$36,000.00 |
$0.00 |
$0.00 |
|
MURRAY |
/ |
2740504 |
STP -STIM (516) EH |
SH007 |
PEDESTRIAN IMPROVEMENTS |
SULPHUR ARRA SH-7 FROM 9TH ST EAST 0.521 MI TO FIRST ST |
0.521 |
$689,000.00 |
0L220 |
$0.00 |
$39,000.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0C220 |
$650,000.00 |
$0.00 |
$0.00 |
$0.00 |
Project Total |
$689,000.00 |
|
$650,000.00 |
$39,000.00 |
$0.00 |
$0.00 |
|
MUSKOGEE |
/ |
2717304 |
STP -STIM (435) EH |
SH072 |
PEDESTRIAN IMPROVEMENTS |
COUNCIL HILL ARRA: SH-72 FROM 4TH ST TO 8TH ST (WEST SIDE ONLY) |
0.1 |
$477,000.00 |
0L220 |
$0.00 |
$27,000.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0C220 |
$450,000.00 |
$0.00 |
$0.00 |
$0.00 |
Project Total |
$477,000.00 |
|
$450,000.00 |
$27,000.00 |
$0.00 |
$0.00 |
|
MUSKOGEE |
/ |
2717404 |
STP -STIM (436) EH |
SH002 |
PEDESTRIAN IMPROVEMENTS |
PORUM ARRA SH-2 FROM HALF BLOCK NORTH OF OSAGE SOUTH TO CHEROKEE AVE |
0.1 |
$636,000.00 |
0C220 |
$600,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L220 |
$0.00 |
$36,000.00 |
$0.00 |
$0.00 |
Project Total |
$636,000.00 |
|
$600,000.00 |
$36,000.00 |
$0.00 |
$0.00 |
|
MUSKOGEE |
/ |
2717604 |
STP -STIM (438) EH |
US062 |
PEDESTRIAN IMPROVEMENTS |
BOYNTON ARRA SH-72 FROM LUCILLE AVE NORTH TO NORTH OF KENEFICK AVE |
0.1 |
$318,000.00 |
0C220 |
$300,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L220 |
$0.00 |
$18,000.00 |
$0.00 |
$0.00 |
Project Total |
$318,000.00 |
|
$300,000.00 |
$18,000.00 |
$0.00 |
$0.00 |
|
NOWATA |
/ |
2721604 |
STP -STIM (477) EH |
US060 |
PEDESTRIAN IMPROVEMENTS |
NOWATA ARRA US-60 FROM DELAWARE OAK ST |
0.1 |
$636,000.00 |
0C220 |
$600,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L220 |
$0.00 |
$36,000.00 |
$0.00 |
$0.00 |
Project Total |
$636,000.00 |
|
$600,000.00 |
$36,000.00 |
$0.00 |
$0.00 |
|
OKFUSKEE |
/ |
2718904 |
STP -STIM (450) EH |
SH027 |
PEDESTRIAN IMPROVEMENTS |
OKEMAH ARRA SH-27 FROM 200' NORTH OF I-40 NORTH TO SH-56/US-62 JCT(EAST SIDE ONLY) |
0.75 |
$636,000.00 |
0L220 |
$0.00 |
$36,000.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0C220 |
$600,000.00 |
$0.00 |
$0.00 |
$0.00 |
Project Total |
$636,000.00 |
|
$600,000.00 |
$36,000.00 |
$0.00 |
$0.00 |
|
OSAGE |
/ |
2721704 |
STP -STIM (478) EH |
SH018 |
PEDESTRIAN IMPROVEMENTS |
FAIRFAX ARRA SH-18 FROM WALNUT ST TO MULBERRY ST |
0.1 |
$636,000.00 |
0L220 |
$0.00 |
$36,000.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0C220 |
$600,000.00 |
$0.00 |
$0.00 |
$0.00 |
Project Total |
$636,000.00 |
|
$600,000.00 |
$36,000.00 |
$0.00 |
$0.00 |
|
OTTAWA |
/ |
2721804 |
STP -STIM (479) EH |
US069 |
PEDESTRIAN IMPROVEMENTS |
QUAPAW ARRA US-69A FROM 1ST ST SOUTH TO 4TH ST |
0.1 |
$795,000.00 |
0L220 |
$0.00 |
$45,000.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0C220 |
$750,000.00 |
$0.00 |
$0.00 |
$0.00 |
Project Total |
$795,000.00 |
|
$750,000.00 |
$45,000.00 |
$0.00 |
$0.00 |
|
OTTAWA |
/ |
2724804 |
STP -STIM (489) EH |
US069 |
PEDESTRIAN IMPROVEMENTS |
MIAMI ARRA US-69 FROM C ST SW TO A ST SW 4 BLK; SH-10 FROM A ST SW EAST1.5 BLK |
0.1 |
$1,060,000.00 |
0L220 |
$0.00 |
$60,000.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0C220 |
$1,000,000.00 |
$0.00 |
$0.00 |
$0.00 |
Project Total |
$1,060,000.00 |
|
$1,000,000.00 |
$60,000.00 |
$0.00 |
$0.00 |
|
PITTSBURG |
/ |
2724404 |
STP -STIM (485) EH |
US069 |
PEDESTRIAN IMPROVEMENTS |
KIOWA ARRA US-69 START & END AT THE CURB & GUTTER BOTH SIDES OF ROAD 8/10MI LONG |
0.8 |
$1,060,000.00 |
0C220 |
$1,000,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L220 |
$0.00 |
$60,000.00 |
$0.00 |
$0.00 |
Project Total |
$1,060,000.00 |
|
$1,000,000.00 |
$60,000.00 |
$0.00 |
$0.00 |
|
PUSHMATAHA |
/ |
2718304 |
STP -STIM (444) EH |
US271 |
PEDESTRIAN IMPROVEMENTS |
ANTLERS ARRA US-271 FROM SW "B" ST TO SE "E" ST |
0.1 |
$848,000.00 |
0C220 |
$800,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L220 |
$0.00 |
$48,000.00 |
$0.00 |
$0.00 |
Project Total |
$848,000.00 |
|
$800,000.00 |
$48,000.00 |
$0.00 |
$0.00 |
|
SEMINOLE |
/ |
2718704 |
STP -STIM (448) EH |
SH056 |
PEDESTRIAN IMPROVEMENTS |
SASAKWA ARRA SH-56 FROM PINE ST TO CHESTNUT ST |
0.1 |
$530,000.00 |
0C220 |
$500,000.00 |
$0.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0L220 |
$0.00 |
$30,000.00 |
$0.00 |
$0.00 |
Project Total |
$530,000.00 |
|
$500,000.00 |
$30,000.00 |
$0.00 |
$0.00 |
|
SEMINOLE |
/ |
2719004 |
STP -STIM (451) EH |
SH039 |
PEDESTRIAN IMPROVEMENTS |
KONAWA ARRA SH-39 FROM 3RD ST TO SOUTH ST |
0.1 |
$636,000.00 |
0L220 |
$0.00 |
$36,000.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0C220 |
$600,000.00 |
$0.00 |
$0.00 |
$0.00 |
Project Total |
$636,000.00 |
|
$600,000.00 |
$36,000.00 |
$0.00 |
$0.00 |
|
SEQUOYAH |
/ |
2717504 |
STP -STIM (437) EH |
US064 |
PEDESTRIAN IMPROVEMENTS |
VIAN ARRA US-64 FROM BLACKSTONE TO KENNEDY; SH-82 FROM MAIN TO SEQUOYAH |
0.1 |
$795,000.00 |
0L220 |
$0.00 |
$45,000.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0C220 |
$750,000.00 |
$0.00 |
$0.00 |
$0.00 |
Project Total |
$795,000.00 |
|
$750,000.00 |
$45,000.00 |
$0.00 |
$0.00 |
|
WAGONER |
/ |
2724304 |
STP -STIM (484) EH |
SH051B |
PEDESTRIAN IMPROVEMENTS |
PORTER ARRA SH-51B FROM HALE ST SOUTH 6 BLK TO BELAIRE ST |
0.5 |
$795,000.00 |
0L220 |
$0.00 |
$45,000.00 |
$0.00 |
$0.00 |
|
|
|
|
|
|
|
|
| 0C220 |
$750,000.00 |
$0.00 |
$0.00 |
$0.00 |
Project Total |
$795,000.00 |
|
$750,000.00 |
$45,000.00 |
$0.00 |
$0.00 |
|
Information source is the ODOT Programs Division Job Piece system - Tue 12/29/2009 8:19:59 PM
Note: This potential project list has been compiled in support of ARRA project preparations.
All data should be considered preliminary and will be subject to change without notice. The completion of the
encompassed projects on an accelerated schedule is entirely dependent upon the subsequent availability of
ARRA funding. The projects may be ultimately financed with multiple funding sources.
|