Information source is the ODOT Programs Division Job Piece system - Mon 3/16/2009 1:00:53 PM |
County | Bid Opening |
Job Piece ## |
Project | Hwy. No |
Work Type Description |
Job Description |
Length | Estimated Cost |
Fund Code |
ARRA Funds |
Federal Funds |
State Funds |
Other Funds |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
|||||||||||||
ATOKA | 03/2009 | 2024911 | NH-STIM(009) | SH003 | GRADE, DRAIN & SURFACE | SH-3: FROM 0.33 MI WEST OF THE PUSHMATAHA C/L EAST 1.82 MI | 1.82 | $5,692,271.00 | 0LZ10 | $0.00 | $394,803.00 | $0.00 | $0.00 |
0C240 | $5,297,468.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $5,692,271.00 | $5,297,468.00 | $394,803.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
ATOKA | 03/2009 | 2634404 | NH-STIM(150) **NHY-013N(133)3R |
US069 | PAVEMENT REHABILITATION | US-69 BEG APPROX 1.44 MILE NORTH OF SH-75W & EXT NORTH APPROX 3.8 MILE.WITH 412 FOOT EXCEPTION FOR NORTH BOGGY RIVER BRIDGE, NORTHBOUND ONLY | 3.8 | $2,318,130.00 | 0LZ20 | $0.00 | $131,215.00 | $0.00 | $0.00 |
0C240 | $2,186,915.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $2,318,130.00 | $2,186,915.00 | $131,215.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
BECKHAM | 03/2009 | 2437205 | IM-STIM(024) | IS040 | PAVEMENT REHABILITATION | I-40: RESURFACE FROM MILEPOST 25 TO 33 | 8 | $18,997,050.00 | 0LZ10 | $0.00 | $1,089,456.00 | $0.00 | $0.00 |
0C240 | $17,907,594.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $18,997,050.00 | $17,907,594.00 | $1,089,456.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
BRYAN | 03/2009 | 2629504 | NH-STIM(152) **NHY-013N(127)3R |
US069 | PAVEMENT REHABILITATION | US-69 BEG APPROX 0.21 MI NORTH OF TEXAS S/L, EXTEND NORTH APPROX 5.26 MILE(NORTH & SOUTHBOUND LANES) | 5.26 | $5,235,118.00 | 0C240 | $4,938,790.00 | $0.00 | $0.00 | $0.00 |
0LZ20 | $0.00 | $296,328.00 | $0.00 | $0.00 | |||||||||
Project Total | $5,235,118.00 | $4,938,790.00 | $296,328.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
CANADIAN | 03/2009 | 2442406 | IM-STIM(015) | IS040 | PAVEMENT REHABILITATION | I-40: FROM FROM MILE MARKER 132 TO MILE MARKER 136(PAVE & BR REHAB) | 4 | $40,730,235.00 | 0C240 | $38,283,240.00 | $0.00 | $0.00 | $0.00 |
0LZ20 | $0.00 | $2,446,995.00 | $0.00 | $0.00 | |||||||||
Project Total | $40,730,235.00 | $38,283,240.00 | $2,446,995.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
CANADIAN | 03/2009 | 2634104 | IM-STIM(154)3R **IMY-0040-4(427)115 3R |
IS040 | RESURFACE | I-40 BEG @ MILE MARKER 115 & EXTEND EAST APPROX 4.2 MILE(EAST & WESTBOUND LANES) | 4.2 | $1,147,737.00 | 0C240 | $1,082,770.00 | $0.00 | $0.00 | $0.00 |
0LZ20 | $0.00 | $64,967.00 | $0.00 | $0.00 | |||||||||
Project Total | $1,147,737.00 | $1,082,770.00 | $64,967.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
CANADIAN | 03/2009 | 2635404 | IM-STIM(153)3R **IMY-0040-4(428)108 3R |
IS040 | RESURFACE | I-40 BEG @ MILE MARKER 108 & EXTEND EAST TO MILE MARKER 115. | 7 | $2,217,948.00 | 0LZ20 | $0.00 | $125,545.00 | $0.00 | $0.00 |
0C240 | $2,092,403.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $2,217,948.00 | $2,092,403.00 | $125,545.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
CARTER | 03/2009 | 0924714 | STP-STIM(038) | US070 | BRIDGE & APPROACHES | US-70: OVER RED OAK CR. APPROX. 1.8 MI. E. OF THE JEFFERSON C/L.(RDY= 09247(15) | 0.25 | $1,780,302.00 | 0LZ20 | $0.00 | $100,772.00 | $0.00 | $0.00 |
0C240 | $1,679,530.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $1,780,302.00 | $1,679,530.00 | $100,772.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
CARTER | 03/2009 | 0924715 | STP-STIM(040) | US070 | GRADE, DRAIN & SURFACE | US-70 BEG @ JEFFERSON C/L & EXTENDING EAST 3.08 MILEBR=09247(14) | 3.08 | $8,198,193.00 | 0C240 | $7,679,427.00 | $0.00 | $0.00 | $0.00 |
0LZ20 | $0.00 | $518,766.00 | $0.00 | $0.00 | |||||||||
Project Total | $8,198,193.00 | $7,679,427.00 | $518,766.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
COMANCHE | 03/2009 | 1043907 | STP-STIM(037) | SH007 | BRIDGE & APPROACHES | SH-7: OVER BEAVER CR, 2.4 MI WEST OF THE COMANCHE/STEPHENS C/L(1.6 MI EAST OF SH 65) | 0.381 | $2,571,146.00 | 0LZ20 | $0.00 | $176,669.00 | $0.00 | $0.00 |
0C240 | $2,394,477.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $2,571,146.00 | $2,394,477.00 | $176,669.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
ELLIS | 03/2009 | 2094307 | STP-STIM(034) | US283 | BRIDGE & APPROACHES | US-283: OVER TWENTYFIVE MILE CREEK, 0.5 MILES NORTH OF JCT SH-15 | 0.75 | $4,688,067.00 | 0C240 | $4,384,969.00 | $0.00 | $0.00 | $0.00 |
0LZ20 | $0.00 | $303,098.00 | $0.00 | $0.00 | |||||||||
Project Total | $4,688,067.00 | $4,384,969.00 | $303,098.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
GARVIN | 03/2009 | 2097006 | IM-STIM(010) | IS035 | PAVEMENT REHABILITATION | I-35: FROM SH-29, NORTH 6.57 MI TO SH-19(MP 66.19 TO MP 72.76) | 6.57 | $25,335,200.00 | 0LZ10 | $0.00 | $1,514,257.00 | $0.00 | $0.00 |
0C240 | $23,820,943.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $25,335,200.00 | $23,820,943.00 | $1,514,257.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
GARVIN | 03/2009 | 2629404 | STP-STIM(156)3R **STPY-125C(172)3R |
SH076 | RESURFACE | SH-76 BEG @ THE CARTER C/L & EXT NORTH APPROX 8.0 MILE TO SH-29. | 8.01 | $1,343,182.00 | 0LZ20 | $0.00 | $76,030.00 | $0.00 | $0.00 |
0C240 | $1,267,152.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $1,343,182.00 | $1,267,152.00 | $76,030.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
HASKELL | 03/2009 | 2635204 | STP-STIM(157)3R **STPY-131B(097)3R |
SH009 | PAVEMENT REHABILITATION | SH-9 BEG APPROX 11.3 MILE EAST OF SH-2 & EXTEND EAST APPROX 1.1 MILE. | 1.07 | $294,214.00 | 0LZ20 | $0.00 | $16,654.00 | $0.00 | $0.00 |
0C240 | $277,560.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $294,214.00 | $277,560.00 | $16,654.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
HUGHES | 03/2009 | 2492804 | STP-STIM(172)3R **STPY-132B(113)3R |
US270B | PAVEMENT REHABILITATION | US-270B BEG AT SH-48 & EXT EAST 1.96 MILE TO US-270. | 1.96 | $304,915.00 | 0C240 | $287,655.00 | $0.00 | $0.00 | $0.00 |
0LZ20 | $0.00 | $17,260.00 | $0.00 | $0.00 | |||||||||
Project Total | $304,915.00 | $287,655.00 | $17,260.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
JACKSON | 03/2009 | 2636704 | NH-STIM(071)3R | US062 | RESURFACE | US-62: BEGIN 2.37 MILES EAST OF THE US-283 JCT AND EXTEND EAST 7.7 MILES.(WEST BOUND LANES ONLY) | 7.7 | $1,567,437.00 | 0C240 | $1,478,714.00 | $0.00 | $0.00 | $0.00 |
0LZ20 | $0.00 | $88,723.00 | $0.00 | $0.00 | |||||||||
Project Total | $1,567,437.00 | $1,478,714.00 | $88,723.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
KAY | 03/2009 | 2443207 | IM-STIM(019) | IS035 | RECONSTRUCT-NO ADDED LANES | I-35 BEGINNING AT MILEPOST 224.43 & EXTENDING NORTH TO MILEPOST 229.33 | 4.9 | $32,489,596.00 | 0LZ10 | $0.00 | $2,185,732.00 | $0.00 | $0.00 |
0C240 | $30,303,864.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $32,489,596.00 | $30,303,864.00 | $2,185,732.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
LINCOLN | 03/2009 | 2492904 | STP-STIM(174)3R **STPY-141C(187)3R |
SH018 | RESURFACE | SH-18 BEG @ SH-105 & EXT NORTH APPROX 5.0 MILE TO PAYNE C/L | 5.05 | $585,211.00 | 0LZ10 | $0.00 | $33,126.00 | $0.00 | $0.00 |
0C240 | $552,085.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $585,211.00 | $552,085.00 | $33,126.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
LINCOLN | 03/2009 | 2629304 | STP-STIM(173)3R **STPY-141C(203)3R |
SH105 | RESURFACE | SH-105 BEG @ US-177 & EXT EAST APPROX 8.0 MILE T0 SH-18. | 7.97 | $1,332,506.00 | 0LZ10 | $0.00 | $75,425.00 | $0.00 | $0.00 |
0C240 | $1,257,081.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $1,332,506.00 | $1,257,081.00 | $75,425.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
MCCLAIN | 03/2009 | 2195005 | IM-STIM(013) | IS044 | RECONSTRUCT-NO ADDED LANES | I-44: FROM US-62 (END OF HE BAILEY TP), NORTH 7.5 MI(MP 106.92 TO MP 114.42) | 7.5 | $11,494,541.00 | 0LZ10 | $0.00 | $797,033.00 | $0.00 | $0.00 |
0C240 | $10,697,508.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $11,494,541.00 | $10,697,508.00 | $797,033.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
MAYES | 03/2009 | 2628304 | NH-STIM(175)3R **NHY-013N(126)3R |
US069 | RESURFACE | US-69 BEG APPROX 4.5 MILE SOUTH OF THE CRAIG C/L & EXT NORTH TO COUNTY LINE | 4.5 | $2,838,217.00 | 0C240 | $2,677,563.00 | $0.00 | $0.00 | $0.00 |
0LZ20 | $0.00 | $160,654.00 | $0.00 | $0.00 | |||||||||
Project Total | $2,838,217.00 | $2,677,563.00 | $160,654.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
MURRAY | 03/2009 | 2640204 | IM-STIM(120)3R | IS035 | RESURFACE | I-35: BEGINNING AT THE CARTER C/L EXTEND N. 6.56 MILES | 6.56 | $6,118,650.00 | 0C240 | $5,772,311.00 | $0.00 | $0.00 | $0.00 |
0LZ10 | $0.00 | $346,339.00 | $0.00 | $0.00 | |||||||||
Project Total | $6,118,650.00 | $5,772,311.00 | $346,339.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
MUSKOGEE | 03/2009 | 2090005 | IM-STIM(001) | IS040 | GRADE,DRAINING,BRIDGE & SURFACE | I-40: FR MILE POST 281.67 TO 288.22 | 6.55 | $35,784,704.00 | 0C240 | $33,617,645.00 | $0.00 | $0.00 | $0.00 |
0LZ20 | $0.00 | $2,167,059.00 | $0.00 | $0.00 | |||||||||
Project Total | $35,784,704.00 | $33,617,645.00 | $2,167,059.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
MUSKOGEE | 03/2009 | 2635104 | STP-STIM(158)3R **STPY-151B(205)3R |
SH002 | PAVEMENT REHABILITATION | SH-2 BEG APPROX 14.3 MILE NORTH OF HASKELL C/L & EXT NORTH APPROX 1.75 MILE | 1.75 | $677,508.00 | 0C240 | $639,158.00 | $0.00 | $0.00 | $0.00 |
0LZ20 | $0.00 | $38,350.00 | $0.00 | $0.00 | |||||||||
Project Total | $677,508.00 | $639,158.00 | $38,350.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
NOBLE | 03/2009 | 2628004 | IM-STIM(176)3R **IMY-0035-4(236)179 3R |
IS035 | RESURFACE | I-35 BEG APPROX 1.2 MILE NORTH OF PAYNE C/L & EXT NORTH APPROX 6.0 MILE(NORTH & SOUTH BOUND LANES) | 6 | $1,404,122.00 | 0LZ20 | $0.00 | $79,479.00 | $0.00 | $0.00 |
0C240 | $1,324,643.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $1,404,122.00 | $1,324,643.00 | $79,479.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
NOWATA | 03/2009 | 2440705 | NH-STIM(062) | US169 | PAVEMENT REHABILITATION | US-169 BEGIN APPROX 6.0 MILE SOUTH OF THE KANSAS S/L & EXT NORTH 6.0 MILETO THE KANSAS S/L. | 6 | $5,205,739.00 | 0LZ20 | $0.00 | $360,717.00 | $0.00 | $0.00 |
0C240 | $4,845,022.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $5,205,739.00 | $4,845,022.00 | $360,717.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
OKLAHOMA | 03/2009 | 2628104 | IM-STIM(177)3R **IMY-0235-3(104)0003R |
IS235 | PAVEMENT REHABILITATION | I-235 BEG @ NORTH END OF OKLA RIVER BR & EXT NORTH APPROX 3.5 MILE TO NEWCONCRETE @ 36TH ST. (NORTH & SOUTH BOUND LANES) | 3.47 | $2,992,147.00 | 0LZ10 | $0.00 | $169,367.00 | $0.00 | $0.00 |
0C240 | $2,822,780.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $2,992,147.00 | $2,822,780.00 | $169,367.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
OKMULGEE | 03/2009 | 2635004 | NH-STIM(159)3R **NHY-014N(081)3R |
US075 | PAVEMENT REHABILITATION | US-75 BEG @ I-40 & EXTEND NORTH APPROX 2.44 MILES | 2.44 | $995,128.00 | 0LZ20 | $0.00 | $56,328.00 | $0.00 | $0.00 |
0C240 | $938,800.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $995,128.00 | $938,800.00 | $56,328.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
PITTSBURG | 03/2009 | 2629604 | NH-STIM(178)3R **NHY-013N(128)3R |
US069 | PAVEMENT REHABILITATION | US-69 BEG @ ATOKA C/L & EXT NORTH APPROX 3.0 MILE. NORTH BOUND | 3 | $2,346,888.00 | 0LZ20 | $0.00 | $132,843.00 | $0.00 | $0.00 |
0C240 | $2,214,045.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $2,346,888.00 | $2,214,045.00 | $132,843.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
PITTSBURG | 03/2009 | 2629605 | NH-STIM(179)3R **NHY-013N(129)3R |
US069 | PAVEMENT REHABILITATION | US-69 BEG APPROX 0.3 MI N OF ATOKA C/L & EXT N APPROX 4.65 MI(SOUTHBND LNS)US-69 BEG APPROX 3.08 MI N OF ATOKA C/L, EXT N APPROX 1.05 MI(NORTHBND LNS) | 4.65 | $3,628,433.00 | 0C240 | $3,423,050.00 | $0.00 | $0.00 | $0.00 |
0LZ20 | $0.00 | $205,383.00 | $0.00 | $0.00 | |||||||||
Project Total | $3,628,433.00 | $3,423,050.00 | $205,383.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
POTTAWATOMIE | 03/2009 | 2638404 | IM-STIM(095)3R | IS040 | RESURFACE | I-40: FROM SH-18 EXTEND EAST 7.72 MI. TO SEMINOLE C/L | 7.72 | $1,734,392.00 | 0LZ20 | $0.00 | $98,173.00 | $0.00 | $0.00 |
0C240 | $1,636,219.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $1,734,392.00 | $1,636,219.00 | $98,173.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
ROGERS | 03/2009 | 2628404 | STP-STIM(180)3R **STPY-166C(233)3R |
SH266 | RESURFACE | SH-266 BEG @ SH-167 & EXT EAST APPROX 6.0 MILE. | 6 | $1,606,502.00 | 0C240 | $1,515,568.00 | $0.00 | $0.00 | $0.00 |
0LZ10 | $0.00 | $90,934.00 | $0.00 | $0.00 | |||||||||
Project Total | $1,606,502.00 | $1,515,568.00 | $90,934.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
ROGERS | 03/2009 | 2637004 | NH-STIM(088)3R | US412 | RESURFACE | US-412 BEGIN MCCLELAN KERR NAVIGATION CHANNEL, EXTEND EAST APPOX. 5 MILESTO THE END OF ASHALT PAVING | 5.02 | $2,156,748.00 | 0C240 | $2,034,668.00 | $0.00 | $0.00 | $0.00 |
0LZ10 | $0.00 | $122,080.00 | $0.00 | $0.00 | |||||||||
Project Total | $2,156,748.00 | $2,034,668.00 | $122,080.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
SEMINOLE | 03/2009 | 2493104 | STP-STIM(181)3R **STPY-167C(147)3R |
SH056 | RESURFACE | SH-56 BEG APPROX. 5.1 MILE EAST OF SH-99 & EXTEND EAST APPROX 4.8 MILE | 4.76 | $986,378.00 | 0LZ20 | $0.00 | $55,833.00 | $0.00 | $0.00 |
0C240 | $930,545.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $986,378.00 | $930,545.00 | $55,833.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
SEMINOLE | 03/2009 | 2638504 | IM-STIM(096)3R | IS040 | RESURFACE | I-40: FROM POTTAWATOMIE C/L EXTEND EAST 6.46 MI. | 6.46 | $1,455,554.00 | 0LZ20 | $0.00 | $82,390.00 | $0.00 | $0.00 |
0C240 | $1,373,164.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $1,455,554.00 | $1,373,164.00 | $82,390.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
STEPHENS | 03/2009 | 2031618 | NH-STIM(039) | SH000 | INTERCHANGE | US-81: INTERCHANGE @ BOIS D'ARC AVE. | 0.44 | $8,134,728.00 | 0C240 | $7,579,932.00 | $0.00 | $0.00 | $0.00 |
0LZ20 | $0.00 | $554,796.00 | $0.00 | $0.00 | |||||||||
Project Total | $8,134,728.00 | $7,579,932.00 | $554,796.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
TEXAS | 03/2009 | 2624006 | NH-STIM(028) | SH003 | RESURFACE | US-412: FROM 0.12 MI EAST OF US-54, EAST 7.3 MI | 7.3 | $10,768,389.00 | 0LZ20 | $0.00 | $609,532.00 | $0.00 | $0.00 |
0C240 | $10,158,857.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $10,768,389.00 | $10,158,857.00 | $609,532.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
TEXAS | 03/2009 | 2636107 | NH-STIM(033) | US064 | PAVEMENT REHABILITATION | US 64: FROM THE TX CO LN, EXTEND EAST 4.5 MILES | 4.5 | $5,813,714.00 | 0C240 | $5,484,636.00 | $0.00 | $0.00 | $0.00 |
0LZ20 | $0.00 | $329,078.00 | $0.00 | $0.00 | |||||||||
Project Total | $5,813,714.00 | $5,484,636.00 | $329,078.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
TEXAS | 03/2009 | 2636404 | NH-STIM(065)3R | US054 | RESURFACE | US-54: BEGIN APPROX 9.8 MILES NE OF THE TX ST LN, EXTEND NE 1.6 MILES (GOODWELL CITY LIMITS) | 1.6 | $1,241,015.00 | 0LZ20 | $0.00 | $70,247.00 | $0.00 | $0.00 |
0C240 | $1,170,768.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $1,241,015.00 | $1,170,768.00 | $70,247.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
TEXAS | 03/2009 | 2636405 | NH-STIM(066)3R | US054 | RESURFACE | US-54: BEGIN APPROX 11.4 MILES NE OF THE TX ST LN, EXTEND NE 7.0 MILES (SOUTHBOUND LANES ONLY) | 7 | $2,184,626.00 | 0C240 | $2,060,967.00 | $0.00 | $0.00 | $0.00 |
0LZ20 | $0.00 | $123,659.00 | $0.00 | $0.00 | |||||||||
Project Total | $2,184,626.00 | $2,060,967.00 | $123,659.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
TILLMAN | 03/2009 | 2604005 | STP-STIM(182)3R **STPY-171B(131)3R |
US183 | RESURFACE | US-183/US-70 BEG APPROX 8.0 MILE NORTH OF TEXAS S/L & EXT NORTH APPROX4.0 MILE TO SOUTH EDGE OF FREDERICK. | 4.05 | $920,960.00 | 0C240 | $868,830.00 | $0.00 | $0.00 | $0.00 |
0LZ10 | $0.00 | $52,130.00 | $0.00 | $0.00 | |||||||||
Project Total | $920,960.00 | $868,830.00 | $52,130.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
TILLMAN | 03/2009 | 2638204 | NH-STIM(086)3R | US062 | RESURFACE | US-62: BEGIN AT THE TILLMAN/JACKSON COUNTY LINE AND EXTEND EAST 3.92 MILES.(WEST BOUND LANES ONLY) | 3.92 | $1,280,822.00 | 0LZ20 | $0.00 | $72,500.00 | $0.00 | $0.00 |
0C240 | $1,208,322.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $1,280,822.00 | $1,208,322.00 | $72,500.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
TILLMAN | 03/2009 | 2638205 | NH-STIM(087)3R | US062 | RESURFACE | US-62: BEGIN 3.92 MILES EAST OF THE TILLMAN/JACKSON COUNTY LINE AND EXTENDEAST 6.0 MILES. (WEST BOUND LANES ONLY) | 6 | $2,359,259.00 | 0LZ20 | $0.00 | $133,543.00 | $0.00 | $0.00 |
0C240 | $2,225,716.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $2,359,259.00 | $2,225,716.00 | $133,543.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
TULSA | 03/2009 | 2316607 | STP-STIM(061) | SH151 | BRIDGE & APPROACHES | SH-151 OVER SH-51 & OVER SL&SF RR APPROX 1.5 MI EAST OF THE CREEK C/L | 0.25 | $7,105,061.00 | 0LZ20 | $0.00 | $490,853.00 | $0.00 | $0.00 |
0C240 | $6,614,208.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $7,105,061.00 | $6,614,208.00 | $490,853.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
TULSA | 03/2009 | 2434905 | IM-STIM(049) | IS244 | RECONSTRUCT-NO ADDED LANES | I-244 FROM US-64 INTERCHANGE EAST TO THE US-75 INTERCHANGE IN TULSA(E.B. LANES OF THE NORTH LEG OF THE IDL) | 0.63 | $17,308,619.00 | 0C240 | $16,093,064.00 | $0.00 | $0.00 | $0.00 |
0LZ10 | $0.00 | $1,215,555.00 | $0.00 | $0.00 | |||||||||
Project Total | $17,308,619.00 | $16,093,064.00 | $1,215,555.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
TULSA | 03/2009 | 2434906 | IM-STIM(050) | IS244 | RECONSTRUCT-NO ADDED LANES | I-244 FROM US-64 INTERCHANGE EAST TO THE US-75 INTERCHANGE IN TULSA(W.B. LANES OF THE NORTH LEG OF THE IDL) | 0.63 | $17,229,719.00 | 0C240 | $16,002,213.00 | $0.00 | $0.00 | $0.00 |
0LZ10 | $0.00 | $1,227,506.00 | $0.00 | $0.00 | |||||||||
Project Total | $17,229,719.00 | $16,002,213.00 | $1,227,506.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
TULSA | 03/2009 | 2636204 | IM-STIM(047) | IS244 | RECONSTRUCT-NO ADDED LANES | I-244 FROM US-75 INTERCHANGE NORTH TO THE US-64 INTERCHANGE IN TULSA(N.B. LANES OF THE WEST LEG OF THE IDL) | 1 | $11,777,839.00 | 0C200 | $10,933,965.00 | $0.00 | $0.00 | $0.00 |
0LZ10 | $0.00 | $843,874.00 | $0.00 | $0.00 | |||||||||
Project Total | $11,777,839.00 | $10,933,965.00 | $843,874.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
TULSA | 03/2009 | 2636205 | IM-STIM(048) | IS244 | RECONSTRUCT-NO ADDED LANES | I-244 FROM US-75 INTERCHANGE NORTH TO THE US-64 INTERCHANGE IN TULSA(S.B. LANES OF THE WEST LEG OF THE IDL) | 1 | $15,535,132.00 | 0LZ10 | $0.00 | $1,057,317.00 | $0.00 | $0.00 |
0C240 | $14,477,815.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $15,535,132.00 | $14,477,815.00 | $1,057,317.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
WAGONER | 03/2009 | 2634904 | NH-STIM(163)3R **NHY-013N(136)3R |
US069 | PAVEMENT REHABILITATION | US-69 BEG 0.5 MI NORTH OF SH-51 & EXT NORTH 7.84 MILE TO THE MAYES C/L | 7.84 | $2,148,112.00 | 0C240 | $2,026,520.00 | $0.00 | $0.00 | $0.00 |
0LZ20 | $0.00 | $121,592.00 | $0.00 | $0.00 | |||||||||
Project Total | $2,148,112.00 | $2,026,520.00 | $121,592.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
WAGONER | 03/2009 | 2634905 | NH-STIM(164)3R **NHY-013N(137)3R |
US069 | PAVEMENT REHABILITATION | US-69 BEG 0.25 MI SOUTH OF SH-51 & EXT NORTH 0.75 MILES | 0.75 | $445,224.00 | 0LZ20 | $0.00 | $27,174.00 | $0.00 | $0.00 |
0C240 | $418,050.00 | $0.00 | $0.00 | $0.00 | |||||||||
Project Total | $445,224.00 | $418,050.00 | $27,174.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
WOODS | 03/2009 | 2636304 | STP-STIM(063)3R | US281 | RESURFACE | US-281: BEGIN 4.5 MILES NORTH OF THE WOODS/MAJOR COUTY LINE AND EXTENDSOUTH 3.7 MILES. | 3.7 | $1,202,574.00 | 0C240 | $1,134,504.00 | $0.00 | $0.00 | $0.00 |
0LZ10 | $0.00 | $68,070.00 | $0.00 | $0.00 | |||||||||
Project Total | $1,202,574.00 | $1,134,504.00 | $68,070.00 | $0.00 | $0.00 | ||||||||
|
|||||||||||||
WOODS | 03/2009 | 2636504 | STP-STIM(067)3R | SH045 | RESURFACE | SH-45: BEGIN 4.6 MILES EAST OF THE US-281 JCT., EXTEND EAST 3.5 MILES | 3.5 | $1,199,077.00 | 0C240 | $1,146,387.00 | $0.00 | $0.00 | $0.00 |
0LZ10 | $0.00 | $52,690.00 | $0.00 | $0.00 | |||||||||
Project Total | $1,199,077.00 | $1,146,387.00 | $52,690.00 | $0.00 | $0.00 | ||||||||
|