HOMETransportation Programs


All Active Projects

Information source is the ODOT Construction Division Graybook system - Fri 3/27/2009 7:20:07 PM
Project data is dynamic and changes frequently as the construction activity moves forward. Information is subject to change without notice.
Stimulus Indicator Values:     S-State Highway System     L-County System     A-ACOG     I-INCOG     T-Transit     M-Miscellaneous     N-Non Stimulus



County Highway
Number
Contract
ID
Job
Piece
Project Stimulus
Indicator
Prime
Contractor
Job
Description
Original
Contract
Amount
Amount
Paid
Let
Date
Award
Date
Contract
Date
Work
Order
Date
Work
Order
Effective
Date
Estimated
Completion
Date

Adair CORD 080052 2125604 BRO-101D(062)CO N DTEC SERVICES, LLC 0.1310 MI. CO.RD.;BRIDGE & APPROACHES;OVER GANN HOLLOW CR.,APPROX. 2.1 MI. SO. & 2.3 MI. E. OF BUNCH. $235,846.94 $230,936.29 01/17/2008 02/04/2008 02/21/2008 03/03/2008 06/02/2008 08/30/2008

Adair CORD 080357 1260704 CIRB-001D(133)RB N PARADIGM CONSTRUCTION & ENGINEERING, INC 0.321 MI. CO.RD.; GRADE, DRAIN,SURFACE & BRIDGE/0.25 MILES EAST OF WATTS. $968,827.40 $0.00 01/22/2009 02/02/2009 02/18/2009 02/27/2009 05/04/2009 10/30/2009

Adair SH-51 090047 2597804 STPY-101C(085)(086)3R N GLOVER & ASSOCIATES, INC. 11.71 MI. SH-51;RESURFACE (ASPHALT)BEGIN @ THE CHEROKEE COUNTY LINE, EXTEND E./US- 59,BEGIN 0.3 MI. S. OF SH-51. $2,049,914.25 $0.00 01/22/2009 02/02/2009 02/18/2009 02/25/2009 08/31/2009

Adair US-59 070398 1663104 BRFY-101A(010)BF/SAB-21C* N M.J. LEE CONSTRUCTION COMPANY (212)BF/STPY-101A(12) 1.768 MI BR & APPRS/GRD, DRN & SURF US-59 ILLINOIS RVR N OF WATTS SBONLY/SH-127 DROWNING CRK N JAY $11,498,920.25 $7,204,744.16 09/20/2007 10/08/2007 10/22/2007 10/30/2007 04/07/2008 07/30/2009

Adair US-59 090040 2624404 HSIPY-151B(194)TR N MIDSTATE TRAFFIC CONTROL, INC. 0.00 MI. US-59/SH-150/SH-2/ US-64; AT VARIOUS LOCATIONS INDIVISION 1 $88,148.80 $0.00 02/19/2009 03/02/2009 03/12/2009 03/13/2009 05/04/2009 06/02/2009

Adair US-62 070396 0808904 SAB-001B(153)BF N SHERWOOD CONSTRUCTION CO., INC. 0.558 MI. BRIDGE & APPROACHES US-62 OVER TYNER CRK. APPROX. 1.6 MI. E. OF ADAIR / CHEROKEE COUNTY LINE. $3,400,098.10 $3,189,832.84 09/20/2007 10/08/2007 10/22/2007 10/25/2007 01/07/2008 08/04/2008

Alfalfa CORD 080068 2070504 BRF-102C(065)CO N REECE CONSTRUCTION CO., INC. 0.132 MI. GRADE, DRAIN, SURF. & BR. CO. RD. UNNAMED CRK. TRIB. TO WAGON CRK. 2.2 MI. N. SH-45 & 1.0 MI. W. GOLTRY. $335,544.35 $351,385.71 02/21/2008 03/03/2008 03/17/2008 05/01/2008 06/02/2008 09/29/2008

Alfalfa SH-45 080293 2480804 SBR-102B(125)SB N LOGOS CONSTRUCTION COMPANY 0.00 MI. BRIDGE REHABILITATION SH-45 BRIDGE OVER EAGLE CHIEF CREEK 1.2 MI. EAST OF WOODS COUNTY LINE. $894,812.00 $855,825.40 07/24/2008 08/12/2008 08/27/2008 08/29/2008 12/01/2008 02/28/2009

Atoka CORD 080336 2166004 BRO-103D(067)CO N HUB CONSTRUCTION, INC. 0.143 MI. CO.RD./BRIDGE & APPROACHES; OVER BUCK CREEK, 1.5 MI. W. OF DAISY. $503,973.25 $337,416.87 08/21/2008 09/19/2008 09/30/2008 10/02/2008 01/05/2009 04/14/2009

Atoka SH-3 070378 2314104 NHY-017N(187) N KOSS CONSTRUCTION COMPANY & SUBSIDIARY 2.609 MI. SH-3;GRADE,DRAIN, BRIDGE & SURFACE;BEGIN APPROX.4.5 MI. E. OF ATOKA, EXTEND EAST. $5,943,840.68 $3,043,001.03 09/20/2007 10/08/2007 10/18/2007 12/04/2007 02/04/2008 02/02/2009

Atoka SH-3 080410 1020904 BRFY-017N(018) N M.J. LEE CONSTRUCTION COMPANY 1.174 MIL. SH-4;BRIDGE & APPROACHES;OVER MUDDY BOGGY CR., WEST OF FARRIS. $5,688,617.88 $1,068,379.26 10/16/2008 11/03/2008 11/13/2008 11/19/2008 03/02/2009 12/26/2009

Atoka SH-3 080428 2030610 NHY-017N(216)RW N ARK WRECKING OF OK., INC. 0.00 MI. RIGHT-OF-WAY CLEARANCE SH-3 FROM PUSHMATAHA COUNTY LINE EXTEND WEST. $78,600.00 $58,950.00 09/18/2008 10/06/2008 10/28/2008 10/31/2008 11/24/2008 03/23/2009

Atoka SH-7 070015 2172704 SAB-103C(068)BF N MUSKOGEE BRIDGE COMPANY, INC. 1.307 MI. BRIDGE & APPROACHES OVER CLEAR BOGGY & O'FLOWS & DRY BOGGY CRKS. APPROX. 5.2 MI. E. OF JOHNSON C/L. $6,041,360.43 $6,044,335.42 12/19/2006 01/08/2007 01/29/2007 02/07/2007 05/07/2007 06/09/2008

Atoka US-69 090001 2607504 NHY-013N(121)3R N DUIT CONSTRUCTION COMPANY, INC. 4.92 MI. US-69;RESURFACE (CONCRETE);BEGIN 0.4 MI. NORTHOF BRYAN COUNTY LINE, EX- TEND NORTH. $1,824,405.00 $33,090.40 01/22/2009 02/02/2009 02/10/2009 02/12/2009 05/30/2009 05/31/2009

Beaver CO.RD. 090045 2204204 BRO-104D(041)CO N K & R BUILDERS, INC. 0.226 MI. CO.RD./ BRIDGE & APPROACHES;OVER NO. FORK OF CLEAR CR., 4.0 MI. W. & 2.8 MI. N. OF THE US-412/SH-23 $518,799.90 $0.00 02/19/2009 03/02/2009 03/10/2009 03/12/2009 06/01/2009 10/28/2009

Beaver CORD 080133 2204004 BRO-104D(039)CO N K & R BUILDERS, INC. 0.1880 MI. CO.RD./BRIDGE & APPROACHES;OVER BULL CR.,4.0 MI. NO. & 3.9 MI.WEST OF THE US-412/US-83 JUNCTION. $431,162.41 $398,407.81 03/20/2008 04/07/2008 04/16/2008 04/25/2008 08/04/2008 12/01/2008

Beckham CTST 080153 2132004 STP-105B(083)UR N TOM HUDSON PAVING, INC. 0.6500 MI. CT.ST.;GRADE, DRAIN,SURFACE, FROM OILFIELD DR. TO RANDALL AVE. IN ELK CITY. $2,135,825.67 $1,813,299.29 03/20/2008 04/07/2008 04/16/2008 04/25/2008 08/04/2008 02/19/2009

Beckham I-40 070106 2378304 STPY-105E(138)EH N DUIT CONSTRUCTION COMPANY, INC. 1.01 MI. CONSTRUCT TOURIST INFORMATION CENTER & LANDSCAPE I-40 10 MI. E. OF THE TEXAS/OKLAHOMA STATE LINE EASTBOUND. $6,144,201.17 $6,251,020.42 03/01/2007 03/05/2007 03/09/2007 03/12/2007 04/02/2007 09/28/2007

Beckham I-40 080337 2412604 IMG-40-2(138)23TR/SSP-* N RMD HOLDINGS, LTD. DBA NATIONWIDE FENCE & SUPPLY COMPANY *105N(141)SS / 9.3 MI. SAFETY IMPROVEMENT (CABLE BARRIER) I-40 FROM M.M. 23 TO M.M. 28 & FROM M.M. 28.1 TO 32.4. $1,477,201.96 $1,299,467.03 09/18/2008 10/06/2008 10/23/2008 11/12/2008 12/01/2008 02/28/2009

Beckham IS 40 080307 2447005 SBR-105N(154)SB N LOGOS CONSTRUCTION COMPANY 0.25 MI. IS-40;BRIDGE REHA- BILITATION;OVER THE NORTH FORKOF THE RED RIVER, BEGIN AT MILEPOST 22.75 & EXTEND EAST. $373,476.00 $72,311.56 07/24/2008 08/12/2008 08/27/2008 09/02/2008 03/02/2009 04/30/2009

Beckham IS-40 080295 2578304 BPMY-NBIP(401)3B N POSEIDON CONSTRUCTION, INC. 0.00 MI. IS-40; BRIDGE PAINT -ING/ OVER LITTLE TURKEY CR., 6.1 MI. EAST OF TEXAS LINE. $110,776.00 $0.00 08/21/2008 09/19/2008 10/02/2008 12/04/2008 01/05/2009 03/15/2009

Beckham IS-40 080297 2578305 BPMY-105N(168)3B N LOGOS CONSTRUCTION COMPANY 0.00 MI. IS-40;JOINT SEAL/ REPAIR;OVER LITTLE TURKEY CR.,6.1 MI. EAST OF TEXAS LINE. $212,540.00 $0.00 08/21/2008 09/19/2008 10/07/2008 10/15/2008 03/02/2009 05/10/2009

Beckham IS-40 080459 2422105 IMY-0040-1(085)020 N K & R BUILDERS, INC. 0.00 MI. IS-40; BRIDGE RE- DECKING & REHAB.;OVER SAND CR., 12.6 MI. EAST OF SH-30. $1,030,795.40 $0.00 11/20/2008 12/08/2008 12/23/2008 01/02/2009 04/06/2009 08/18/2009

Beckham SH-6 050173 1496919 STPY-105B(010) N DOBSON BROTHERS CONSTRUCTION CO. 6.76 MI. GRADE, DRAIN & SURFACE SH-6 FROM SH-55E JCT. EXT. N. TO SADDLER CRK. $11,077,491.46 $10,555,649.44 08/17/2006 09/11/2006 09/26/2006 10/05/2006 01/08/2007 04/28/2008

Beckham SH-6 080218 2446904 SBR-105C(151)(152)SB/SBR* N PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC *-105N(153)(159)SB/0.48 MI BR REHAB SH-6 BUFFALO & STARVATION CRK E SH-152/I-40 N FORK RED RVR/I-40B RR UNDRPSS (WBOUND) $3,292,898.15 $3,034,799.14 03/20/2008 04/07/2008 04/18/2008 05/05/2008 08/04/2008 05/30/2009

Blaine CORD 080449 2255204 BRO-106D(072)CO N OBC, INC. 0.188 MI. BRIDGE & APPROACHES CO. RD. (NS-247) OVER UNNAMED CRK. 1.0 MI. W. & 5.3 MI. S. OF SH-51/SH-58 IN CANTON. $405,064.35 $120,949.34 10/16/2008 11/03/2008 11/13/2008 11/20/2008 03/02/2009 05/30/2009

Blaine US-270 090133 2624604 HSIPY-120B(172)TR N MIDSTATE TRAFFIC CONTROL, INC. 0.00 MI. US-270/SAFETY IM- PROV.(RUMBLE STRIP) SH-8/SH-54AT VARIOUS LOCATIONS IN DIV. V. $155,560.55 $0.00 02/19/2009 03/02/2009 03/12/2009 03/16/2009 05/04/2009 06/17/2009

Bryan CORD 080444 2248904 STP-107C(099)CO N OVERLAND CORPORATION 1.98 MI. CO.RD.; GRADE, DRAIN & SURFACE/ FROM US-70, EXTEND SOUTH. $1,551,228.12 $120,743.00 10/16/2008 11/03/2008 11/10/2008 11/18/2008 01/05/2009

Bryan US-69 070379 2407204 NHG-013N(115)TR N ACTION SAFETY SUPPLY CO. 0.00 MI. SAFETY IMPROVEMENT (CABLE BARRIER PROJECT) US-69 BEGIN AT RED RIVER & EXTEND NORTH TO PLATTER RD. $1,206,645.45 $1,258,282.33 09/20/2007 10/08/2007 10/22/2007 10/26/2007 02/04/2008 06/02/2008

Bryan US-69 080460 2599004 NHY-13N(120)3R N INTERSTATE HIGHWAY CONSTRUCTION, INC. 3.47 MI. US-69/ BEGIN 10.8 MI. NO. OF OKLA./TEXAS STATE LINE, EXTEND NORTH. $2,253,196.60 $0.00 11/20/2008 12/08/2008 12/23/2008 02/24/2009 04/06/2009 06/19/2009

Bryan US-70 070328 1674413 ACNHY-022N(116)GB N THE CUMMINS CONSTRUCTION CO., INC. 2.658 MI. GRADE, DRAIN, WIDEN & RESURFACE US-70 FROM 3.5 MI.W. OF MEAD & EXTEND E. $7,721,467.99 $2,861,555.62 08/16/2007 09/10/2007 09/24/2007 10/02/2007 01/07/2008 03/21/2009

Bryan US-70 080429 1884717 NHY-022N(182)RW N M & M WRECKING, INC. 0.00 MI. US-70/RIGHT-OF- WAY CLEARANCE;EAST OF SH-78, EXTEND EAST. $128,455.00 $115,609.50 09/18/2008 10/06/2008 10/21/2008 10/24/2008 11/17/2008 03/16/2009

Caddo CORD 080221 2232404 BRO-108D(137)CO N OBC, INC. 0.188 MI. BR. & APPRS. CO. RD. (EW-115) OVER TRIB. TO LAKE CRK. APPROX. 9.2 MI. W. & 2.7 MI. N. US-281/SH-152 IN BINGER $421,491.94 $388,578.47 05/15/2008 06/02/2008 06/12/2008 06/27/2008 10/06/2008 01/03/2009

Caddo I-40 080069 2025704 IMY-40-4(391)90/SSP-120N* N HASKELL LEMON CONSTRUCTION CO. *(136)SS/IMG-40-3(69)89TR / 5.529 MI RESURF & SFTY IMPRVMNT (CBL BARR) I-40 FROM MM 82.3 TO MM 96 E. OF WEATHERFORD. $9,534,185.87 $10,365,740.28 02/21/2008 03/03/2008 03/12/2008 03/27/2008 05/05/2008 11/30/2008

Caddo IS-40 080070 2025705 IMG-0040-4(392)096* N HASKELL LEMON CONSTRUCTION CO. *IMG-40-4(416)095TR/IMG-40 -4(417)098TR/ 6.39 MI. IS-40; RESURFACE & SAFETY IMPRO. (CABLE BARRIER)FROM MILE POST. $8,154,119.77 $0.00 01/22/2009 02/02/2009 02/11/2009 02/12/2009 07/06/2009 02/25/2010

Caddo SH-19 080303 2171309 BRFY-108C(140) N T & G CONSTRUCTION, INC. 2.679 MI. SH-19;GRADE,DRAIN & SURFACE;FROM 5.5 MI. EAST OF JCT US-62, EXTEND EAST. $5,629,322.71 $0.00 01/22/2009 03/02/2009 03/16/2009 03/17/2009 06/01/2009 12/27/2009

Caddo US-281 080417 2583904 SAP-108B(251) N T & G CONSTRUCTION, INC. 0.400 MI. US-281; SAFETY IMPROV.(RDWY MODIFICATION) BE-GAN 2.6 MI. N. OF US-62, EXTEND NORTH. $587,348.10 $263,431.40 09/18/2008 10/06/2008 10/21/2008 10/28/2008 02/02/2009 04/02/2009

Caddo US-62 070403 2171104 BRFY-108B(122)/IBRY-108* N OBC, INC. *(187)IB / 0.283 MI. BRIDGE & APPROACHES US-62 OVER BOXELDER CRK. APPROX. 1.45 MI. N. OF SH-19. $1,945,111.34 $1,990,395.39 10/18/2007 11/05/2007 11/27/2007 12/03/2007 05/05/2008 12/30/2008

Caddo US-62 070380 2332404 BRFY-108B(148) N WITTWER CONSTRUCTION CO., INC. 0.171 MI. BRIDGE & APPROACHES US-62 OVER HOG CRK. BEGIN BEGIN APPROX. 6.84 MI. N. OF SH-19 & EXTEND NORTH. $1,955,669.90 $1,971,689.89 09/20/2007 10/08/2007 10/22/2007 10/30/2007 02/04/2008 09/30/2008

Caddo US-62 080195 2312505 BRFY-169C(151) N GARY A. CRAIN, INC. 0.00 MI. BRIDGE WATERPROOFING (SILANE) US-62/SH-53/SH-77D/I-44 RAMP AT VARIOUS LOCATIONS IN DIVISION 7. $40,864.00 $30,725.88 04/17/2008 04/25/2008 05/12/2008 05/16/2008 09/08/2008 11/21/2008

Caddo US-62 090021 2614304 MC-108B(256) N T & G CONSTRUCTION, INC. 3.020 MI.US-62; RESURFACE (ASPHALT) BEGIN 3.32 MI. E. OFUS-62/SH-9, EXT EAST. $504,769.50 $0.00 01/22/2009 02/02/2009 02/20/2009 02/26/2009 06/30/2009

Canadian CO.RD. 080430 2183804 CIRB-109C(096)RB N K & R BUILDERS, INC. 0.378 MI.;CO.RD./BRIDGE & APPROACHES; OVER N. CANADIAN RIVER, 5.0 MI. N. & 2.0 MI. EAST OF GEARY. $1,105,390.97 $548,191.01 09/18/2008 10/06/2008 10/23/2008 10/29/2008 01/05/2009 05/04/2009

Canadian CO.RD. 090046 2156604 BRO-109D(089)CO N D. M. DOZERS, INC. 0.254 MI. CO.RD./GRADE,DRAIN, SURFACE & BRIDGE;OVER UNNAMED CREEK, 2.5 MI. SO. & 5.7 MI. WEST OF THE I-40/US-81 JCT. $423,263.20 $0.00 02/19/2009 03/02/2009

Canadian CORD 080269 2156504 BRO-109D(088)CO N D. M. DOZERS, INC. 0.302 MI. BRIDGE & APPROACHES COUNTY RD. (NS-269) OVER BOGGY CRK. APPROX. 4.1 MI. N & 4.0 MI. W. OF JCT. SH-37/SH-152. $484,877.72 $508,740.16 06/19/2008 07/14/2008 08/05/2008 08/07/2008 10/06/2008 01/03/2009

Canadian I-40 080217 2413604 IMG-0040-4(418)101TR N ACTION SAFETY SUPPLY CO. 0.00 MI.I-40/SAFETY IMPROV- MENT (CABLE BARRIER);FROM MILEPOST 101, EXTEND EAST TO MILEPOST 106. $598,546.80 $589,381.71 04/17/2008 04/25/2008 05/05/2008 05/09/2008 07/07/2008

Canadian SH-4 070292 2321504 SAB-109B(117)BF N PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC 0.094 MI. GRADING, DRAINAGE, SURFACING & BRIDGE SH-4 OVER UNNAMED CRK. 0.8 MI. N. OF SH-66. $652,992.18 $645,427.07 08/16/2007 09/10/2007 09/24/2007 10/12/2007 01/07/2008 04/15/2008

Canadian SH-4 080125 2543504 SSR-109C(143)SR N MARKWELL PAVING COMPANY 6.61 MI. RESURFACE (MILL & OVERLAY) SH-4 FROM SH-66 N. TO SH-3. $693,008.80 $825,488.03 02/21/2008 03/03/2008 03/17/2008 03/25/2008 06/30/2008 08/28/2008

Canadian SH-4 080418 2085104 STPY-109B(077) N DUIT CONSTRUCTION COMPANY, INC. 2.946 MI. GRADE, DRAIN, SURFACING & SIGNAL PLANS SH-4 FROM I-40 NORTH TO SH-66. $12,938,624.44 $1,448,385.07 09/18/2008 10/06/2008 10/21/2008 12/08/2008 03/02/2009 09/17/2010

Canadian SH-4 090041 2603004 STPY-109C(151)3R N ATLAS PAVING CO., INC. 3.330 MI. SH-4;RESURFACE (ASPHALT)BEGIN AT SH-3 & EXTEND NORTH. $913,119.00 $0.00 01/22/2009 02/02/2009 02/10/2009 02/12/2009 07/30/2009 07/31/2009

Canadian SH-66 070091 1511004 BRFY-009B(316) N PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC 0.368 MI. GRADE, DRAIN, SURFACE & BRIDGE SH-66 OVER SIX MILE CRK. 1.2 MI. E. OF THE JUNCTION OF US-81. $2,146,073.72 $2,888,697.71 03/15/2007 04/02/2007 04/04/2007 04/12/2007 08/06/2007 02/11/2008

Canadian SH-66 070017 2321404 SAB-109C(118)BF* N OBC, INC. *MC-109C(126)/ 0.232 MI. GRADE, DRAIN, SURFACE & BRIDGE SH-66 BEGIN APPROX. 0.53 MI. W. OF BANNER RD. & EXTEND E. $2,925,761.68 $2,882,408.43 01/18/2007 02/06/2007 02/21/2007 03/13/2007 08/07/2007 07/01/2008

Canadian US-281 090078 1825704 SEC1702Y-130N(130)HP N THE CUMMINS CONSTRUCTION CO., INC. 3.300 MI. US-281; BRADE, DRAIN & SURFACE;FROM NEW US- 281 SPUR, EXTEND NORTH. $6,715,437.15 $0.00 02/19/2009 03/02/2009 03/10/2009 03/12/2009 07/06/2009 04/01/2010

Canadian US-81 090016 0517312 NHY-011N(008) N DUIT CONSTRUCTION COMPANY, INC. 3.90 MI. US-81;GRADE, DRAIN & SURFACE; BEGIN AT THE SH-152JCT, EXTEND NORTH. $7,978,265.75 $0.00 01/22/2009 02/02/2009 02/10/2009 02/11/2009 07/06/2009 04/01/2010

Canadian US81 060373 1254412 NHY-011N (017) N THE CUMMINS CONSTRUCTION CO., INC. 3.695 MI. GRADE, DRAIN, SURFACE & BRIDGE US-81 FROM 1.32 MI. N. OF I-40B IN ELRENO & EXTEND NORTH. $5,487,403.15 $5,124,889.02 11/16/2006 12/04/2006 12/21/2006 01/08/2007 04/02/2007 11/22/2007

Carter CO.RD. 080076 2047204 BRF-110C(117)CO N BRUTON CONSTRUCTION CO., INC. 0.425 MI. CO. RD.; BRIDGE & APPROACHES/CO.RD. OVER BULL CR., 6.0 MI. W. OF I-35, & 4.0 MI. SO. OF US-70. $750,800.29 $0.00 11/20/2008 12/08/2008 12/29/2008 01/02/2009 04/06/2009 07/04/2009

Carter CORD 070144 2183504 BRO-110D(138)CO N BRIDGECO CONTRACTORS, INC. 0.146 MI. BRIDGE & APPROACHES ON CO. RD. OVER RUSSELL PRETTY BRANCH APPROX. 3.0 MI. N. & 2.8 MI. E. OF SH-53/SH-76 JCT. $332,377.06 $313,665.19 04/19/2007 05/07/2007 05/22/2007 05/30/2007 07/02/2007 09/29/2007

Carter I-35 080431 2407604 IMG-0035-1(143)036 TR* N ACTION SAFETY SUPPLY CO. *IMG-035-1(144)031 TR/ 0.00 MI. IS-35;SAFETY IMPROV.(CABLEBARRIER PROJ.)BEGIN AT MILE MARKER 31 TO MILE MARKER 41. $1,292,356.93 $0.00 09/18/2008 10/06/2008 10/21/2008 10/28/2008 12/01/2008 03/10/2009

Carter IS-35 030011 1266404 IMY-35-1(100)031 N KECK CONSTRUCTION, INC. 7.087 MI. RESURFACE (CONCRETE) I-35 FROM US-70 EXTEND NORTH. $11,873,167.58 $12,286,697.71 02/20/2003 03/03/2003 03/19/2003 04/07/2003 04/28/2003 09/30/2004

Carter IS-35 090026 2628604 SAP-110N(216) N PARADIGM CONSTRUCTION & ENGINEERING, INC 0.00 MI. IS-35; BRIDGE REPR. :OVER SH-53 9.2 MI. NORTH OF JCT SH-142. $207,424.00 $0.00 01/22/2009 02/02/2009 02/19/2009 02/27/2009 06/01/2009 06/30/2009

Carter SH-76 020444 1002404 STPY-10C(328)/* N BROCE CONSTRUCTION CO., INC. *BRFY-110C(001) 11.869 KM. GRADE, DRAIN, SURFACE & BRIDGE SH-76 BEGIN APPROX. 11.767 KM. S. OF RATLIFF CITY EXTEND N. $8,474,875.91 $7,902,902.86 09/26/2002 10/07/2002 10/16/2002 02/07/2003 03/03/2003 04/16/2004

Carter US-70 080258 0924704 STPY-010B(302) N OVERLAND CORPORATION 1.929 MI. US-70; GRADE,DRAIN & SURFACE/ BEGIN 2.1 MI. WESTOF JCT US-70/SH-76, EXT. EAST. $5,739,555.91 $0.00 11/20/2008 12/08/2008 12/18/2008 12/30/2008 04/06/2009 12/31/2009

Carter US-70 090064 2502604 STPY-110N(209)3R N SILVER STAR CONSTRUCTION COMPANY, INC. 1.00 MI. US-70;RESURFACE (ASPHALT)BEGIN 1.0 MI. EAST OFIS-35, EXT. EAST. $479,519.40 $0.00 01/22/2009 02/02/2009 02/19/2009 02/26/2009 07/31/2009

Carter US-77 080401 2322504 BRFY-110C(179) N OVERLAND CORPORATION 0.807 MI. US-77;BRIDGE & APPROACHES/OVER CADDO CR., 4.9MI. NORTH OF SH-199. $4,109,293.17 $973,166.75 09/18/2008 10/06/2008 10/20/2008 10/22/2008 02/02/2009 09/19/2009

Cherokee CO.RD. 080053 2215304 BRO-111D(083)CO N DTEC SERVICES, LLC 0.146 MI. CO.RD.;BRIDGE & APPROACHES(EW-78)OVER RATTLE- SNAKE CR. APPROX. 3.2 MI. SO. & 0.5 MI. W. OF HULBERT. $294,667.40 $284,558.32 01/17/2008 02/04/2008 02/21/2008 03/03/2008 06/02/2008 08/30/2008

Cherokee CORD 080099 1954204 CIRB-111C(046)RB N PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC 0.462 MI.CO. RD./BRIDGE & APPROACHES;OVER CANEY CR.,1.8 MI. NORTH OF BARBER. $2,804,768.24 $2,051,093.97 07/24/2008 08/12/2008 08/27/2008 09/02/2008 12/01/2008 07/08/2009

Cherokee SH-82 080046 1001004 STPY-011C(341)SS N SHERWOOD CONSTRUCTION CO., INC. 6.719 KM WIDEN & RESURFACE SH-82 BEGIN APPROX. 0.6 MI. N.W. OF SH-100 & EXTEND N.W. $9,279,334.90 $1,205,049.40 01/17/2008 04/07/2008 04/16/2008 04/25/2008 08/04/2008 09/07/2009

Cherokee SH-82 080259 2172604 BRFY-111C(070)HP N GLOVER & ASSOCIATES, INC. 0.6900 MI.SH-82;BRIDGE & APPROACHES/OVER BLACKBIRD CR.,11.2 MI. NO. OF US-62. $3,611,559.14 $1,824,769.68 06/19/2008 07/14/2008 07/24/2008 07/29/2008 11/03/2008 05/01/2009

Choctaw CO.RD. 090131 2110004 BRO-112D(053)CO N HUB CONSTRUCTION, INC. 0.160 MI. CO.RD./BRIDGE & APPROACHES;OVER UNNAMED CREEK,0.2 MI. SO. & 1.0 MI. EAST OF FT. TOWSON. $346,650.90 $0.00 02/19/2009 03/02/2009 03/12/2009 03/16/2009 06/01/2009 08/29/2009

Choctaw US-70 050710 1884904 ACBRFY-22N(68)* N MUSKOGEE BRIDGE COMPANY, INC. *ACBRFY-22N(111)GB; 3.517 MI. GRADE, DRAIN, SURFACE & BRIDGE US-70 FROM W. OF FALLON RD. EXTEND E. TO SH-147. $19,808,940.78 $15,685,768.02 08/17/2006 09/11/2006 09/26/2006 10/17/2006 11/06/2006 01/29/2008

Choctaw US-70 060012 1885104 ACNHY-22N(75)(76)GB* N M.J. LEE CONSTRUCTION COMPANY */BRFY-022N(108): 3.22 MI. GRD, DRN, SURF, & BR US-70 BEG 5.4 MI E SH-147 & EXT E IN FT TOWSON/OVER ROCK & BIRD CRKS $11,777,045.23 $11,105,102.88 01/19/2006 02/13/2006 03/02/2006 04/07/2006 04/24/2006 07/24/2007

Cimarron SH-171 070180 2172104 SAB-113C(029)BF N K & R BUILDERS, INC. 0.452 MI. GRADE, DRAIN, SURFACE & BRIDGE SH-171 OVER BEAVER RIVER APPROX. 4.5 MI. N. OF US-287. $3,991,193.90 $3,977,559.38 10/18/2007 11/05/2007 11/20/2007 11/27/2007 04/07/2008 09/23/2008

Cleveland CORD 090132 2251704 BRF-114C(151)CO N BRIDGECO CONTRACTORS, INC. 0.245 MI. CO.RD.;BRIDGE & APPROACHES;OVER TRIBUTARY OF SPRING CREEK, 1.2 MI. EAST OF NEEDMORE. $552,986.48 $0.00 02/19/2009 03/02/2009 03/16/2009 03/18/2009 06/01/2009 09/28/2009

Cleveland CT. ST. 050688 1820704 STP-114D(044)AG N PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC 0.3730 MI. BRIDGE & APPROACHES/ CT. ST.; 12TH AVE. OVER LITTLE RIVER, LOCATED BETWEEN TECUMSEH & FRANKLIN RDS. $1,275,075.61 $1,241,147.26 01/19/2006 02/13/2006 02/28/2006 03/14/2006 06/06/2006 10/01/2006

Cleveland CT. ST. 070280 2202204 STP-114B(137)AG* N MUSKOGEE BRIDGE COMPANY, INC. *BPMY-114B(144)3B/ BRIDGE REDECKING & REHABILITATION ON 12TH STREET OVER I-35 IN MOORE. $1,450,560.75 $1,347,805.75 06/14/2007 07/16/2007 07/30/2007 08/09/2007 11/05/2007 02/02/2008

Cleveland CT.ST. 070044 1706904 STP-114B(018)(046)AG N ALLEN CONTRACTING, INC. 1.519 MI. GRADE, DRAIN & RESURFACE LINDSEY FROM OAKHURST TO 24TH AVE. / 24TH AVE. FROM IMHOFF TO LINDSEY IN NORMAN. $5,759,450.81 $5,572,210.08 04/19/2007 05/07/2007 05/22/2007 05/30/2007 09/03/2007 09/26/2008

Cleveland CT.ST. 070416 2307104 STP-114B(163)AG* N TRAFFIC & LIGHTING SYSTEMS, LLC *IMY-35-2(298)112TR; 1.420 MI. TRAFFIC SIGNAL & LIGHTING INTERCONNECT TECUMSEH RD 36TH AVE NW E TO I-35 IN NORMAN. $729,109.97 $697,739.79 10/18/2007 11/05/2007 11/13/2007 11/27/2007 02/25/2008 05/24/2008

Cleveland CT.ST. 080180 2211904 STP-114B(139)AG N RUDY CONSTRUCTION CO. 0.37 MI. GRADE, DRAIN, SURFACE & TRAFFIC SIGNALS CITY STREET (36TH AVE. N.W.) BETWEEN ROBINSON ST. & MAIN ST. IN NORMAN. $2,645,494.08 $1,697,784.17 04/17/2008 04/25/2008 05/07/2008 05/19/2008 09/08/2008 02/14/2009

Cleveland CT.ST. 080433 2554804 STP-114B(218)AG N PBX CORPORATION 0.068 MI. CT.ST.; BRIDGE RE- PAIR, (ROBINSON ST.);BRIDGE OVER IS-35, IN THE CITY. $220,100.00 $89,204.83 09/18/2008 10/06/2008 10/23/2008 10/30/2008 03/02/2009 04/15/2009

Cleveland CT.ST. 090050 1539207 IMY-0035-2(292)116 N OBC, INC. 0.099 MI. CT.ST.;GRADE,DRAIN ,SURFACE & BRIDGE/CT.ST.(SO. 19TH ST.); OVER I-35, IN THE CITY OF MOORE. $1,290,397.40 $0.00 01/22/2009 02/02/2009 02/12/2009 02/18/2009 02/18/2009 10/03/2009

Cleveland CT.ST. 090051 2251804 STP-114C(152)AG N K & R BUILDERS, INC. 0.179 MI. CT.ST./BRIDGE & APPROACHES;OVER NORTH FORK OF LITLE RIVER, 2.7 MI. EAST OF IS-35 IN THE CITY OF MOORE. $523,657.44 $0.00 02/19/2009 03/02/2009 03/09/2009 03/11/2009 07/06/2009 12/02/2009

Cleveland CTST 070429 1439104 STPY-014B(378) N HASKELL LEMON CONSTRUCTION CO. 1.920 MI GRD, DRN, SURF, & BR (TRAFF SIG) CITY ST (TECUMSEH RD) BEG APPROX 0.3 MI E OF 12TH AVE NW & EXT E IN NORMAN. $7,039,963.90 $6,828,612.52 11/15/2007 12/03/2007 12/17/2007 01/02/2008 04/07/2008 04/01/2009

Cleveland CTST 080054 2208904 STP-114B(138)AG N HASKELL LEMON CONSTRUCTION CO. 0.622 MI. GRADE, DRAIN, SURFACE & SIGNALS CITY ST. ON MAIN ST. BETWEEN CARTER AVE. & 12TH AVE. N.E. IN NORMAN. $3,283,061.20 $2,330,060.65 02/21/2008 03/03/2008 03/12/2008 03/24/2008 07/07/2008 02/11/2009

Cleveland IS-35 080461 0903405 SEC1702Y-114A(191)HP N HASKELL LEMON CONSTRUCTION CO. 4.5 MI. IS-35; GRADE,DRAIN, SURFACE & BRIDGE/FROM 0.5 MI. NO. OF MAIN ST.,EXTEND NORTH. $35,304,952.60 $1,941,552.96 12/18/2008 01/05/2009 01/09/2009 01/13/2009 03/02/2009 10/22/2010

Cleveland SH-77H 090018 2599904 SSR-114C(231)(232)SR N VANCE BROTHERS, INC. 10.111 MI. SH-77H;RESURFACE (MICROSURFACE)BEGIN AT RO- BINSON ST. & EXTEND NORTH. BEGIN @ S.E. 149TH ST. $1,092,917.32 $0.00 01/22/2009 02/02/2009 02/20/2009 02/24/2009

Coal CO.RD. 080434 1930504 BRO-115D(019) CO N BRIDGECO CONTRACTORS, INC. 0.236 MI. BRIDGE & APPROACHES COUNTY ROAD (NS-371) OVER LEADER CRK. 3.6 MI. N. & 0.9 MI. E. OF TUPELO. $391,204.60 $281,528.70 09/18/2008 10/06/2008 10/21/2008 10/29/2008 02/02/2009 05/02/2009

Coal SH-31 090065 2473504 STPY-115C(071)3R N THE CUMMINS CONSTRUCTION CO., INC. 7.00 MI. SH-31; RESURFACE (ASPHALT)FROM 6.6 MI. NORTH OFSH-31, EXTEND NORTH. $1,031,099.05 $0.00 01/22/2009 02/02/2009 02/18/2009 02/24/2009 07/31/2009

Comanche CO.RD. 080358 2308904 CIRB-116D(133)RB N BRUTON CONSTRUCTION CO., INC. 0.395 MI. CO.RD.; BRIDGE & APPROACHES;OVER BEAVER CR., 1 .0 MI. EAST & 3.0 MI. NORTH OF JCT SH-65/SH-17. $1,100,793.00 $167,475.13 11/20/2008 12/08/2008 12/29/2008 12/31/2008 03/02/2009 08/08/2009

Comanche CORD 080113 2000804 BRO-116D(080)CO N SEWELL BROTHERS, INC. 0.212 MI. GRADE, DRAIN, SURFACE & BRIDGE CO. RD. (EW-163) OVER SANDY CRK. APPROX. 2.0 MI. N. & 2.4 MI. W. OF INDIAHOMA $582,929.40 $582,542.14 02/21/2008 03/03/2008 03/17/2008 03/24/2008 06/02/2008 09/29/2008

Comanche CORD 080209 2420104 STP-116C(146)CO N T & G CONSTRUCTION, INC. 2.760 MI RESURFACE (ASPHALT) COUNTY RD. (EW-165) ON CACHE RD. FROM NS-247 EXTEND EAST. $1,040,232.48 $650,768.61 08/21/2008 09/19/2008 10/02/2008 10/07/2008 12/01/2008 01/14/2009

Comanche CT.ST. 080435 2341104 STP-116B(138)MS N DUIT CONSTRUCTION COMPANY, INC. 1.027 MI. CT.ST./GRADE,DRAIN ,SURFACE,BRIDGE & SIGNALIZA- TION;FROM CACHE RD. TO ROGERS LANE, IN THE CT.OF LAWTON. $4,889,495.46 $121,797.39 09/18/2008 10/06/2008 10/20/2008 10/22/2008 03/02/2009 11/26/2009

Comanche CT.ST. 060208 1848905 STP-116B(125)MS N ALLEN CONTRACTING, INC. 0.968 MI. GRADE, DRAIN, SURFACE AND BRIDGE FLOWER MOUND RD. FROM CACHE RD. EXTEND NORTH TO RODGERS LANE IN LAWTON. $4,172,361.08 $4,139,002.95 05/18/2006 06/05/2006 06/21/2006 07/10/2006 10/02/2006 08/07/2007

Comanche I-44 080135 2029904 BRIY-0044-1(069)043 N SEWELL BROTHERS, INC. 0.376 MI. BRIDGE & APPROACHES I-44 BRIDGES AT MEDICINE BLUFF CRK. APPROX. 2.0 MI. N. OF US-62. $4,794,148.08 $3,090,807.35 03/20/2008 04/07/2008 04/18/2008 05/05/2008 08/04/2008 05/30/2009

Comanche SH-115 070335 2440004 BPMY-116N(147)3B N GIBSON & ASSOCIATES, INC. 0.00 MI. JOINY SEAL/REPAIR SH-115/US-62/SH-36 AT VARIOUS LOCATIONS IN COMANCHEE CO. $164,952.50 $164,952.50 08/16/2007 09/10/2007 09/25/2007 10/04/2007 01/07/2008 04/25/2008

Comanche SH-49 040049 1016707 STPY-116C(001) N SEWELL BROTHERS, INC. 5.224 KM. GR. DR. SURF. SH-49:BEGIN AT SH-58 & EXTEND EAST (RECONSTRUCTION OF EXISTING LANES) $6,799,614.53 $6,234,210.66 01/22/2004 02/02/2004 02/12/2004 03/03/2004 03/22/2004 01/15/2005

Comanche US-277 070136 2023504 STPY-116C(081)SS N T & G CONSTRUCTION, INC. 3.301 MI. GRADE, DRAIN & SURFACE US-277 FROM 6.5 MI. S. OF THE CADDO COUNTY LINE & EXTEND NORTH. $4,774,065.40 $5,154,065.96 07/19/2007 08/06/2007 08/24/2007 11/09/2007 12/03/2007 05/30/2008

Comanche US-277 070433 2023508 STPY-116C(144) N T & G CONSTRUCTION, INC. 3.200 MI. GRADE, DRAIN & SURFACE US-277 BEGIN APPROX. 3.2 MI. S. OF CADDO COUNTY LINE & EXTEND NORTH. $4,188,906.16 $2,398,861.62 01/17/2008 02/04/2008 02/21/2008 03/03/2008 06/02/2008 01/27/2009

Comanche US-62 070085 2103204 ITSY-QT80(26)IT/STPG-116* N TELCO SUPPLY COMPANY *C(141)TR/0.00 MI SFTY IMPROV (ITS INTGRTN)(CCTV CAMERA) VAR LOCS US-62(ROGERS LN)/I-44 & APACHE GATE IN LAWTON. $445,496.35 $465,457.34 07/19/2007 08/06/2007 08/20/2007 08/23/2007 11/21/2007 04/18/2008

Cotton CORD 080222 2371204 BRO-117D(052)CO N BRUTON CONSTRUCTION CO., INC. 0.132 MI. BRIDGE & APPROACHES COUNTY RD. OVER BRUSH CRK. ON EW-181 1.1 MI. E. OF TILLMAN COUNTY LINE. $261,620.00 $268,149.94 05/15/2008 06/02/2008 06/18/2008 06/26/2008 10/06/2008 01/03/2009

Cotton SH-5 090066 2625304 STPY-117B(085)3R N T & G CONSTRUCTION, INC. 5.20 MI. SH-5;RESURFACE ( ASPHALT)BEGIN 0.2 MI. E. OF I-44, EXT EAST TO SH-53. $1,246,058.00 $0.00 01/22/2009 02/02/2009 02/20/2009 02/26/2009 07/31/2009

Craig CORD 080271 2247404 BRF-118C(066)CO* N BEACHNER CONSTRUCTION CO., INC. /BRO-158D(63)CO/0.658 MI. CO.RD.;GRADE,DRAIN,SURFACE, BRIDGE & APPROACHES;ON EXCELSIOR AVE. OVER BULL CR. $1,863,693.90 $1,055,470.46 06/19/2008 07/14/2008 07/22/2008 08/13/2008 11/03/2008 07/30/2009

Craig SH-10 080412 1232504 BRFY-018C(125) N BELK BRIDGE, INC. 0.0770 MI. SH-10/BRIDGE & APPROACHES;OVER BRUSH CREEK, 1.2 MI. EAST OF NOWATA COUNTY LINE. $1,798,006.95 $326,931.29 09/18/2008 10/06/2008 10/20/2008 10/22/2008 02/02/2009 09/29/2009

Craig US-60 090036 1622904 BRFY-018N(009)DC N BECCO CONTRACTORS, INC. 0.590 MI.;US-60;GRADE,DRAIN , SURFACE & BRIDGE. $5,381,584.57 $0.00 01/22/2009 02/02/2009 02/11/2009 02/17/2009 04/13/2009 11/08/2009

Creek CO.RD. 080359 2275104 ACBRO-119D(130)CO N BRIDGECO CONTRACTORS, INC. 0.473 MI. CO.RD.; BRIDGE & APPROACHES; OVER LITTLE DEEP FORK CR., 1.5 MI. SOUTH & 1.0 MI. WEST OF BRISTOW. $770,235.00 $377,626.27 11/20/2008 12/08/2008 12/23/2008 12/31/2008 04/06/2009 10/02/2009

Creek CORD 080056 2214504 STP-119C(122)IG N BECCO CONTRACTORS, INC. 1.254 MI. CO.RD.;GRADE,DRAIN ,SURFACE,BRIDGE(SO. 49TH W. AVE.)FROM NO. OF THE CR. TURNPIKE,EXTEND NO. TO 91ST. $4,372,114.25 $1,855,877.91 01/17/2008 02/04/2008 02/12/2008 04/25/2008 07/07/2008 03/03/2009

Creek SH-48 070365 2028604 SAB-119C(083)BF N BECCO CONTRACTORS, INC. 0.503 MI. SH-48;BRIDGE & APPROACHES/OVER WEST FORK OF SANDY CR., 6.6 MI. NORTH OF OKFUSKEE C/L. $2,377,921.75 $885,565.84 10/18/2007 11/05/2007 11/15/2007 11/20/2007 04/07/2008 12/02/2008

Creek SH-66 070338 1015704 STPY-019A(314)BF N BECCO CONTRACTORS, INC. 1.461 MI. GRADE, DRAIN, BRIDGE, SIGNALS, EROSION CONTROL & SURFACE SH-66 FROM SH-117 ON W. EDGE OF SAPULPA & EXTEND E. $8,991,481.69 $8,806,223.69 10/18/2007 11/05/2007 11/15/2007 01/31/2008 03/03/2008 06/10/2009

Creek SH-97 080326 2503304 HSIPY-119C(171)TR N TRAFFIC & LIGHTING SYSTEMS, LLC 0.00 MI. SH-97;STRIPING & TRAFFIC SIGNAL, AT LINE AVENUE IN SAPULPA. $103,694.45 $103,690.85 08/21/2008 09/19/2008 09/29/2008 10/02/2008 01/05/2009 03/03/2009

Custer CORD 070115 2200504 BRO-120D(102)CO N MUNOZ CONSTRUCTION CO., INC. 0.198 MI. BRIDGE & APPROACHES COUNTY RD. OVER WEST BARNITZ CRK. 3.0 MI. W. & 11.0 MI. N. OF BUTLER. $330,305.16 $324,895.43 03/15/2007 04/02/2007 04/16/2007 04/24/2007 05/28/2007 09/24/2007

Custer CORD 080213 2200704 BRF-120C(104)CO N SEWELL BROTHERS, INC. 0.142 MI. BRIDGE & APPROACHES COUNTY RD. (NS-236) OVER ROUGH CRK 2.5 MI. W. & 4.4 MI. N. OF THOMAS. $531,866.28 $582,585.76 03/20/2008 04/07/2008 04/18/2008 05/15/2008 06/23/2008 10/20/2008

Custer I-40 070339 2407904 SSP-120C(121)SS N MIDSTATE TRAFFIC CONTROL, INC. 12.9 MI. CABLE BARRIER PROJECT I-40 FROM MILEPOST 61.9 TO MILEPOST 82. $1,799,725.89 $1,943,475.49 08/16/2007 09/10/2007 09/25/2007 10/02/2007 11/05/2007 03/03/2008

Custer SH-34 080072 1877904 STPY-120B(050) N CORNELL CONSTRUCTION COMPANY, INC. 6.4730 MI. SH-34;GRADE,DRAIN & EROSION CONTROL. BEGIN APROX5.0 MI. SO. OF CUSTER/DEWEY COUNTY LINE,EXTEND NO. $3,327,593.55 $649,151.56 03/20/2008 04/07/2008 04/16/2008 04/25/2008 08/04/2008 03/06/2009

Custer SH-54 080243 2463604 SBR-120B(147)SB N CIMARRON CONSTRUCTION COMPANY 0.00 MI. BRIDGE REDECKING & REHABILITATION SH-54 OVER LITTLE DEEP CRK. 4.4 MI. N. OF THE WASHITA COUNTY LINE. $707,918.50 $664,590.35 07/24/2008 08/12/2008 08/27/2008 09/02/2008 01/05/2009 04/04/2009

Custer SH-73 080074 2493804 STPY-120C(159) 3R N CASWELL CONTRACTING, INC. 7.370 MI. RESURFACE (OVERLAY) SH-73 BEGIN AT SH-34 & EXTEND EAST. $712,563.80 $911,586.11 02/21/2008 03/03/2008 03/17/2008 03/24/2008 07/07/2008 08/25/2008

Custer SH-73 090043 2516404 STPY-120C(161)3R N CASWELL CONTRACTING, INC. 4.50 MI. RESURFACE(ASPHALT) BEGIN 7.38 MI. E. OF THE SH-34JCT, EXTEND EAST. $568,611.54 $0.00 01/22/2009 02/02/2009 02/18/2009 02/27/2009 04/06/2009 05/05/2009

Custer US-183 070178 0207704 NHY-009N(008) N WITTWER CONSTRUCTION CO., INC. 0.888 MI. GRADE, DRAIN, SURFACE & BRIDGE US-183 BEGIN @ I-40 EXTEND N. TO I-40B IN CLINTON. $9,472,045.00 $9,583,525.28 05/17/2007 06/04/2007 06/20/2007 08/10/2007 10/01/2007 07/26/2008

Delaware US-59 080002 1501504 STPY-021B(273) N KOSS CONSTRUCTION COMPANY & SUBSIDIARY 4.66 MI. US-59;WIDEN & RE- SURFACE/FROM 1.48 MI. N.W. OF THE US-59/SH-25 JCT IN GROVE. $17,356,640.46 $2,647,462.37 07/24/2008 08/12/2008 08/27/2008 09/18/2008 10/27/2008 10/21/2009

Delaware US-60 090079 2613004 STPY-121B(125)3R/STPY-* N GLOVER & ASSOCIATES, INC. *158B(158)3R/ 7.330 MI. RESURFACE (ASPHALT) US-60 FROM SH-85 IN DELAWARE COUNTY EXTEND N. TO US-59 IN OTTAWA COUNTY. $1,039,178.30 $0.00 01/22/2009 02/02/2009 02/19/2009 02/23/2009 07/31/2009

Dewey SH-3 080340 1767105 NHY-017N(069) N J & R SAND COMPANY, INC. 1.174 MI. SH-3/US-270/GRADE DRAIN SURFACE & BRIDGE;BEGIN 0.2 MI. S. OF THE SH-51 JCT, EXTEND S.E. $3,656,949.33 $229,331.42 09/18/2008 10/06/2008 10/21/2008 10/28/2008 02/02/2009 08/30/2009

Dewey SH-34 080262 2081405 BRFY-122B(035) N PBX CORPORATION 0.550 MI. SH-34;JOINT SEAL/ REPAIR,OVER THE SO. CANADIAN RIVER, 13.5 MI. NO. OF THE CUSTER COUNTYLINE. $876,902.50 $575,471.63 06/19/2008 07/14/2008 07/24/2008 07/25/2008 11/03/2008 04/01/2009

Dewey US-270 070173 1767104 NHY-017N(068) N J & R SAND COMPANY, INC. 3.398 MI. GRADE, DRAIN, SURFACE & BRIDGE US-270 BEGIN AT DEWEY/MAJOR COUNTY LINE & EXTEND SOUTHEAST. $12,105,844.54 $14,019,267.68 06/14/2007 07/16/2007 07/30/2007 08/09/2007 11/05/2007 01/27/2009

Ellis CORD 080033 2306504 BRO-123D(047)CO N SEWELL BROTHERS, INC. 0.207 MI. BRIDGE & APPROACHES COUNTY RD. OVER COMMISSION CRK. 12.3 MI. W. & 3.4 MI. S. OF ARNETT ON NS-169. $368,355.90 $367,203.05 02/21/2008 03/03/2008 03/12/2008 03/24/2008 07/07/2008 11/03/2008

Ellis US-283 090101 2094204 SSP-123B(030)SS N SEWELL BROTHERS, INC. 1.280 MI. US-283;BRIDGE & APPROACHES/ OVER WOLF CREEK, NORTH OF SHATTUCK. $6,597,222.13 $0.00 02/19/2009 03/02/2009 03/10/2009 03/12/2009 07/06/2009 03/17/2010

Garfield CT.ST. 080311 2393004 STP-124C(101)MS N DUIT CONSTRUCTION COMPANY, INC. 0.901 MI. GRADE, DRAIN & SURFACE CITY ST. ON WHEAT CAPITAL RD. FROM 1.0 MI. W. OF US-81 EXTEND EAST. $2,463,301.12 $1,841,726.20 07/24/2008 08/12/2008 08/15/2008 09/04/2008 12/01/2008 05/29/2009

Garfield SH-15 080402 2085504 BRFY-124C(045)/BRFY-052C* N PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV) *(204)/ 1.04 MI. GRD, DRN, SURF, BR & ERSN CNTRL SH-15 7.8 MI N OF US-64/SH-15 2.8 MI E OF GARFIELD COUNTY LINE. $7,176,188.58 $1,824,014.62 08/21/2008 09/19/2008 09/30/2008 10/02/2008 01/05/2009 01/29/2010

Garfield SH-74 080342 2097505 BPMY-124C(119)3B N PARADIGM CONSTRUCTION & ENGINEERING, INC 0.00 MI. SH-74/SH-15; JOINT /SEAL REPAIR.AT VARIOUS LOCATIONS IN DIV. IV. $81,681.75 $0.00 09/18/2008 10/06/2008 10/20/2008 10/22/2008 03/02/2009 04/30/2009

Garvin CORD 080224 2364204 BRO-125D(144)CO N K & R BUILDERS, INC. 0.208 MI. BRIDGE & APPROACHES COUNTY RD. OVER SALT CRK. 2.3 MI. W. & 3.3 MI. N. OF SH-7/SH-74 JCT. $804,111.24 $804,501.39 05/15/2008 06/02/2008 06/13/2008 06/30/2008 08/04/2008 12/31/2008

Garvin I-35 070124 1800105 IMY-35-2(262)67/IMY* N PBX CORPORATION -40-5(353)196/BHIY-35-2(264)77/NHY-21N(24)/NHY-17N(104)(105)/0.00 MI. JOINT SEAL/REPAIR VARIOUS LOCATIONS IN DIV. 3. $488,377.00 $541,919.46 04/19/2007 05/07/2007 05/22/2007 05/30/2007 09/03/2007 01/30/2008

Garvin I-35 080160 1800305 IMY-35-2(265)74/BHIY-35-* N PBX CORPORATION *2(267)70/IMY-40-5(359)211/BHFY-125C(82) JOINT SEAL & REPAIR I-40/I-35/SH-59B AT VARIOUS LOCATIONS IN DIVISION 3. $418,902.00 $360,957.25 04/17/2008 04/25/2008 05/12/2008 05/19/2008 09/08/2008 02/19/2009

Grady CORD 080123 2542904 BRO-126D(163)CO N K & R BUILDERS, INC. 0.247 MI. CO.RD.;BRIDGE & APPROACHES/OVER WASHITA RIVER,0.5 MI. NO. & 0.25 MI. WEST OF VERDEN. $1,417,092.04 $1,389,207.38 02/21/2008 03/03/2008 03/12/2008 04/02/2008 05/05/2008 09/01/2008

Grady CORD 080272 2313704 BRO-126D(109)CO N D. M. DOZERS, INC. 0.167 MI.,CO.RD.; BRIDGE & APPROACHES/OVER WEST CR., APPROX. 2.0 MI. NO. OF JCT. SH-37/SH-92 IN TUTTLE. $474,674.58 $449,764.72 06/19/2008 07/14/2008 08/05/2008 08/07/2008 10/06/2008 01/03/2009

Grady SH-37 080204 2506404 SBR-126C(137)SB N K & R BUILDERS, INC. 0.00 MI. SH-37; BRIDGE REPR. OVER AN UNNAMED CREEK, APPROX.0.7 MI. W. OF SH-92. $398,217.00 $390,209.16 04/17/2008 04/25/2008 05/07/2008 05/09/2008 09/08/2008 12/06/2008

Grady SH-39 080374 2023304 STPY-126B(057) N SEWELL BROTHERS, INC. 2.99 MI. GRADE, DRAIN, SURFACE AND BRIDGE SH-39 FROM 0.87 MI. EAST OF US-62 AND ESTEND EAST. $6,290,136.44 $1,035,421.01 11/20/2008 12/08/2008 12/18/2008 12/30/2008 04/06/2009 01/10/2010

Grady SH-4 090080 2502404 STPY-126C(135)3R N T & G CONSTRUCTION, INC. 0.98 MI. SH-4;RESURFACE (ASPHALT)BEGIN 1.0 MI. SO. OF SH-37 JCT. EXT. NORTH (ADD ALT SH-92;BEG. 0.4 MI. SO $341,142.05 $0.00 01/22/2009 02/02/2009 02/20/2009 02/26/2009 07/31/2009

Grady US-62 080424 2501704 SSR-126B(134)SR N M.J. LEE CONSTRUCTION COMPANY 0.130 MI. US-62; BANK PRO- TECTION/ EAST OF NS-283 AT R/R OVERPASS. $441,946.40 $428,745.68 09/18/2008 10/06/2008 10/23/2008 10/28/2008 02/02/2009 04/02/2009

Grady US-81 080465 2451504 SSP-126N(120)(121)SS N PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC 0.180 MI. BRIDGE REDECKING & REHABILITATION US-81 OVER LITTLE WASHITA RVR. 1.0 MI. S. OF SH-19 (N.& S.BOUND LANES). $2,739,899.48 $0.00 09/18/2008 10/06/2008 10/20/2008 10/22/2008 03/16/2009 10/01/2009

Grady US-81 090022 2614204 CMC-126A(173) N T & G CONSTRUCTION, INC. 1.620 MI. US-81; RESURFACE (ASPHALT) BEGIN 17.29 MI. NO. OF US-62, EXT. NORTH. $462,607.50 $0.00 01/22/2009 02/02/2009 02/20/2009 02/26/2009 06/30/2009

Grant CORD 070435 2289204 BRF-127C(085)CO N REECE CONSTRUCTION CO., INC. 0.264 MI. BRIDGE & APPROACHES COUNTY RD. (EW-2) OVER CROOKED CRK. APPROX. 0.7 MI. S. & 6.2 MI. E. OF MANCHESTER. $405,269.08 $378,804.94 11/15/2007 12/03/2007 12/17/2007 01/08/2008 04/07/2008 07/05/2008

Grant SH-132 080263 1044604 BRFY-027C(241) N MUSKOGEE BRIDGE COMPANY, INC. 0.387 MI. SH-132;GRADE, DRAIN,SURFACE,& BRIDGE/OVER SALT FORK OF THE ARKANSAS RIVER, 2.79 MI. N. OF US-64. $3,268,845.82 $933,329.19 09/18/2008 10/06/2008 10/21/2008 11/12/2008 01/05/2009 06/03/2009

Grant US-64 070218 2185004 BRFY-127C(061)BF N PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC 0.731 MI. GRADE, DRAIN, SURFACING, BRIDGE & APPROACHES US-64 OVER UNNAMED CRK. 1.1 MI. E. OF THE ALFALFA COUNTY LINE. $3,459,978.04 $3,207,389.62 08/16/2007 09/10/2007 09/24/2007 10/05/2007 01/07/2008 10/02/2008

Greer CORD 080047 2165004 BRO-128D(058)CO N K & R BUILDERS, INC. 0.127 MI. BRIDGE & APPROACHES CO. RD. (NS-188) OVER SLEEPY JOHN CRK. 4.0 MI. E. & 3.6 MI. N. OF REED. $422,746.90 $387,148.16 01/17/2008 02/04/2008 02/19/2008 03/17/2008 05/05/2008 09/01/2008

Greer SH-6 080136 1010107 STPY-128B(006) N CORNELL CONSTRUCTION COMPANY, INC. 5.990 KM SURFACE SH-6 BEGIN 5.0 MI. N. OF THE SH-6/SH-9 JCT. & EXTEND N. ON NEW ALIGNMENT. $8,403,903.39 $3,634,054.16 04/17/2008 04/25/2008 05/07/2008 05/09/2008 06/16/2008 04/11/2009

Greer SH-9 090094 2622704 SSR-128C(077)(78)SR N CASWELL CONTRACTING, INC. 9.0 MI. SH-9;RESURFACE ( ASPHALT) BEGIN AT US-283 & EX-TEND EAST THRU GRANITE. BEGIN 8.0 MI. E. OF US-283. $1,379,493.88 $0.00 01/22/2009 02/02/2009 03/03/2009 03/06/2009 07/06/2009 08/19/2009

Harmon CO.RD. 080439 2108304 BRO-NBIL(024)CO N WITTWER CONSTRUCTION CO., INC. 0.189 MI. BRIDGE & APPROACHES COUNTY RD. (EW-158) 3.0 MI. N. & 2.3 MI. E. OF HOLLIS. $276,201.03 $274,618.42 09/18/2008 10/06/2008 10/14/2008 10/16/2008 02/02/2009 05/02/2009

Harmon CORD 080256 2493904 STP-129C(037)DC N CORNELL CONSTRUCTION COMPANY, INC. 8.002 MI. GRADE & DRAIN COUNTY RD. (NS-183) BEG. US-62 EXT. S. TO EW-168 THEN TO NS-184 E. THEN EXT. S. ON NS-184. $1,100,457.50 $1,183,356.50 04/17/2008 04/25/2008 05/05/2008 05/09/2008 06/16/2008 11/12/2008

Harper CO.RD. 090030 2254104 BRO-130D(095)CO N OBC, INC. 0.179 MI. CO.RD. BRIDGE & APPROACHES;OVER AN UNNAMED CR.LOCATED 7.5 MI. SO. & 1.4 MI. E. OF SELMAN. $417,363.70 $0.00 01/22/2009 02/02/2009 02/12/2009 02/18/2009 05/04/2009 08/31/2009

Harper SH-3 080440 2327505 BRFY-130F(129) N JLT CONTRACTING, LLC 0.00 MI. BRIDGE REPAIR (FLOOD COATING) SH-3/US-270/US-412/SH-8 AT VARIOUS LOCATIONS IN DIVISION 6. $82,973.30 $59,990.46 09/18/2008 10/06/2008 10/23/2008 10/28/2008 03/02/2009 04/01/2009

Harper US-283 070207 2094404 BRFY-130B(063)BF N PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC 0.284 MI. GRADE, DRAIN SURFACE & BRIDGE US-283 HIGHWAY OVER SPRING CRK. 2 MI. N. OF US-270 JCT. $1,995,257.26 $2,014,722.49 07/19/2007 08/06/2007 08/17/2007 08/21/2007 12/03/2007 06/04/2008

Harper US-64 080327 2094604 BRFY-130B(069) N WITTWER CONSTRUCTION CO., INC. 0.188 MI. GRADE, SURFACE, EROSION CONTROL & BRIDGE US-64 OVER BADGER CRK. 5.2 MI. E. OF US-183 JCT. $1,480,692.88 $216,200.79 10/16/2008 11/03/2008 11/19/2008 11/25/2008 03/02/2009 05/30/2009

Harper US64 060424 1886804 BRFY-130B (042) N MUNOZ CONSTRUCTION CO., INC. 0.397 MI. BRIDGE & APPROACHES US-64 OVER BUFFALO CRK. 14.4 MI. E. OF BEAVER COUNTY LINE. $13,591.22 $2,052,740.32 11/16/2006 12/04/2006 12/18/2006 01/24/2007 04/02/2007 10/18/2007

Haskell CORD 090138 2492704 BRO-131D(084)CO N GLOVER & ASSOCIATES, INC. 0.189 MI. CO.RD./BRIDGE & APPROACHES;OVER BEAR CREEK, 3.0 MI. SO. & 3.4 MI. WEST OF SH-9/SH-71 JCT. $313,608.36 $0.00 02/19/2009 03/02/2009 03/16/2009 03/18/2009 06/01/2009 08/29/2009

Haskell SH-31 090158 2478804 BHFY-131C(083)* N PBX CORPORATION */SBR-131C(76)SB / SH-31; BRIDGE REHABILITATION;OVER SANBOIS CR. 2.3 MI. EAST OF SH-2, & OVER TURKEY CR. 8.6 MI $1,540,786.75 $0.00 02/19/2009 03/02/2009 03/17/2009 03/20/2009 08/03/2009 02/28/2010

Haskell SH-71 070399 1765604 SAB-131C(022)BF* N PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC *SAB-168C(161)BF/ 0.161 MI BR. & APPRS. SH-71/EMACHAYA CRK. 1.7 MI. S. SH-9/SH-141; SH-71/COOK CRK. 4.6 MI. E. OF US-59. $1,657,247.58 $1,786,410.11 10/18/2007 11/05/2007 11/20/2007 11/27/2007 05/05/2008 10/31/2008

Haskell SH-9 090136 2310304 SSP-NBIP(355)SS N SEMINOLE EQUIPMENT, INC. 0.00 MI. SH-9; BRIDGE PAINT- ING; OVER SANS BOIS CREEK, 15 MI. EAST OF SH-2 JCT. $356,036.70 $0.00 02/19/2009 03/02/2009

Hughes CORD 080273 2193304 BRO-132D(083)CO N D. M. DOZERS, INC. 0.349 MI. GRADE, DRAIN, SURFACE & BRIDGE COUNTY RD. OVER ELM CRK. 0.1 MI. N. & 4.3 MI. E. OF YEAGER. $668,823.40 $628,331.67 06/19/2008 07/14/2008 08/05/2008 08/12/2008 10/06/2008 02/02/2009

Hughes SH-31 090081 2595404 STPY-132C(121)3R N THE CUMMINS CONSTRUCTION CO., INC. 7.130 MI. SH-31;RESURFACE (ASPHALT)BEGIN 2.0 MI. SOUTH OF JCT. SH-31/SH-31A, EX- TEND NORTH TO SH-1. $1,262,313.74 $0.00 01/22/2009 02/02/2009 02/18/2009 02/24/2009 07/31/2009

Hughes SH-48 080265 0650504 SSP-032C(181)SS N M.J. LEE CONSTRUCTION COMPANY 0.492 MI. GRADE, DRAIN, SURFACE, BRIDGE & EROSION CONTROL PLAN SH-48 WEWOKA CRK. & OVERFLOW N. OF HOLDENVILLE. $3,004,880.09 $2,998,239.38 06/19/2008 07/14/2008 07/23/2008 07/25/2008 11/03/2008 11/03/2008

Hughes SH-48 090144 2463904 SBR-132C(105)(106)SB N LOGOS CONSTRUCTION COMPANY 0.287 MI. SH-48;OVER LONG GEORGE CR., 8.9 MI. NO. OF US-270.SH-9;OVER LONG GEORGE CR., 0.92 MI. E. OF SEMINOLE $792,607.12 $0.00 02/19/2009 03/02/2009 03/16/2009 03/17/2009 07/06/2009 11/02/2009

Hughes US-75 080174 2451604 SBR-132N(102)(103)SB N PBX CORPORATION 0.210 MI. BRIDGE REHAB. US-75/CRI&P RR APPROX. 0.1 MI. N. US-270. US-75/US-270 & ABANDONED RR IN CALVIN. $1,336,053.25 $879,352.33 03/20/2008 04/07/2008 04/18/2008 05/02/2008 08/04/2008 01/30/2009

Jackson CO.RD. 080367 2353404 CIRB-133C(071)RB N K & R BUILDERS, INC. 0.426 MI. CO.RD.; BRIDGE & APPROACHES; OVER THE SALT FORKOF THE RED RIVER, 2.0 MI. WEST OF MARTHA. $2,037,928.28 $0.00 11/20/2008 12/08/2008 01/12/2009

Jackson CORD 080457 2353504 BRF-133C(072)CO/BRO-133D* N SEWELL BROTHERS, INC. *(73)CO/ 0.33 MI. CO.RD. BRIDGE & APPROACHES/OVER UN- NAMED CR., 7.0 MI. S & 0.2 MI.E OF US-62/US-283 JCT. $696,742.00 $34,131.04 10/16/2008 11/03/2008 11/13/2008 11/20/2008 03/02/2009 09/27/2009

Jefferson CORD 080107 2182704 CIRB-134C(050)RB N OBC, INC. 0.273 MI. CO.RD., BRIDGE & APPROACHES;OVER NEGRO CREEK APPROX. 7.0 MI. W. OF SH- 89. $717,866.56 $674,305.66 07/24/2008 08/12/2008 08/27/2008 08/28/2008 12/01/2008 03/30/2008

Jefferson CORD 080228 2365004 BRO-134D(060)CO N BRUTON CONSTRUCTION CO., INC. 0.147 MI. CO.RD.;BRIDGE & APPROACHES; OVER W. MUD CREEK,6.4 MI. EAST & 1.0 MI. N. OF JCT. US-70/US-81 JCT. $261,547.50 $240,785.14 05/15/2008 06/02/2008 06/18/2008 06/26/2008 10/06/2008 01/03/2009

Jefferson SH-5 070397 2323104 BRFY-134C(058)BF N OVERLAND CORPORATION 1.242 MI. GRADE, DRAIN, SURFACE, BRIDGE & EROSION CONTROL SH-5 OVER BEAVER CRK. APPROX. 5.6 MI. E. OF COTTON CO. LN. $3,798,079.87 $3,763,002.72 09/20/2007 10/08/2007 10/18/2007 10/30/2007 04/07/2008 04/06/2009

Jefferson US-81 080427 2594804 CMC-134N(075) N T & G CONSTRUCTION, INC. 0.200 MI. US-81; RESURFACE (ASPHALT) BEGIN 0.45 MI. NO. OF US-70, EXTEND WEST. $109,706.70 $96,437.97 08/21/2008 09/19/2008 10/02/2008 10/07/2008 11/01/2008

Johnston CORD 080108 2060304 BRO-135D(048)CO N L&N BRIDGE, LLC 0.234 MI., CO.RD.; GRADE, DRAIN, SURFACE & BRIDGE/OVER HORSE CR., 3.3 MI. E. & 1.1 MI. NORTH OF NIDA. $447,366.40 $419,413.24 07/24/2008 08/12/2008 08/27/2008 09/02/2008 11/03/2008 02/10/2009

Johnston SH-7 090035 2320704 STPY-135C(091) N MUSKOGEE BRIDGE COMPANY, INC. 0.20 MI. SH-7;GRADE,DRAIN, SURFACE, AND BRIDGE;OVER BLUE RIVER, 2.5 MI. EAST OF SH -99. $2,320,381.99 $0.00 01/22/2009 02/02/2009 02/19/2009 02/20/2009 04/01/2009 10/27/2009

Johnston SH-7 090146 2478504 SBR-135C(104)SB N PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC 0.1170 MI. SH-7; BRIDGE RE- DECKING & REHAB.;OVER ROCK CR., 0.96 MI. EAST OF SH-1. $499,192.14 $0.00 02/19/2009 03/02/2009 03/12/2009 03/17/2009 07/06/2009 10/03/2009

Johnston SH-7D 080148 2451704 SBR-135C(101)SB N K & R BUILDERS, INC. 0.0670 MI. SH-7D;BRIDGE RE- HABILITATION;OVER DELAWARE CR., APPROX. 0.7 MI. NORTH OF SH-7 $735,272.63 $609,880.39 06/19/2008 07/14/2008 07/23/2008 07/25/2008 11/03/2008 01/31/2009

Johnston SH-99 080403 2179004 BRFY-135B(064) N MUSKOGEE BRIDGE COMPANY, INC. 0.597 MI. SH-99;GRADE,DRAIN, SURFACE & BRIDGE. OVER BLUE RIVER, 3.8 MI. SOUTH OF PONTOTOC COUNTY LINE. $3,168,587.77 $1,163,512.53 07/24/2008 08/12/2008 08/22/2008 08/25/2008 12/01/2008 05/29/2009

Kay CO.RD. 080426 2510704 STP-136C(164)CO N EVANS & ASSOCIATES CONSTRUCTION CO., INC. 2.98 MI. RESURFACE (ASPHALT) COUNTY RD. (EW-21) FROM "S" ST. TO RANCH RD. IN PONCA CITY. $677,536.05 $773,597.87 09/18/2008 10/06/2008 10/23/2008 10/24/2008 12/01/2008 01/14/2009

Kay I-35 070212 2408404 IMG-0035-4(212)222TR N ACTION SAFETY SUPPLY CO. 6 MI. SAFETY IMPROVEMENT (CABLE BARRIER) I-35 FROM MILE POST 221 N. 6 MI. TO MILE POST 227. $796,189.42 $760,795.68 05/17/2007 06/04/2007 06/20/2007 07/09/2007 08/06/2007 10/04/2007

Kay I-35 080004 2413904 IMG-0035-4(213)227TR N ACTION SAFETY SUPPLY CO. 6.0 MI. SAFETY IMPROVEMENT (CABLE BARRIER) I-35 BEGIN AT MILE POST 227 & EXTEND TO MILE POST 235. $1,561,972.50 $1,334,406.75 01/17/2008 02/04/2008 02/21/2008 02/29/2008 04/07/2008

Kay I-35 080183 2414004 IMG-0035-4(214)209TR N ACTION SAFETY SUPPLY CO. 0.00 MI. I-35/SAFETY IMPROV. (CABLE BARRIER);BEGIN AT MILE MARKER 209 & EXTEND NORTH TO MILE MARKER 214. $798,610.07 $371,906.52 04/17/2008 04/25/2008 05/07/2008 05/09/2008 07/07/2008 09/04/2008

Kay I-35 060358 2034006 STPY-136E(127)EH N DUIT CONSTRUCTION COMPANY, INC. 0.85 MI. GRADE, DRAIN & SURFACE I-35 (TOURIST INFO. CNTR.) BEGIN 3.0 MI. N. OF THE CITY OF BLACKWELL. $5,492,496.11 $5,920,839.00 09/21/2006 10/02/2006 10/20/2006 11/13/2006 12/04/2006 06/01/2007

Kay IS-35 050695 1559304 IMY-0035-4(168)222 N DUIT CONSTRUCTION COMPANY, INC. 0.920 MI. INTERCHANGE MODIFICATION/BRIDGE & APPROACHES I-35; INTERCHANGE AT I-35 & SH-11. $9,017,466.21 $9,412,001.97 01/19/2006 02/13/2006 02/21/2006 03/08/2006 06/06/2006 04/26/2007

Kay US-177 080373 2321604 BRFY-136C(124)(123) N PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV) 1.563 MI. US-177/ GRADE, DRAIN,SURFACE & BRIDGE;OVER DRY CR & DRY CR O'FLOW, 12. 4 MI. N. OF US-60. $5,384,031.40 $0.00 11/20/2008 12/08/2008 12/18/2008 01/14/2009 04/06/2009 10/22/2009

Kay US-77 080115 2451804 SBR-136C(150)SB N MUSKOGEE BRIDGE COMPANY, INC. 0.00 MI. BRIDGE REHABILITATION US-77 BRIDGE OVER SALT FORK RIVER APPROX. 0.7 MI. SOUTH OF THE US-60B/US-77 JCT. $1,470,471.75 $1,406,390.60 05/15/2008 06/02/2008 06/16/2008 06/26/2008 10/06/2008 01/03/2009

Kingfisher CO.RD. 090060 2282104 STP-137C(066)CI N DUIT CONSTRUCTION COMPANY, INC. 4.99 MI. CO.RD.;GRADE,DRAIN & SURFACE;FROM THE CANADIAN COUNTY LINE, EXTEND NORTH. $2,306,384.51 $0.00 01/22/2009 02/02/2009 02/10/2009 02/12/2009 06/01/2009 09/28/2009

Kingfisher CORD 080274 2140904 BRO-137D(038) CO N BRIDGECO CONTRACTORS, INC. 0.179 MI. CO. RD.;BRIDGE & APPROACHES, OVER DEAD INDIAN CR. APPROX. 3.3 MIL SO. & 4.8 MI. W. OF JCT. SH-33/US-81 $567,893.80 $563,655.12 08/21/2008 09/19/2008 09/29/2008 10/02/2008 01/05/2009 06/03/2009

Kingfisher CORD 060322 2277904 BRF-137C(065)CO N PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC 0.756 MI. BRIDGE & APPROACHES COUNTY RD. (NS-283) OVER CIMARRON RVR. APPROX. 3.0 MI. W. & 0.3 MI. S. OF DOVER. $1,762,480.06 $1,684,731.08 04/19/2007 05/07/2007 05/22/2007 07/03/2007 08/06/2007 02/21/2008

Kiowa CO.RD 070118 2134604 BRO-138D(080)CO N MUNOZ CONSTRUCTION CO., INC. 0.245 MI. BRIDGE & APPROACHES COUNTY RD. OVER UNNAMED CRK. 4.0 MI. W. & 6.7 MI. S. OF SH-9/SH-54 JCT. $248,804.00 $236,713.86 03/15/2007 04/02/2007 04/12/2007 04/17/2007 05/21/2007 09/17/2007

Kiowa CORD 080137 2266204 BRO-138D(099)CO N SEWELL BROTHERS, INC. 0.151 MI. BRIDGE & APPROACHES COUNTY RD. OVER UNNAMED TRIB. OF RAINY MOUNTAIN CRK. 2.0 MI. W. & 2.1 MI. N. OF GOTEBO. $357,699.86 $350,315.68 03/20/2008 04/07/2008 04/18/2008 05/01/2008 08/04/2008 12/01/2008

Kiowa US-183 090067 2611804 SSP-138N(158)(159)SS N DOBSON BROTHERS CONSTRUCTION CO. 11.070 MI. US-183; WIDEN & RESURFACE;BEGIN AT SH-19, EX- TEND NORTH TO SH-9W. $1,425,841.52 $0.00 01/22/2009 02/02/2009 02/12/2009 02/25/2009 06/01/2009 11/22/2009

Latimer CORD 080345 2359204 BRO-NBIL(074)CO N HUB CONSTRUCTION, INC. 0.111 MI. CO.RD.; BRIDGE & APPROACHES;OVER ROCK CR., 1.0 MI. NO. & 1.0 MI. W. OF LODI. $530,372.65 $319,466.35 08/21/2008 09/19/2008 09/30/2008 10/02/2008 01/05/2009 04/14/2009

Latimer SH-2 080034 2314204 BRFY-139B(062) N MUSKOGEE BRIDGE COMPANY, INC. 0.637 MI. BRIDGE & APPROACHES SH-2 OVER GAINES CRK. 14.5 MI. N. OF PUSHMATAHA COUNTY LINE. $2,711,367.77 $2,225,361.87 01/17/2008 02/04/2008 02/12/2008 02/15/2008 06/02/2008 12/28/2008

Latimer US-270 080210 2506604 MC-139B(092) N JOB CONSTRUCTION CO., INC. 4.00 MI. RESURFACE US-270 BEGIN APPROX. 0.6 MI. W. OF SH-82 SOUTH & EXTEND EAST. $695,233.05 $806,253.51 04/17/2008 04/25/2008 05/09/2008 05/16/2008 08/04/2008 10/02/2008

Le Flore SH-112 080249 2570704 MC-140C(166) N JOB CONSTRUCTION CO., INC. 4.00 MI. SH-112; RESURFACE (ASPHALT);BEGIN AT THE EAST EDGE OF POTEAU, EXTEND EAST. $924,707.64 $0.00 07/24/2008 08/12/2008 08/27/2008 08/28/2008 10/01/2008

Le Flore SH-128 050722 0891604 BRFY-40C(356) N PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC 2.993 KM GRADE, DRAIN, SURFACE & BRIDGES SH-128 OVER SUGAR CRK. & 5 UNNAMED CRKS. SOUTHEAST OF HEAVENER. $8,016,994.97 $7,839,593.70 02/16/2006 03/06/2006 03/22/2006 03/24/2006 06/05/2006 07/09/2007

Le Flore SH-128 080191 2314405 BRFY-140C(164) N GARY A. CRAIN, INC. 0.00 MI. SH-128/SH-112, BRIDGE WATERPROOF SEAL (SILANE); VARIOUS LOCATIONS IN DIV. II $19,641.00 $17,166.14 04/17/2008 04/25/2008 05/12/2008 05/16/2008 09/08/2008 10/07/2008

Le Flore SH-144 070187 1765904 BRFY-140C(044)BF N HUB CONSTRUCTION, INC. 0.479 MI.SH-144;GRADING, DRAIN, SURFACE & BRIDGE/OVER ROCK CR., 3.5 MI. E. OF PUSHMATAHA. $2,089,413.80 $2,028,055.06 07/19/2007 08/06/2007 08/20/2007 08/23/2007 10/01/2007 02/27/2008

Le Flore SH-144 080214 2370204 BRFY-140C(143) N HUB CONSTRUCTION, INC. 0.639 MI. SH-144;BRIDGE & APPROACHES;OVER LITTLE ROCK CR, EAST OF THE PUSHMATAHA COUNTY LINE. $2,818,407.90 $641,316.70 07/24/2008 08/12/2008 08/22/2008 08/25/2008 12/01/2008 06/18/2009

Le Flore US-271 080084 1139504 NHY-33N(001)/BRFY-* N OBC, INC. *033N(002)/ 1.665 MI. GRADE, DRAIN, SURFACE & BRIDGE US-271 FROM SH-112 WEST TO SH-9A. $10,509,447.10 $6,353,368.89 02/21/2008 03/03/2008 03/12/2008 03/27/2008 07/07/2008 08/10/2009

Le Flore US-59 080229 2472504 HSIPG-140A(155)TR N C-GAWF CONSTRUCTION, INC. 0.00 MI. US-59; INTERSECTION MODIFICATION;AT L.C. WELLS RD.IN THE TOWN OF SHADY POINT. $141,085.00 $89,210.00 06/19/2008 07/14/2008 08/05/2008 08/12/2008 11/10/2008 12/09/2008

Le Flore US-59 080284 2569104 SSR-140A(165)SR N JOB CONSTRUCTION CO., INC. 4.990 MI. US-59; RESURFACE (ASPHALT) BEGIN AT NORTH HOWE CITY LIMITS, EXTEND NORTH. $2,277,289.79 $2,263,486.06 06/19/2008 07/14/2008 07/29/2008 07/31/2008 09/08/2008

Lincoln CORD 080230 2073004 BRO-141D(117)CO N BELK BRIDGE, INC. 0.283 MI. CO.RD.;BRIDGE & APPROACHES;OVER DRY CR.,4.0 MIEAST & 1.5 MI. SO. OF DAVENPORT. $803,659.68 $667,352.72 05/15/2008 06/02/2008 06/18/2008 06/26/2008 10/06/2008 04/03/2009

Lincoln SH-18 080184 1340308 STPY-141C(165) N JIM COOLEY CONSTRUCTION, INC. 0.00 MI. LANDSCAPING (ENVIRONMENTAL MITIGATION & EROSION CNTRL) SH-18 BEG APPROX 9.3 MI N OF US-62 JCT & EXTEND N. $513,337.00 $480,403.30 04/17/2008 04/25/2008 05/13/2008 05/23/2008 09/08/2008 09/02/2009

Lincoln SH-18 080421 2326904 IMY-0044-2(449)166 N ALLEN CONTRACTING, INC. 0.464 MI. SH-18;BRIDGE & APPROACHES/OVER THE TURNER TURNPIKE (I-44). $4,341,471.05 $653,684.27 10/16/2008 11/03/2008 11/17/2008 11/21/2008 03/02/2009 10/27/2009

Lincoln SH-99 040371 1253905 BRFY-12N(28) N MUSKOGEE BRIDGE COMPANY, INC. 1.06 MI. GRADE, DRAIN, SURFACE & BRIDGE SH-99 OVER DEEP FORK RIVER & OVERFLOW 4.9 MI. S. OF STROUD. $4,164,385.88 $4,031,781.58 10/21/2004 12/06/2004 12/20/2004 01/07/2005 04/05/2005 01/28/2006

Lincoln US-62 080344 2578205 BPMY-125B(167)3B N GIBSON & ASSOCIATES, INC. 0.00 MI. US-62; JOINT SEAL/ REPAIR; VARIOUS LOCATIONS IN DIV. III. $782,594.00 $130,757.80 10/16/2008 11/03/2008 11/17/2008 11/25/2008 03/02/2009 07/29/2009

Lincoln US-62 080343 2578204 BPMY-NBIP(400)3B N POSEIDON CONSTRUCTION, INC. 0.00 MI. BRIDGE PAINTING SH-19 / SH-74 / US-62 AT VARIOUS LOCATIONS IN DIVISION 3. $94,962.00 $0.00 09/18/2008 10/06/2008 10/23/2008 12/04/2008 02/02/2009 05/02/2009

Logan CORD 080275 1897504 BRO-142D(063)CO N K & R BUILDERS, INC. 0.196 MI.CO.RD./BRIDGE & APPROACHES;OVER BEAVER CR., APPROX. 5.3 MI. SO. OF JCT SH-51/US-77. $819,960.10 $765,195.91 06/19/2008 07/14/2008 07/23/2008 07/25/2008 10/06/2008 02/02/2009

Logan I-35 080129 2506104 IMG-0035-4(223)146TR* N ACTION SAFETY SUPPLY CO. *NHG-25N(005)TR/IMG-35-3 (296)126 TR/ 19.80 MI. I-35 STRIPING/PAVEMENT MARKING. MULTIPLE LOCATIONS. $877,220.52 $167,786.58 04/17/2008 04/25/2008 05/09/2008 05/19/2008 07/07/2008 12/03/2008

Logan SH-51 080406 1836104 BRFY-142C(48)(123) N OBC, INC. 1.094 MI BR & APPRS/GRD, DRN, SURF & BR SH-51 OTTER CRK 6.4 MI E KINGFISHER C/L. US-77 SKELETON CRK 7.2 MI N SH-33. $7,382,378.40 $4,177,319.55 09/18/2008 10/06/2008 10/21/2008 10/29/2008 02/02/2009 11/28/2009

Love IS-35 070407 2414104 IMG-0035-1(146)013TR N JIM COOLEY CONSTRUCTION, INC. 0.00 MI. SAFETY IMPROVEMENT (CABLE BARRIER PROJECT) I-35 BEGIN AT THE TX. ST. LINE & EXTEND N. TO MM 12.5 (4 LOCS.) $1,364,152.19 $1,103,480.01 11/15/2007 12/03/2007 12/19/2007 01/04/2008 02/04/2008 06/02/2008

Love IS-35 080445 2216110 SEC1702Y-143N(072)HP N OVERLAND CORPORATION 0.88 MI. GRADE, DRAIN & SURFACE ROGERS RD. FROM JCT. I-35 / US-77 EXTEND EAST. $2,476,542.95 $282,685.43 10/16/2008 11/03/2008 11/10/2008 11/18/2008 03/02/2009 08/28/2009

Love SH-32 070007 2026404 BRFY-143C(046) N OBC, INC. 1.470 MI. BRIDGE & APPROACHES SH-32 OVER WALNUT BAYOU APPROX. 14.7 MI. E. OF THE JEFFERSON COUNTY LINE. $6,059,419.07 $5,894,138.39 01/18/2007 02/06/2007 02/21/2007 03/12/2007 06/04/2007 05/28/2008

Love SH-32 080231 2096304 BRFY-143C(057) N PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV) 0.6620 MI. SH-32; BRIDGE & APPROACHES/OVER ROCK CR. APPROX. 4.7 MI. W. OF MARRIETTA. $3,199,999.99 $1,315,350.44 05/15/2008 06/02/2008 06/12/2008 06/27/2008 10/06/2008 05/03/2009

Major CORD 070326 2131004 STP-147C(087)CO* N J & R SAND COMPANY, INC. *BRF-147C(098)CO; 4.193 MI. RESURF CO RD BEG @ US-281 2 MI S OF CHESTER/OVER WEST CRK 2.2 MI W & 5 MI N US-412/US-281 $1,364,608.34 $1,380,132.56 07/19/2007 08/06/2007 08/20/2007 08/23/2007 09/24/2007 04/10/2008

Marshall US70 070388 1740611 ACNHY-022N(040)GB N OVERLAND CORPORATION 1.684 MI. US-70; GRADE,DRAIN, SURFACE,BRIDGE & EROSION CON- TROL.BEGIN 4.3 MI. W. OF US- 177 JCT, EXTEND EAST. $8,096,958.36 $1,886,619.26 07/24/2008 08/12/2008 08/22/2008 08/26/2008 12/01/2008 11/25/2009

Mayes CO.RD. 080313 2234904 BRO-149D(086)CO N PARADIGM CONSTRUCTION & ENGINEERING, INC 0.156 MI. BRIDGE & APPROACHES COUNTY RD. OVER SALINE CREEK 0.89 MI. NN. & 7.3 MI. E. OF SALINA. $1,092,312.45 $691,082.97 07/24/2008 08/12/2008 08/27/2008 09/03/2008 10/06/2008 04/03/2009

Mayes US-69 070438 2089304 BRFY-013N(083)SS N BECCO CONTRACTORS, INC. 0.264 MI. US-69;BRIDGE & APPROACHES;OVER CHOUTEAU CR., 9.4 MI. NO. OF WAGONER CO. LINE. $1,375,856.94 $1,309,624.33 11/15/2007 12/03/2007 12/17/2007 01/03/2008 04/07/2008 01/01/2009

Mayes US-69 080346 2312704 NHY-013N(107) N APAC-OKLAHOMA, INC. 1.382 MI. US-69; GRADE,DRAIN , & SURFACE/BEGIN 0.15 MI. NO.OF US-412, EXTEND NORTH. $2,420,802.12 $56,465.53 11/20/2008 12/08/2008 12/18/2008 12/30/2008 03/02/2009 08/08/2009

McClain CORD 080171 2114004 BRO-144D(075)CO N OBC, INC. 0.2700 MI. CO.RD.;BRIDGE & APPROACHES;OVER CRINER CR. 3.0 MI. SO. & 0.5 MI. EAST OF CRINER. $755,723.66 $702,864.09 04/17/2008 04/25/2008 05/05/2008 05/09/2008 09/08/2008 01/05/2009

McClain US-62 060279 1357404 STPY-044B(319) N HASKELL LEMON CONSTRUCTION CO. 1.694 MI. GRADE, DRAIN, SURFACE & BRIDGE US-62 FROM GRADY COUNTY LINE EXTEND N. THRU BLANCHARD. $9,459,984.70 $9,685,974.00 05/17/2007 06/04/2007 06/20/2007 07/09/2007 08/13/2007 06/07/2008

McClain US-77 090082 2599304 STPY-144A(137)3R N SILVER STAR CONSTRUCTION COMPANY, INC. 2.280 MI. US-77/ RESURFACE (ASPHALT)BEGIN AT SH-74 EXTENDNORTH. $876,253.39 $0.00 01/22/2009 02/02/2009 02/19/2009 02/26/2009 07/31/2009

McCurtain CORD 070148 1914005 STP-145C(089)MS N JOB CONSTRUCTION CO., INC. 7.185 MI. GRADE, DRAIN, BRIDGE & SURFACE COUNTY ROAD BEGIN APPROX. 8.0 MI. N. & 0.2 MI. E. OF BETHEL EXTEND NORTH. $6,086,246.35 $2,163,318.53 05/17/2007 06/04/2007 06/20/2007 07/09/2007 10/01/2007 12/23/2008

McCurtain CORD 080165 2197604 BRO-145D(130)CO N HUB CONSTRUCTION, INC. 0.130 MI. CO.RD.;BRIDGE & APPROACHES;OVER YASHAU CR.,1.0MI. NORTH & 1.0 MI. W. OF BROKEN BOW. $837,374.25 $584,794.99 07/24/2008 08/12/2008 08/22/2008 08/25/2008 01/05/2009 06/13/2009

McCurtain US-70 070241 1884204 ACNHY-022N(145)GB N R. K. HALL CONSTRUCTION, LTD. 2.292 MI. GRADE, DRAIN & SURFACE US-70 BEGIN E. OF MILLERTON & EXTEND EAST TO GARVIN. $5,103,635.13 $2,411,376.17 06/14/2007 07/16/2007 08/02/2007 09/26/2007 11/05/2007 08/30/2008

McCurtain US70 070347 1886004 ACNHY-022N(105)GB N THE CUMMINS CONSTRUCTION CO., INC. 3.920 MI. US-70; GRADE,DRAIN , SURFACE & EROSION CONTROL. FROM JUST WEST OF SH-98, EXTEND EAST THROUGH MILLERTON. $9,951,247.68 $1,419,104.95 08/16/2007 09/10/2007 09/24/2007 10/02/2007 01/07/2008 11/11/2008

McIntosh US-69 080329 2414304 SSP-146N(091)SS N GLOVER & ASSOCIATES, INC. 0.00 MI. US-69/SAFETY IM- PROVEMEMT (CABLE BARRIER) BEGIN AT SH-9 JCT., EXTEND NORTH. $1,759,198.40 $1,742,294.11 08/21/2008 09/19/2008 09/30/2008 10/02/2008 11/03/2008 03/02/2009

McIntosh US-69 090072 2626304 SSR-146A(116)SR N GLOVER & ASSOCIATES, INC. 3.48 MI. US-69; RESURFACE (ASPHALT)FROM 9.82 MI. NORTH OF PITTSBURG C/L EXTEND NORTH. $1,204,438.50 $0.00 01/22/2009 02/02/2009 02/19/2009 02/26/2009 07/31/2009

Murray SH-7 090023 2334205 SSR-150C(078)SR N SEAL MASTERS, INC. 5.110 MI. SH-7; RESURFACE (ASPHALT)BEGIN 235 FEET EAST OF SH-110 JCT, EXT. EAST. $1,167,490.61 $0.00 01/22/2009 02/02/2009 02/24/2009 02/27/2009 06/30/2009

Murray US-177 060216 2026204 STPY-150B(042) N OVERLAND CORPORATION 4.867 MI. GRADE, DRAIN, SURFACE & BRIDGE US-177 FROM THE CARTER COUNTY LINE EXTEND NORTH. $3,984,823.99 $3,904,286.64 10/19/2006 11/06/2006 11/21/2006 12/07/2000 02/05/2007 09/07/2007

Murray US-177 080317 2474704 SBR-150B(072)SB N K & R BUILDERS, INC. 0.030 MI.;US-177;BRIDGE RE- HAB.; OVER ROCK CR., 0.4 MI. NORTH OF JCT. SH-7 $477,568.50 $454,062.10 07/24/2008 08/12/2008 08/27/2008 09/03/2008 12/01/2008 01/29/2009

Muskogee CO.RD. 080118 1595204 BRO-051D(423)CO N C-GAWF CONSTRUCTION, INC. 0.379 MI. CO.RD. BRIDGE & APPROACHES;ON EW-99 OVER ANDER-SON CR., 0.4 MI NO. & 2.8 MI. W. OF OKTAHA. $397,850.88 $363,535.36 02/21/2008 03/03/2008 03/14/2008 03/25/2008 07/07/2008 11/03/2008

Muskogee CO.RD. 090031 2253204 BRO-151D(147)CO N OBC, INC. 0.198 MI. CO.RD.; BRIDGE & APPROACHES/OVER AN UNNAMED CR., 3.5 MI. SOUTH & 1.8 MI. EAST OF PORUM. $257,735.23 $0.00 01/22/2009 02/02/2009 02/12/2009 02/18/2009 05/04/2009 08/01/2009

Muskogee CO.RD. 090074 1778504 BRO-151D(057)CO N BELK BRIDGE, INC. 0.207 MI. CO.RD./ BRIDGE & APPROACHES;OVER MAYNARD BAYOU,2.5 MI. SO. & 1.7 MI. EAST OF FT. GIBSON $1,049,280.55 $0.00 02/19/2009 03/02/2009 03/16/2009 03/17/2009 08/03/2009 01/29/2010

Muskogee I-40 070054 2023804 IMY-0040-6(334)276 HP N DUIT CONSTRUCTION COMPANY, INC. 5.043 MI. RESURFACE I-40 FROM MILEPOST 276.47 TO MILEPOST 283.11 (WESTBOUND ONLY). $10,194,926.33 $9,641,158.28 05/17/2007 06/04/2007 06/18/2007 07/09/2007 10/01/2007 10/24/2008

Muskogee IS-40 080466 2088504 IMY-040-6(343)276* N DUIT CONSTRUCTION COMPANY, INC. *SSP-151N(163)SS/ 5.043 MI. IS-44; RECONSTRUCT-NO ADDED LANES/SAFETY IMPROV.,FROM MI. MARKER 276.47 TO 281.66. $10,227,565.46 $869,115.83 11/20/2008 12/08/2008 12/18/2008 12/31/2008 04/06/2009 03/16/2010

Muskogee US-62 080006 2030405 BHFY-151B(171) N MUSKOGEE BRIDGE COMPANY, INC. 1.115 MI. JOINT / SEAL REPAIR US-62 OVER THE ARKANSAS RIVER NAVIGATION CHANNEL 2.14 MI. E. OF JCT. US-62 / SH-16. $3,785,680.42 $1,247,460.76 07/24/2008 08/12/2008 08/27/2008 08/28/2008 03/02/2009 10/27/2009

Muskogee US-62B 090049 2597904 STPY-151A(185)3R N GLOVER & ASSOCIATES, INC. 1.67 MI. US-62B; RESURFACE (ASPHALT)BEGIN AT US-64B & EXTEND NORTH. $829,374.00 $0.00 01/22/2009 02/02/2009 02/12/2009 02/24/2009 08/31/2009

Muskogee US-64 070189 1499410 STPY-151C(004) N DUIT CONSTRUCTION COMPANY, INC. 1.849 MI. GRADE, DRAIN, BRIDGE & SURFACE US-64 FROM 11.3 MI. S. OF SH-165 EXT. S. (5 LANE)(DIRTY CRK. & OVERFLOW). $9,168,998.59 $5,878,212.11 05/17/2007 06/04/2007 06/20/2007 07/09/2007 10/01/2007 02/11/2009

Noble CO.RD. 090032 2235104 BRO-152D(092)CO N OBC, INC. 0.226 MI. CO.RD./BRIDGE & APPROACHES;OVER RED ROCK CR., 1.0 MI. EAST & 2.5 MI. SO. OF BILLINGS. $525,586.50 $0.00 01/22/2009 02/02/2009 02/12/2009 02/18/2009 05/04/2009 09/30/2009

Noble I-35 070287 2024604 IMY-0035-4(195)199 N SHERWOOD CONSTRUCTION CO., INC. 0.512 MI. GRADE, DRAIN, SURFACE & BRIDGE I-35 OVER RED ROCK CRK. OVERFLOWS NORTH OF PERRY. $5,094,970.42 $5,643,391.38 07/19/2007 08/06/2007 08/20/2007 08/23/2007 09/24/2007 06/19/2008

Noble IS-35 090052 2603104 IMY-35-4(228)193 3R N DUIT CONSTRUCTION COMPANY, INC. 5.65 MI. IS-35;PAVEMENT REHAB.;BEGIN AT MILE MARKER 193, EXTEND NORTH TO MILE MARKER 198. $299,188.96 $0.00 01/22/2009 02/02/2009 02/10/2009 02/12/2009 06/01/2009 07/30/2009

Noble SH-15 090017 2474805 BHFY-152C(154) N KING CONSTRUCTION CO., INC. & SUBS. 0.00 MI. SH-15/BRIDGE RE- HABILITATION/OVER RED ROCK CR., 5.2 MI. EAST OF US-77. $786,916.50 $0.00 01/22/2009 02/02/2009 02/19/2009 03/05/2009 06/01/2009 08/29/2009

Noble U177 080408 2086504 BRFY-152B(054) N OBC, INC. 1.076 MI. GRADE, DRAIN, SURFACE & BRIDGE US-177 OVER BLACK BEAR CRK. & OVERFLOWS 2.1 MI. & 2.3 MI. N. OF US-64. $5,302,065.94 $1,086,227.58 09/18/2008 10/06/2008 10/20/2008 10/22/2008 02/02/2009 01/17/2010

Noble US-64 080114 2452504 SBR-152C(148)(149)SB N PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV) 0.00 MI. BRIDGE REHABILITATION US-64 LONG BRANCH CRK. 4.1 MI. E. OF US-77/OAK CRK. 7.0 MI. E. OF US-177. $2,116,589.42 $2,149,946.75 05/15/2008 06/02/2008 06/12/2008 06/30/2008 10/06/2008 01/31/2009

Noble US-77 070333 1231704 SAB-52C(194)BF/* N PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC SAB-152C(111)BF; 1.52 MI. GRD, DRN, SURF & BR US-77 RED ROCK CRK OVRFLW 1.1 MI S SH-15/SH-15 UNNAMED CRK 0.7 MI E US-77. $7,055,993.43 $5,882,719.38 07/19/2007 08/06/2007 08/17/2007 08/21/2007 12/03/2007 01/25/2009

Nowata CORD 080132 2178104 BRO-153D(31)CO* N BELK BRIDGE, INC. *STP-153C(135)CO/ 0.549 MI. CO.RD. GRADE,DRAIN,SURFACE, BRIDGE & APPROACHES;OVER OPOSSUM CR., 2.7 MI. S.OF $1,156,429.90 $1,110,660.80 02/21/2008 03/03/2008 03/17/2008 03/25/2008 06/02/2008 02/16/2009

Nowata CORD 080189 2342004 CB-153D(143) N BELK BRIDGE, INC. 0.212 MI. CO.RD.; BRIDGE & APPROACHES;OVER CA. CR. APPROX0.5 MI. SO. & 3.5 MI. W. OF US-169/SH-10 E. JCT. $537,250.93 $536,137.50 04/17/2008 04/25/2008 05/09/2008 05/16/2008 06/23/2008 11/21/2008

Okfuskee IS-40 080285 2569904 IMC-154A(122) N C-GAWF CONSTRUCTION, INC. 4.600 MI. IS-40; PAVEMENT REHABILITATION(PATCHING)BEGIN 4.6 MI. W. OF JCT. US-75/ IS-40, EXTEND EAST. $234,240.00 $224,030.15 06/19/2008 07/14/2008 08/05/2008 08/12/2008 10/06/2008 12/04/2008

Okfuskee SH-27 090073 2493004 SSR-154C(108)SR N GLOVER & ASSOCIATES, INC. 0.960 MI. SH-27;RESURFACE (ASPHALT)BEGIN AT I-40 & EX- TEND NORTH TO US-62. $596,610.56 $0.00 01/22/2009 02/02/2009 02/20/2009 02/24/2009 07/31/2009

Okfuskee SH-56 070390 2179204 BRFY-154C(073)BF N PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC 0.4924 MI. GRADE, DRAIN, SURFACE, EROSION CONTROL & BRIDGES NUYAKA CRK. BEG. 2.7 MI. W. OF OKFUSKEE/OKMULGEE C/L EXT. E. $2,833,702.29 $2,735,599.23 09/20/2007 10/08/2007 10/18/2007 10/25/2007 04/07/2008 11/02/2008

Okfuskee SH-99A 080414 2321104 STPY-154C(092) N C-GAWF CONSTRUCTION, INC. 0.0210 MI.,SH-99A; GRADE, DRAIN,SURFACE & BRIDGE. OVER AN UNNAMED CR. 0.8 MI. E. OF THE SEMINOLE CO. LINE. $367,963.00 $0.00 08/21/2008 09/19/2008 10/07/2008 10/15/2008 11/12/2008 01/25/2009

Oklahoma CO.RD. 080009 1516104 BRF-055C(881)CO N PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC 0.094 MI. GRADE, DRAIN & SURFACE CO. RD OVER UNNAMED CRK. 6.0 MI. W. OF LINCOLN C/L & 0.4 MI. S. OF LOGAN C/L. $250,410.15 $248,053.55 07/24/2008 08/12/2008 08/27/2008 08/29/2008 12/01/2008 01/29/2009

Oklahoma CORD 090076 2399804 STP-155C(597)AG N WITTWER CONSTRUCTION CO., INC. 0.374 MI. CO.RD.; BRIDGE & INTERSECTION MODIFI.;OVER SILVER CR., 1.0 MI. NO. OF US-62, IN THE CT. OF SPENCER. $1,318,826.28 $0.00 02/19/2009 03/02/2009 03/16/2009 03/18/2009 05/04/2009 10/30/2009

Oklahoma CT.ST. 060366 2112804 STP-155B(419)AG N SCHWARZ PAVING CO., INC. 2.852 MI. GRADE, DRAIN, BRIDGE & SURFACE CITY STREET ON S.W. 54TH ST. FROM MACARTHUR EXT. E. TO E. OF PORTLAND AVE. $7,833,633.14 $8,244,481.15 01/18/2007 02/06/2007 02/21/2007 03/21/2007 06/04/2007 07/07/2008

Oklahoma CT.ST. 080037 2296804 STP-155C(518)(519)AG N HASKELL LEMON CONSTRUCTION CO. 1.683 MI GRD, DRN, SURF, BR & TRAFF SIGL BRITTON RD 0.5 MI W ANDERSON RD TO HIWASSEE RD @ BRITTON & HIWASSEE RD IN JONES $1,488,529.55 $1,312,076.23 01/17/2008 02/04/2008 02/19/2008 02/29/2008 07/07/2008 11/18/2008

Oklahoma CT.ST. 080441 2336704 STP-155D(545)AG N K & R BUILDERS, INC. 0.122 MI. CT.ST./GRADE,DRAIN ,SURFACE & BRIDGE;OVER CRUTCHOCR. 0.7 MI. N. OF DEL CITY. $934,425.50 $239,154.69 09/18/2008 10/06/2008 10/21/2008 10/29/2008 02/02/2009 07/11/2009

Oklahoma CT.ST. 070440 2202404 STP-155D(458)AG N PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC 0.549 MI. BRIDGE & APPROACHES CITY ST. (TRIPLE X RD.) OVER N. CANADIAN RVR. 2.3 MI. E. & 1.5 MI. N. OF CHOCTAW. $3,648,873.55 $3,656,467.30 01/17/2008 02/04/2008 02/11/2008 02/15/2008 06/02/2008 01/07/2009

Oklahoma CT.ST. 090027 2113004 STPG-155F(421)AG N TRAFFIC SIGNALS, INC. 0.00 MI. CT.ST.; SAFETY IM- PROVEMENT(SCHOOL ZONE)AT MUL- TIPLE LOCATIONS IN CLEVE- LAND & OKLA. COUNTIES. $354,426.70 $0.00 01/22/2009 02/02/2009 02/20/2009 02/25/2009 04/01/2009 07/29/2009

Oklahoma CTST 060214 2105104 STP-155B(417)AG N HASKELL LEMON CONSTRUCTION CO. 0.895 MI. GRADE, DRAIN, SURFACE & SIGNAL; 33RD ST. BETWEEN SANTA FE & KELLY AVES. IN EDMOND. $4,072,076.60 $4,119,483.61 07/20/2006 08/07/2006 08/23/2006 09/12/2006 12/04/2006 07/31/2007

Oklahoma CTST 080008 2232204 STP-155A(485)AG N DOBSON BROTHERS CONSTRUCTION CO. 1.256 MI GRD, DRN, SURF, BR & SIG NW 178TH ST BEG W OF PENN AVE & EXT E/PENN AVE & WESTERN AVE BEG S OF 178TH ST & EXT N $5,508,027.20 $3,752,849.19 03/20/2008 04/07/2008 04/18/2008 05/01/2008 08/04/2008 05/30/2009

Oklahoma CTST 080168 2047404 STP-155C(387)AG N SHERWOOD CONSTRUCTION CO., INC. 0.843 KM GRADE, DRAIN, SURFACE & BRIDGE COVELL RD-THOMAS DR TO BROADWAY / BOULEVARD-N OF COVELL & EXTEND N. $6,096,878.98 $2,479,913.73 03/20/2008 04/07/2008 04/16/2008 04/25/2008 08/04/2008 08/18/2009

Oklahoma I-240 080233 2557504 IMY-0240-1(354)004MS N AUSTIN PAVING LLC 0.219 MI. GRADE & SURFACE I-240 SOUTHBOUND ON RAMP FROM I-240 TO S.W. 82ND ST. (I-35 / I-240 INTERCHANGE). $395,200.00 $100,140.01 07/24/2008 08/12/2008 08/27/2008 09/04/2008 10/13/2008 01/10/2009

Oklahoma I-40 070139 1742821 OKCY-XTWN(002)HP N MUSKOGEE BRIDGE COMPANY, INC. 0.00 MI. GRADE, DRAIN, RAILROAD & BRIDGE I-40 CROSSTOWN FOR BNSF RED ROCK & COTTON SEED MILL LOOP IN OKLAHOMA CITY. $14,585,639.25 $13,272,781.01 04/26/2007 05/07/2007 05/18/2007 06/18/2007 07/16/2007 08/23/2008

Oklahoma I-40 070213 2408104 SSP-155N(604)SS N MIDSTATE TRAFFIC CONTROL, INC. SAFETY IMPROVEMENT (CABLE BARRIER PROJECT) I-40 BEGIN AT AVE. A IN MIDWEST CITY & EXTEND E. TO POTTAWATOMIE COUNTY LINE. $1,298,635.90 $1,285,982.35 06/14/2007 07/16/2007 07/30/2007 08/07/2007 09/03/2007 12/31/2007

Oklahoma I-40 070353 1742856 OKCY-XTWN-0(044)000TI N MUSKOGEE BRIDGE COMPANY, INC. 0.369 MI. GRADE, DRAIN, BRIDGE & RAILROAD I-40 FROM CANAL BRIDGE W. 0.4 MI./LEE ST. DRNG. STR./N. BOUND SHIELDS BR. $15,399,884.75 $12,752,406.80 10/18/2007 11/05/2007 11/14/2007 11/21/2007 01/07/2008

Oklahoma IS-35 090013 2543604 SSR-155N(645)SR N SHELL CONSTRUCTION CO., INC. 0.340 MI. IS-35; GRADING & SURFACING/I-35 RAMPS;AT WATER -LOO ROAD. $229,258.60 $0.00 01/22/2009 02/02/2009 02/19/2009 02/27/2009 06/01/2009 07/30/2009

Oklahoma IS-35 090095 2617904 SSR-155N(697)SR N HASKELL LEMON CONSTRUCTION CO. 4.670 MI. IS-35/RESURFACE (ASPHALT)FROM SH-66(2ND ST.) EXTEND NORTH IN THE CITY OF EDMOND. $1,556,747.00 $0.00 01/22/2009 02/02/2009 02/11/2009 02/12/2009 09/29/2009 09/30/2009

Oklahoma IS-40 020183 1969304 IMY-NBIP(281) N J & N INTERNATIONAL COATINGS, INC. 0.00 M. BRIDGE PAINTING I-40: OVER NORTH CANADIAN RIVER IN WEST OKC. $378,000.00 $341,700.00 05/23/2002 06/03/2002 06/19/2002 06/26/2002 09/09/2002 01/10/2003

Oklahoma IS-40 070323 1742829 OKCY-XTWN(010)TI N MUSKOGEE BRIDGE COMPANY, INC. 0.72 MI. GRADE, DRAIN & BRIDGE I-40 CROSSTOWN BEGIN AT AGNEW AVE. & EXTEND EAST. $23,824,644.74 $21,376,614.26 09/20/2007 10/08/2007 10/24/2007 10/25/2007 11/19/2007

Oklahoma IS-40 070439 2163404 ITSY-QT20(035)IT N TRAFFIC & LIGHTING SYSTEMS, LLC 0.00 MI. SAFETY IMPROVEMENTS (ROAD WEATHER INFORMATION SYSTEM) VARIOUS LOCATIONS I-40 & I-35. $602,658.29 $389,201.24 11/15/2007 12/03/2007 12/17/2007 01/04/2008 04/05/2008 09/01/2008

Oklahoma IS-40 080112 1742867 OKCY-XTWN(056)HP N M & M WRECKING, INC. 0.00 MI. IS-40;RIGHT-OF-WAY CLEARANCE CONTRACT. MULTIPLE LOCATIONS ALONG IS-40 IN OKLA. CITY. $408,094.00 $363,203.66 01/17/2008 02/04/2008 02/19/2008 02/28/2008 03/24/2008 03/23/2009

Oklahoma IS-40 080120 1742826 OKCY-XTWN(007)TI/OKCY-XT* N SHERWOOD CONSTRUCTION CO., INC. *WN(008)HP/2.649 MI. GRADE, DRAIN SURFACE, BRIDGE & RAILROAD I-40 E. OF PENN. AVE. EXT. E. / FROM SHARTEL AVE. EXT. W. $40,574,036.60 $14,874,781.15 08/21/2008 09/19/2008 10/03/2008 10/13/2008 11/17/2008

Oklahoma IS-40 080121 1742866 OKCY-XTWN(055)SG N OBC, INC. 0.804 MI. GRADE, DRAIN, SURFACING & BRIDGE I-40 FROM WEST OF MAY AVENUE & EXTEND EAST. $6,480,201.78 $6,854,271.84 05/15/2008 06/02/2008 06/19/2008 06/27/2008 08/04/2008 04/25/2009

Oklahoma IS-40 080305 2570604 IMC-155A(665) N C-P INTEGRATED SERVICES, INC. 7.36 MI.;IS-40/RESURFACE (CONCRETE PATCHING)BEGIN AT MM 165.6, EXTEND EAST. $806,017.60 $687,839.69 07/24/2008 08/12/2008 08/29/2008 09/18/2008 10/06/2008 01/03/2009

Oklahoma IS-44 080360 2500004 IMG-0035-3(297)138 TR* N MIDSTATE TRAFFIC CONTROL, INC. *SAP-141A(201)/IMG-044-2 (471)223 TR; 0.00 MI. IS-44, SAFETY IMPROVEMENT(MESSAGE SIGN)LOCATIONS DIV. 3,4,5. $1,837,942.75 $260,193.76 11/20/2008 12/08/2008 12/24/2008 12/31/2008 01/26/2009 07/19/2010

Oklahoma IS-44 090053 2603204 IMY-44-1(111)123 3R N PENHALL COMPANY 2.90 MI. IS-44; PAVEMENT RE -HABILITATION/ BEGIN @ N.W. 10TH ST. & EXTEND NORTH. $2,852,911.00 $0.00 01/22/2009 02/02/2009 02/18/2009 02/24/2009 06/01/2009 08/29/2009

Oklahoma SH-15 080341 2097504 BPMY-NBIP(405)3B N TARPON INDUSTRIAL, INC. 0.00 MI.;SH-74/SH-15/NW 10TH ST.; AT VARIOUS LOCATIONS IN DIV. IV. $683,130.00 $95,400.00 09/18/2008 10/06/2008 10/23/2008 11/07/2008 02/02/2009 05/02/2009

Oklahoma SH-74 070391 0198104 BRFY-055C(657)BF* N DOBSON BROTHERS CONSTRUCTION CO. *STPY-155C(538)HP/2.272 MI. GRADE, DRAIN, SURFACE & BRIDGE SH-74 BEG. 0.2 MI. N. OF 206TH ST. (COVELL RD.) EXT. N. $16,425,711.62 $16,732,825.64 09/20/2007 10/08/2007 10/22/2007 10/26/2007 02/04/2008 05/23/2009

Oklahoma US-77 080093 1727104 NHY-024N(004) N ALLEN CONTRACTING, INC./MUSKOGEE BRIDGE CO., INC. (J V) 1.506 KM GRADE, DRAIN, SURFACE & BRIDGE US-77 (BROADWAY EXTENSION) AT MEMORIAL ROAD INTERCHANGE. $27,947,058.47 $15,350,001.65 02/21/2008 03/03/2008 03/17/2008 03/27/2008 07/07/2008 12/28/2009

Oklahoma US-77 090096 2618004 SSR-155A(698)SR N SILVER STAR CONSTRUCTION COMPANY, INC. 2.090 MI. US-77; RESURFACE (ASPHALT)FROM 33RD ST. NORTH TO 2ND STREET IN EDMOND. $980,482.40 $0.00 01/22/2009 02/02/2009 02/19/2009 02/27/2009 07/01/2009 09/28/2009

Okmulgee CO.RD. 090139 2104004 BRO-156D(088)CO N BRIDGECO CONTRACTORS, INC. 0.35 MI. CO.RD.;BRIDGE & APPROACHES;OVER SALT CR., 0.9 MI. NO. & 2.3 MI. WEST OF BEGGS. $473,916.61 $0.00 02/19/2009 03/02/2009 03/16/2009 03/17/2009 06/01/2009 09/28/2009

Okmulgee SH-16 080267 2090304 BRFY-156C(078) N WITTWER CONSTRUCTION CO., INC. 0.123 MI.SH-16; BRIDGE & APPROACHES;OVER TIGER CR., 3.0MI. EAST OF THE CREEK COUNTY LINE. $2,167,380.61 $1,553,450.48 08/21/2008 09/19/2008 10/07/2008 01/05/2009

Okmulgee US-266 080151 2452804 SBR-156B(140)SB N PBX CORPORATION 0.00 MI. US-266;BRIDGE RE- HAB.; OVER COAL CR. APPROX. 0.6 MI. E. OF US-62. $601,511.50 $576,057.72 03/20/2008 04/07/2008 04/18/2008 05/01/2008 08/04/2008 12/01/2008

Okmulgee US-75 080331 2415204 NHG-014N(068)TR N ACTION SAFETY SUPPLY CO. S0.00 MI. US-75;SAFETY IM- PROVEMENT(CABLE BARRIER) BE- GIN AT DUCK CR.(251ST ST.), EXTEND NORTH. $912,636.80 $154,157.90 08/21/2008 09/19/2008 10/02/2008 10/07/2008 01/15/2009

Osage SH-99 080368 2598704 HSIPY-157B(156)TR N MIDSTATE TRAFFIC CONTROL, INC. 0.00 MI. SH-99; TRAFFIC SIGNALS(SCHOOL ZONE); AT HOMINY HIGH SCHOOL, IN THE CITY OF HOMINY. $21,260.95 $0.00 11/20/2008 12/08/2008 12/23/2008 12/31/2008 03/30/2009 04/28/2009

Osage US-60 050434 1623004 BRFY-18N(10)/NHY-18N(36) N M.J. LEE CONSTRUCTION COMPANY 1.671 MI. GRADE, DRAIN, SURFACE & BRIDGE US-60 BEGIN 5.1 MI. W. OF WASHINGTON COUNTY LINE & EXTEND EAST. $4,345,664.39 $4,134,162.14 07/21/2005 08/01/2005 08/12/2005 09/12/2005 02/27/2006 02/26/2007

Osage US-60 080347 2028904 TI-018N(030)TI N VENTURE CORPORATION DBA V. C. O. PAVING 1.46 MI. US-60;GRADE,DRAIN, SURFACE & BRIDGE;FROM JCT SH- 99, EXTEND EAST. $5,776,867.15 $1,122,779.19 08/21/2008 09/19/2008 10/03/2008 10/30/2008 01/05/2009 08/02/2009

Ottawa CO.RD. 090033 2289604 CIRB-158D(101)RB N M.J. LEE CONSTRUCTION COMPANY 0.264 MI. CO.RD.; BRIDGE & APPROACHES;OVER NEOSHO RIVER, 3.4 MI. NO. & 2.0 MI. EAST OF THE SH-125/US-60 JCT. $4,175,684.50 $0.00 01/22/2009 02/02/2009 02/18/2009 02/25/2009 07/06/2009 04/01/2010

Pawnee US-64 070317 2408604 STPG-159A(069)SS/* N ACTION SAFETY SUPPLY CO. *NHG-019N(107)(108)SS; 0.00 MI. CABLE BARRIER PROJECT US-64/US-412 BEGIN AT SH-48 EXTEND E. TO I-244 IN TULSA. $2,920,742.77 $1,998,773.74 07/19/2007 08/06/2007 08/21/2007 08/30/2007 10/03/2007 02/29/2008

Payne IS-35 080300 2330605 BRFY-160C(187) N GARY A. CRAIN, INC. 0.00 MI. BRIDGE WATERPROOF SEAL I-35/I-40/SH-11/SH-33/SH-51 VARIOUS LOCATIONS IN DIVISION 4. $164,870.00 $0.00 06/19/2008 07/14/2008 08/05/2008 08/12/2008 11/03/2008 01/31/2009

Payne SH-33 080073 0635111 STPY-160B(188)HP N ARK WRECKING OF OK., INC. 0.00 MI.SH-33; RIGHT-OF-WAY CLEARANCE; FROM NEW ALIGNMENT OVER THE CIMARRON RIVER, EXTEND EAST. $98,400.00 $72,176.00 08/21/2008 09/19/2008 10/02/2008 10/07/2008 11/12/2008 05/10/2009

Payne SH-33 080163 2452904 SBR-160B(172)SB N PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV) 0.00 MI. BRIDGE REHABILITATION SH-33 OVER LOST CREEK APPROX. 1.5 MI. E. OF US-177 SOUTH. $825,141.55 $601,756.57 05/15/2008 06/02/2008 06/12/2008 06/27/2008 10/06/2008 01/03/2009

Payne SH33 080126 2488804 SSR-160B(178)SR N THE QUAPAW COMPANY 5.83 MI. RESURFACE (OVERLAY SH-33 BEGIN APPROX. 2.0 MI. E. OF SH-18 IN CUSHING & EXTEND E. (EASTBOUND LANES ONLY). $779,556.05 $774,634.42 02/21/2008 03/03/2008 03/12/2008 03/24/2008 07/07/2008 10/04/2008

Pittsburg CO.RD. 090034 2077904 BRF-161C(118)CO N OBC, INC. 0.245 MI. CO.RD.;BRIDGE & APPROACHES;OVER MCALESTER LAKESPILLWAY, 5.6 MI. NO. & 2.0 MI. WEST OF MCALESTER. $703,535.49 $0.00 01/22/2009 02/02/2009 02/12/2009 02/18/2009 06/01/2009 12/07/2009

Pittsburg SH-144 080349 2578105 BPMY-164C(139)3B N LOGOS CONSTRUCTION COMPANY 0.00 MI. SH-144/US-270/US-59 ;JOINT SEAL/REPAIR AT VARIOUS LOCATIONS IN DIV. II $185,690.00 $122,771.63 08/21/2008 09/19/2008 10/07/2008 10/15/2008 01/05/2009 02/18/2009

Pittsburg SH-31 080013 2319504 BRFY-161C(182)(181)(183) N PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC 0.878 MI. BRIDGE & APPRS SH-31 DEER CRK 13.9 MI E SH-31A; UNNAMED CRK 15.2 MI E SH-31A; & UNNAMED CRK 16.9 MI E SH-31A $3,394,460.80 $3,180,692.88 01/17/2008 02/04/2008 02/11/2008 02/19/2008 06/02/2008 03/28/2009

Pittsburg US-69 060363 1499804 NHY-013N(014) N TTK CONSTRUCTION CO., INC. 0.285 MI. GRADE, DRAIN, SURFACE & BRIDGE US-69 @ HEREFORD LANE INTERCHANGE IN MCALESTER. $7,211,981.84 $7,263,531.88 10/19/2006 11/06/2006 11/21/2006 12/11/2006 03/05/2007 02/27/2008

Pittsburg US-69 070291 2284504 NHY-013N(104)HP N THE CUMMINS CONSTRUCTION CO., INC. 2.101 MI. GRADE, DRAIN, BRIDGE & SURFACE US-69 S. END SAFETY IMPRVMNTS. INDIAN NATION TRNPK. INTRCHG. TO AIRPORT RD. $3,552,742.39 $2,268,232.34 07/19/2007 08/06/2007 08/24/2007 08/30/2007 12/03/2007 08/23/2008

Pottawatomie CO.RD. 090069 2511504 ERSTP-163C(223)ER N CCC CONSTRUCTION, INC. 0.00 MI. CO.,RD.; BANK PRO- TECTION/ RIP RAP;OVER NORTH CANADIAN RIVER, 2 MI. NORTH OF I-40. $58,633.50 $0.00 01/22/2009 02/02/2009 02/18/2009 02/27/2009 03/23/2009 05/21/2009

Pottawatomie CO.RD. 090159 1969504 BRF-163C(105) CO N SEWELL BROTHERS, INC. 0.075 MI. CO.RD.;BRIDGE & APPROACHES;OVER AN UNNAMED CR., 1.0 MI. NO. & 0.2 MI. EAST OF BETHEL ACRES. $624,890.70 $0.00 02/19/2009 03/02/2009 03/10/2009 03/12/2009 04/13/2009 08/10/2009

Pottawatomie I-40 070247 2409104 IMG-0040-5(397)173 N MIDSTATE TRAFFIC CONTROL, INC. SAFETY IMPROVEMENT (CABLE BARRIER PROJECT) I-40 BEGIN AT THE OKLAHOMA/POTTAWATOMIE COUNTY LINE & EXTEND E. TO SH-18 JCT. $965,872.75 $781,413.05 06/14/2007 07/16/2007 08/02/2007 08/10/2007 09/04/2007

Pottawatomie I-40 080166 2409105 IMY-0040-5(403)185TR N HASKELL LEMON CONSTRUCTION CO. 2.064 MI. GRD, DRN, SURF, STRP, & LIGHT BEG 0.4 MI W SH-3E (KICKAPOO AVE) EXT E TO 1.2 MI E SH-18 (HARRISION AVE). $4,444,270.51 $4,600,947.72 03/20/2008 04/07/2008 04/18/2008 05/02/2008 08/04/2008 03/11/2009

Pottawatomie I-40 070357 2100204 BRIY-40-5(387)180 N ALLEN CONTRACTING, INC. 0.530 MI. BRIDGE & APPROACHES I-40 OVER NORTH CANADIAN OVER FLOW 6.1 MI. E. OF OKLAHOMA COUNTY LINE. $7,778,240.30 $7,840,313.64 10/18/2007 11/05/2007 11/20/2007 11/28/2007 02/04/2008 10/30/2008

Pottawatomie SH-9 090084 2463004 STPY-163C(219)3R N HASKELL LEMON CONSTRUCTION CO. 1.840 MI. SH-9;RESURFACE (ASPHALT)FROM 1.84 MI. WEST OFUS-177 EXTEND EAST IN TECUMSEH. $459,467.50 $0.00 01/22/2009 02/02/2009 02/11/2009 02/12/2009 07/30/2009 07/31/2009

Pottawatomie US-177 090006 2588104 HSIPY-163B(324)TR N TRAFFIC SIGNALS, INC. 0.00 MI. US-177;TRAFFIC SIGNALS:AT THE INTERSECTION OFUS-177 AND BENSON PARK RD. IN TECUMSEH. $111,343.91 $0.00 01/22/2009 02/02/2009 02/19/2009 02/27/2009 05/30/2009 08/27/2009

Pushmataha US-270 090007 2091904 BRFY-164F(142) N PARADIGM CONSTRUCTION & ENGINEERING, INC 0.00 MI. US-270;JOINT SEAL/ REPAIR. SH-31/SH-109/US-270/ US-271; AT VARIOUS LO- CATIONS IN DIV. II. $217,686.69 $0.00 01/22/2009 02/02/2009 02/18/2009 02/25/2009 03/16/2009 08/12/2009

Pushmataha US-270 090008 2091905 BRFY-NBIP(407) N SEMINOLE EQUIPMENT, INC. 0.00 MI.;US-270/US-271/US- 70. BRIDGE PAINTING/SH-109;AT VARIOUS LOCATIONS IN DIV. II. $595,070.00 $0.00 01/22/2009 02/02/2009 02/20/2009 03/06/2009 06/01/2009 08/29/2009

Pushmataha US-271 080197 2101704 BRFY-164B(062)HP N L&N BRIDGE, LLC 0.59 MI. US-271;BRIDGE & APPROACHES;OVER BIG CEDAR CR.,NORTHEAST OF FINLEY. $3,379,750.26 $792,522.65 07/24/2008 08/12/2008 08/27/2008 09/03/2008 12/01/2008 08/07/2009

Roger Mills SH-33 080375 2081204 BRFY-165C(044) N SEWELL BROTHERS, INC. 0.813 MI. SH-33; BRIDGE & APPROACHES/ OVER THE WASHITA RIVER, 5.4 MI. EAST OF US- 283. $5,365,966.00 $3,494,142.27 10/16/2008 11/03/2008 11/13/2008 11/20/2008 01/05/2009 06/13/2009

Rogers CTST 080237 2268604 STP-166D(170)UR N KLAVER CONSTRUCTION COMPANY, INC. 0.048 MI. CT.ST.; GRADE, DRAIN,SURFACE & BRIDGE;OVER CAT CR. TRIBUTARY, 0.6 MI. NO. OF BLUE STAR DRIVE. $319,486.30 $266,545.37 06/19/2008 07/14/2008 07/25/2008 08/18/2008 10/06/2008 01/03/2009

Rogers I-44 090100 2613304 SSR-166N(228)SR* N BECCO CONTRACTORS, INC. */SSR-172N(447)SR /2.910 MI. RESURFACE(ASPHALT)FROM I-244, EXTEND EAST. $1,023,576.00 $0.00 01/22/2009 02/02/2009 02/11/2009 02/12/2009 06/01/2009 07/30/2009

Rogers SH-88 050537 1888704 STPY-166C(71) N WITTWER CONSTRUCTION CO., INC. 3.49 MI. GRADE, DRAIN, SURFACE & BRIDGE SH-88 BEGIN @ US-412 & EXTEND NORTH. $11,449,145.00 $11,059,176.57 06/15/2006 07/10/2006 07/27/2006 10/04/2006 11/06/2006 12/10/2007

Seminole CORD 080453 2261104 BRO-167D(114)CO N OBC, INC. 0.245 MI. BRIDGE & APPROACHES COUNTY RD. OVER WEWOKA CRK. 5.0 MI. E. & 1.9 MI. N. OF BOWLEGS. $787,811.17 $166,438.33 10/16/2008 11/03/2008 11/13/2008 11/19/2008 03/02/2009 07/29/2009

Seminole IS-40 090019 2612204 IMC-167A(163) N CP3 ENTERPRISES, INC. 5.500 MI.; IS-40/CONCRETE PATCHING; BEGIN 7.5 MI. EAST OF JCT US-377, EXT. EAST. $126,201.07 $0.00 01/22/2009 03/02/2009 03/16/2009 03/17/2009 06/01/2009 07/30/2009

Seminole SH-56 080415 2321304 STPY-167C(129) N C-GAWF CONSTRUCTION, INC. 0.072 MI. SH-56; GRADE, DRAIN,SURFACE & BRIDGE; OVER A UNNAMED CR., 1.0 MI. SO. OF US-270. $685,366.90 $449,547.90 08/21/2008 09/19/2008 10/07/2008 10/15/2008 01/05/2009 03/25/2009

Seminole SH-56 090085 2584004 STPY-167C(158)3R N THE CUMMINS CONSTRUCTION CO., INC. 5.20 MI. SH-56;RESURFACE (ASPHALT) BEGIN AT US-270B IN WEWOKA AND EXTEND NORTH. $1,089,078.00 $0.00 01/22/2009 02/02/2009 02/18/2009 02/24/2009 07/31/2009

Seminole SH-99 070445 1302004 NHY-012N(019) N THE CUMMINS CONSTRUCTION CO., INC. 8.665 KM GRADE, DRAIN & SURFACING SH-99 BEGIN N. OF I-40 & EXTEND N. TO PRAGUE. $11,884,548.98 $3,136,043.65 11/15/2007 12/03/2007 12/17/2007 12/31/2007 04/07/2008 06/30/2009

Seminole SH-9A 080423 1020804 BRFY-067C(210)HP N THE CUMMINS CONSTRUCTION CO., INC. 1.68 MI. GRADE, DRAIN, SURFACE & BRIDGE SH-9A OVER BRUNO CRK. & SALT CRK. 3.4 MI. S. OF MAUD. $7,688,706.80 $394,902.70 09/18/2008 10/06/2008 10/23/2008 10/29/2008 02/02/2009 10/09/2009

Sequoyah CORD 070119 2074304 BRO-168D(116)CO N PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC 0.122 MI. BRIDGE & APPROACHES ON COUNTY RD. APPROX. 2.9 MI. E. & 0.7 MI. N. OF LIBERTY. $251,248.75 $261,272.60 03/15/2007 04/02/2007 04/10/2007 04/17/2007 08/06/2007 11/03/2007

Sequoyah CORD 080194 1941204 BRO-168D(097)CO N OBC, INC. 0.215 MI. CO.RD.;BRIDGE & APPROACHES, ON EW-104, 0.1 MI.WEST OF US-59.SH-101 JCT. $521,238.29 $503,953.24 04/17/2008 04/25/2008 05/05/2008 05/09/2008 09/08/2008 01/05/2009

Sequoyah I-40 070217 2410604 SSP-168N(174)SS N FULSOM CONSTRUCTION COMPANY, INC. 0.00 MI. I-40 SAFETY IMPRO- VEMENT (CABLE BARRIER) BEGIN FROM ILE POST 311 AND EX- TEND NORTH TO MILE POST 318. $701,271.50 $626,298.71 06/14/2007 07/16/2007 07/27/2007 08/07/2007 09/04/2007 12/02/2007

Sequoyah I-40 070250 2410605 IMG-0040-6(352)318 TR N FULSOM CONSTRUCTION COMPANY, INC. 0.00 MI. I-40;SAFETY IMPRO- VEMENT(CABLE BARRIER PROJ.) FROM MILE POST 3189.5 TO MILE POST 322. $378,008.75 $364,957.85 06/14/2007 07/16/2007 07/27/2007 08/09/2007 09/03/2007 10/17/2007

Sequoyah IS-40 080232 2439405 BPMY-NBIP(389)3B N POSEDION CONSTRUCTION, INC. 0.00 MI. IS-40;BRIDGE PAINT -ING;US-75B/SH-10;AT VARIOUS LOCATIONS IN DIV. 1. $332,815.00 $238,155.00 05/15/2008 06/02/2008 06/16/2008 08/15/2008 10/06/2008 01/03/2009

Sequoyah SH-101 070304 2174104 BRFY-168C(134)BF N MUSKOGEE BRIDGE COMPANY, INC. 0.258 MI. BRIDGE & APPROACHES SH-101 OVER LITTLE SALLISAW CRK. & TRIBUTARY 3.4 & 3.9 MI. E. OF JCT. US-59. $1,753,431.60 $1,678,449.64 07/19/2007 08/06/2007 08/20/2007 08/23/2007 12/03/2007 04/30/2008

Sequoyah US-59 050641 1767004 ACNHY-033N(011)GB N SHERWOOD CONSTRUCTION CO., INC. 2.803 MI. GRADE & DRAIN US-59 FROM 2.7 MI. S. OF I-40 EXTEND SOUTH. $14,250,383.10 $13,894,899.23 08/17/2006 09/11/2006 09/28/2006 10/11/2006 01/08/2007 01/04/2008

Sequoyah US-59 080139 1767005 NHY-033N(012) N DUIT CONSTRUCTION COMPANY, INC. 2.968 MI. US-59;SURFACE; BEGIN 2.7 MI. SO. OF I-40,EX- TEND SOUTH. $7,688,456.48 $6,340,944.44 03/20/2008 04/07/2008 04/16/2008 04/25/2008 08/04/2008 04/05/2009

Sequoyah US-59 080333 2578804 SSR-168N(192)SR N DUIT CONSTRUCTION COMPANY, INC. 1.610 MI.;US-59/RESURFACE (CONCRETE), 0.9 MI. NO. OF THEARKANSAS RIVER, EXTEND NO. (NORTHBOUND LANES ONLY). $1,516,308.64 $1,486,677.85 07/24/2008 08/12/2008 08/15/2008 08/18/2008 09/08/2008 10/07/2008

Sequoyah US-59 050224 1695204 ACSTPY-168A(023)GB N GLOVER CONSTRUCTION CO., INC. 1.70 MI. GRADE, DRAIN & SURFACE US-59 FROM THE ARKANSAS RVR. EXTEND N. TO THE SH-141 JCT. IN SEQUOYAH CO. $5,289,626.58 $6,626,926.50 08/18/2005 09/06/2005 09/22/2005 10/12/2005 01/02/2006 01/01/2007

Sequoyah US-59 090009 2592604 CIP-168N(193)IP N JOB CONSTRUCTION CO., INC. 2.61 MI. US-59/RESURFACE (ASPHALT)BEGIN AT THE NORTH END OF THE ARKANSAS RIVER BRIDGE & EXTEND NORTH. $1,213,982.60 $0.00 01/22/2009 02/02/2009 02/18/2009 02/25/2009 03/30/2009 05/13/2009

Stephens CO.RD. 080363 2392604 CR-169C(127) N K & R BUILDERS, INC. 0.359 MI. CO.RD.; GRADE, DRAIN & SURFACE; AT NS-279/EW-168, 3.0 MI. WEST & 1.0 MI. SOUTH OF US-81/SH-7. $419,392.54 $41,426.16 11/20/2008 12/08/2008 12/23/2008 01/02/2009 03/02/2009 05/30/2009

Stephens CT.ST. 080371 2298004 STP-169B(117)UR* N T & G CONSTRUCTION, INC. *SSP-169A(129)SS/ 1.20 MI. CT.ST.; GRADE,DRAIN,SURFACE TRAFFIC SIGNALS;FROM THE DUNCAN BYPASS TO CHISHOLM TRAI $2,724,129.58 $0.00 11/20/2008 12/08/2008 12/19/2008 12/31/2008 04/06/2009 12/01/2009

Stephens SH-7 060395 2347104 SBR-169N(121)SB N BRUTON CONSTRUCTION CO., INC. 0.00 MI. BRIDGE REPAIR SH-7 LITTLE BEAVER CRK, O'FLOW LITTLE BEAVER CRK & HELL CRK APPROX 5.4 MI E OF COMANCHE CO. LINE. $799,504.12 $781,072.15 11/16/2006 12/04/2006 12/21/2006 01/05/2007 04/02/2007 12/07/2007

Stephens SH-7 090055 2581304 NHY-021N(049)3R N T & G CONSTRUCTION, INC. 4.700 MI. SH-7;RESURFACE( ASPHALT), BEGIN 4.9 MI. E. OF COMANCHE COUNTY LINE, EX- TEND EAST,(WESTBOUND LANES) $1,570,789.40 $0.00 01/22/2009 02/02/2009 02/20/2009 02/26/2009 07/31/2009

Stephens US-81 080248 2031614 NHY-021N(042)(48)HP N T & G CONSTRUCTION, INC. 1.11 MI. GRADE, DRAIN & SURFACE US-81 (DUNCAN BYPASS) INTERCHANGE RAMPS AT BEECH AVE. $2,894,964.71 $1,953,555.69 05/15/2008 06/02/2008 06/12/2008 06/30/2008 10/06/2008 05/23/2009

Stephens US-81 080288 2463204 SSR-169A(143)SR N T & G CONSTRUCTION, INC. 4.080 MI. US-81 RESURFACE (ASPHALT);BEGIN AT NORTHERN JCT. OF US-81/SH-7 & EX- TEND SOUTH. $946,172.50 $815,115.47 06/19/2008 07/14/2008 07/29/2008 07/31/2008 09/08/2008

Texas CORD 090089 2402204 BRF-170C(121)CO N BEHNE CONSTRUCTION CO., INC. 0.169 MI. CO.RD.; BRIDGE & APPROACHES/ OVER PONY CR.,0.6 MI. WEST & 3.4 MI. NO. OF OPTIMA. $699,957.88 $0.00 02/19/2009 03/02/2009

Texas SH-136 090020 2581504 SSR-170C(146)SR* N HIGHWAY CONTRACTORS, INC. *SSR-170N(147)SR/ 11.500 MI. SH-136; RESURFACE(ASPHALT) BEGIN 4.0 MI. NO. OF THE TEXAS S/L, EXT. NORTH. $1,498,270.00 $0.00 01/22/2009 02/02/2009 02/18/2009 02/24/2009 07/31/2009

Texas SH95 080198 2172508 STPY-170A(122) N L & M CONTRACTORS, INC. 0.222 MI. GRADE, DRAIN, SURFACE & BRIDGE SH-95 OVER TEEPEE CRK. APPROX. 3.2 MI. S. OF US-64. $1,953,777.40 $1,412,123.11 04/17/2008 04/25/2008 05/09/2008 07/15/2008 09/08/2008 04/05/2009

Texas US-54 080128 2493504 NHY-008N(075)(76)3R N J & R SAND COMPANY, INC. 9.5 MI. RESURF (OVRLAY) US-54 BEG APPROX 4.82 MI NE US-64 EXT NE/US-54 BEG APPROX 8.82 MI NE US-64 EXT NE. $2,941,908.90 $1,940,995.05 02/21/2008 03/03/2008 03/12/2008 03/27/2008 07/07/2008 10/13/2008

Texas US-54 080238 2031204 NHY-008N(047) N J & R SAND COMPANY, INC. 3.049 MI. US-54;GRADE,DRAIN & EROSION CONTROL/0.5 MI. N.E.OF US-64, EXTEND NORTHEAST. $1,159,399.23 $649,534.87 06/19/2008 07/14/2008 07/23/2008 07/29/2008 11/03/2008 02/20/2009

Texas US-54 080350 2083904 NHY-008N(050) N J & R SAND COMPANY, INC. 0.890 MI.;US-54:FROM 0.80 MI. SO. OF US-64 IN HOOKER, EXTEND NORTH. $5,346,047.78 $100,741.50 11/20/2008 12/08/2008 12/18/2008 01/16/2009 04/06/2009 03/01/2010

Texas US-54 090037 1497105 NHY-008N(007) N DONDLINGER & SONS CONSTRUCTION CO., INC. 4.92 MI. US-54;GRADE,DRAIN & EROSION CONTROL;5.0 MI. NO. OF OPTIMA,EXTEND NO. TO 1. 25 MI. SO. OF US-64. $1,968,120.13 $0.00 02/19/2009 03/02/2009

Texas US-64 090090 2564304 STPY-170B(143)(144)3R N J & R SAND COMPANY, INC. 10.00 MI. US-64; RESURFACE (ASPHALT)BEGIN 3.0 MI. EAST OFSH-95N AND EXTEND EAST. $2,768,775.80 $0.00 01/22/2009 02/02/2009 02/12/2009 02/18/2009 07/31/2009

Tillman US-183 090058 2604004 STPY-171B(129)3R N DOBSON BROTHERS CONSTRUCTION CO. 7.5 MI. US-183;RESURFACE (ASPHALT)BEGIN AT NORTH END OFRED RIVER BRIDGE, EXTEND NORTH. $1,827,348.85 $0.00 01/22/2009 02/02/2009 02/12/2009 02/23/2009 05/31/2009

Tillman US-183 090059 2611704 SSP-171B(130)SS N APAC-OKLAHOMA, INC. 0.840 MI.US-183 WIDEN & RESURFACE. BEGIN 9.7 MI. NORTHOF US-70, EXTEND NORTH. $1,482,420.27 $0.00 01/22/2009 02/02/2009 02/18/2009 02/25/2009 09/01/2009

Tulsa CO.RD. 080455 2409504 BRF-172C(350)CO N WITTWER CONSTRUCTION CO., INC. 0.085 MI. CO.RD./ BRIDGE & APPROACHES;OVER MUD CREEK, 2.5MI. EAST & 0.8 MI. SOUTH OF THE SH-51/SH-151 JCT. $287,489.68 $0.00 11/20/2008 12/08/2008 12/30/2008 01/02/2009 04/06/2009 07/04/2009

Tulsa CT.ST. 060233 1842606 STP-172A(230)(149)IG N SHERWOOD CONSTRUCTION CO., INC. 2.229 MI. GRADING & DRAINAGE CITY STREET (GILCREASE EXPWY.) L.L. TISDALE TO LEWIS AVENUE. $14,837,819.91 $14,338,805.84 07/20/2006 08/07/2006 08/23/2006 09/11/2006 10/02/2006 02/13/2008

Tulsa CT.ST. 090024 1842906 STP-172B(443)(445)IG* N BECCO CONTRACTORS, INC. STPG-172-172B(444)(446)IG / 0.794 MI. CT.ST.,GRADE,DRAIN, SURFACE & TRAFFIC SIGNALS. AT THE INTERSECTION OF ELM ST. $2,126,549.74 $0.00 01/22/2009 02/02/2009 02/12/2009 02/18/2009 03/23/2009 07/20/2009

Tulsa I-244 080425 2543904 SBR-172N(409)(410)(435)SB N BECCO CONTRACTORS, INC. 0.00 MI. IS-244; BRIDGE REPAIR;OVER MINGO RD.,6.26 MI.E. OF IS-44.I-244;OVER 89TH AVE. 5.74 MI. $3,971,640.45 $509,073.99 09/18/2008 10/06/2008 10/14/2008 10/16/2008 03/02/2009 11/26/2009

Tulsa I-244 080443 2458304 BHIY-0244-2(472) 096 N PBX CORPORATION 0.027 MI. I-244; BRIDGE REHABILITATION/ENTRANCE RAMP OVER 1ST. STREET. $807,534.75 $0.00 09/18/2008 10/06/2008 10/21/2008 10/30/2008 03/16/2009 05/29/2009

Tulsa I-44 060249 2295904 HSIPG-172N(304)TR N ACTION SAFETY SUPPLY CO. 0.00 MI.DELINEATION & SIGN -ING PROJECT;TULSA METRO- AREA; AT VARIOUS LOCATIONS. $408,666.43 $348,262.79 03/15/2007 04/02/2007 04/12/2007 04/17/2007 07/15/2007 11/11/2007

Tulsa I-44 070151 0637466 SEC117-172N(344)SG N ARK WRECKING OF OK., INC. 0.00 MI. RIGHT-OF-WAY CLEARANCE PROJECT I-44 NORT SIDE OF I-44 FROM RIVERSIDE DRV. TO UTICA AVE. IN TULSA. $258,600.00 $263,795.00 05/17/2007 06/04/2007 06/18/2007 07/09/2007 08/13/2007 04/08/2008

Tulsa I-44 080028 0637473 IMY-0044-2(464)227RW N D T SPECIALIZED SERVICES, INC. 0.00 MI. RIGHT-OF-WAY CLEARANCE CONTRACT I-44 AT HARVARD AVENUE IN THE CITY OF TULSA. $178,288.00 $166,817.65 01/17/2008 02/04/2008 02/21/2008 03/03/2008 04/07/2008 12/02/2008

Tulsa I-44 080200 0637474 IM-0044-2(469)227SG N ARK WRECKING OF OK., INC. 0.00 MI. I-44; RIGHT-OF-WAY CLEARANCE;FROM EAST OF RIVER- SIDE DR., EAST TO WEST OF YALE AVE. $45,600.00 $39,348.00 04/17/2008 04/25/2008 05/09/2008 05/19/2008 06/23/2008 12/19/2008

Tulsa I-44 080454 0637468 IMY-0044-2(473)225 NI N SHERWOOD CONSTRUCTION CO., INC. 1.30 MI. IS-44; SURFACING, GRADING,DRAINAGE & UTILITIES ;NORTH FRONTAGE RD. FROM THE ARKANSAS RIVER,EXTEND EAST $42,395,254.70 $5,310,860.77 10/16/2008 11/03/2008 11/13/2008 11/20/2008 03/02/2009 03/31/2011

Tulsa I-44 080169 2508104 IMG-44-2(465)230 TR* N ACTION SAFETY SUPPLY CO. */IMG-244-2(466)000TR/NHY- 30N(062)TR;0.00 MI. I-44;STRIP-ING & PAVEMENT MARKING;BE- GIN AT MILE MARKER 230,EXT. NO $787,323.47 $244,070.01 03/20/2008 04/07/2008 04/18/2008 05/01/2008 05/19/2008 12/14/2008

Tulsa IS-44 070446 0637472 SEC115-172A(388)SG N D T SPECIALIZED SERVICES, INC. 0.00 MI.;IS-44/RIGHT-OF-WAY CLEARANCE CONTRACT;BEGIN AT RIVERSIDE DR. & EXTEND EAST TO YALE AVE. IN TULSA. $375,272.88 $369,740.15 11/15/2007 12/03/2007 12/19/2007 01/03/2008 02/04/2008 09/30/2008

Tulsa IS-44 080240 0637475 IM-0044-2(470)227SG N D T SPECIALIZED SERVICES, INC. 0.00 MI. RIGHT-OF-WAY CLEAR- ANCE CONTRACT/ IS-44;BEGIN AT RIVERSIDE DR., EXTEND EAST. $524,988.00 $349,461.96 05/15/2008 06/02/2008 06/24/2008 06/27/2008 08/04/2008 03/31/2009

Tulsa IS-44 080351 0637476 SEC115-172N(434)SG N ARK WRECKING OF OK., INC. 0.00 MI. IS-44; RIGHT-OF- WAY CLEARANCE. BEGIN AT RIVER-SIDE DRIVE & EXTEND EAST. $247,500.00 $182,410.00 08/21/2008 09/19/2008 10/02/2008 10/07/2008 11/12/2008 07/09/2009

Tulsa IS-44 090070 0637478 SEC1702Y-172N(453)HP N ARK WRECKING OF OK., INC. 0.00 MI. IS-44;RIGHT-OF- WAY CLEARANCE CONTRACT;FROM RIVERSIDE DR. EAST TO YALE AVENUE IN TULSA. $767,000.00 $0.00 02/19/2009 03/02/2009 03/10/2009 03/12/2009 04/13/2009 12/08/2009

Tulsa IS-44 090071 0637479 SEC117-172N(454)SG N ARK WRECKING OF OK., INC. 0.00 MI. IS-44;RIGHT-OF-WAY CLEARANCE CONTRACT;FROM RIVER-SIDE DR. EAST TO YALE AVENUE IN TULSA. $847,000.00 $0.00 02/19/2009 03/02/2009 03/10/2009 03/12/2009 04/13/2009 12/08/2009

Tulsa SH-20 070305 2192204 SAB-172A(269)BF N SHERWOOD CONSTRUCTION CO., INC. 0.319 MI. SH-20/ GRADING, DRAINAGE, BRIDGE,SURFACING & EROISION CONTROL.OVER BLACKJACK CR., APPROX. 0.1. $2,156,881.20 $2,122,426.11 08/16/2007 09/10/2007 09/20/2007 10/02/2007 01/07/2008 07/04/2008

Tulsa SH-51 090099 2545104 STPY-172A(413)3R N BECCO CONTRACTORS, INC. 2.84 MI. SH-51;RESURFACE (ASPHALT)(BROKEN ARROW EXPWY) FROM HARVARD AVENUE,EAST TO IS-44. $1,971,974.00 $0.00 02/19/2009 03/02/2009 03/10/2009 03/12/2009 04/06/2009 06/04/2009

Tulsa SH-97 080103 0000514 STPY-072A(475)TR N MIDSTATE TRAFFIC CONTROL, INC. 0.00 MI. SH-97;LIGHTING; FROM 41ST SOUTH, NORTH TO US- 62 IN SAND SPRINGS. $539,359.50 $483,771.55 04/17/2008 04/25/2008 05/09/2008 06/12/2008 09/08/2008 03/06/2009

Tulsa SH-97 080436 2412704 SSP-172A(438)SS N ACTION SAFETY SUPPLY CO. 0.00 MI. SH-97/SAFETY IMPROV. (CABLE BARRIER PROJECT);BEGIN AT WEST 51ST ST. & EXT. NORTH. $222,486.62 $0.00 01/22/2009 03/02/2009 03/09/2009 03/11/2009 04/06/2009 05/20/2009

Tulsa US-169 080066 2411004 NHG-030N(059)TR N ACTION SAFETY SUPPLY CO. 0.00 MI. US-169;SAFETY IM- PROVEMENT(CABLE BARRIER PRO- JECT) BEGIN AT E. 36TH ST. EXTEND NO. TO BIRD CR. OVERFLO $673,832.59 $569,403.63 02/21/2008 03/03/2008 03/12/2008 03/24/2008 05/05/2008

Tulsa US-64 080352 2578504 BPMY-NBIP(403)3B N TEXAS BRIDGE PARTNERS, L.P. 0.00 MI. US-64;BRIDGE PAINT -ING US-I-244/US-75, AT VARIOUS LOCATIONS IN DIV. III. $430,380.00 $422,337.00 08/21/2008 09/19/2008 10/02/2008 11/06/2008 01/05/2009 02/18/2009

Tulsa US-64 080365 2316304 STPY-172A(315) N APAC-OKLAHOMA, INC. 1.491 MI. WIDENING & RESURFACE US-64 BEGIN AT CREEK TURNPIKE AND EXTEND SOUTH. $2,806,128.74 $188,987.69 11/20/2008 12/08/2008 12/19/2008 12/30/2008 03/02/2009 10/07/2009

Tulsa US-64 770600 0945604 SAP-72(327) N REPUBLIC PAVING CO. 0.0000 Mis. Br. Rep. in Tulsa on US-64 at Br. No. 7286-0699X(W. 129th W. Ave. over US-64). $8,900.00 $8,900.00 02/26/1988 03/07/1988 03/10/1988 03/24/1988 04/07/1988 05/02/1988

Tulsa US-64 080353 2578505 BPMY-172N(423)3B N GIBSON & ASSOCIATES, INC. 0.00 MI. US-64/US-75/I-244; JOINT SEAL/REPAIR, AT VARIOUS LOCATIONS IN DIV. VIII. $584,011.05 $0.00 08/21/2008 09/19/2008 09/30/2008 11/10/2008 03/02/2009 05/15/2009

Tulsa US-75 070376 2411104 NHG-014N(067)TR N ACTION SAFETY SUPPLY CO. 0.00 MI. SAFETY IMPROVEMENT (CABLE BARRIER PROJECT) US-75 BEGIN AT 81ST EXTEND N. TO I-244 IN TULSA. $794,183.40 $469,896.33 08/16/2007 09/10/2007 09/24/2007 10/02/2007 11/05/2007 02/02/2008

Tulsa US-75 080140 2415404 NHY-014N(069) N BECCO CONTRACTORS, INC. 5.570 MI. US-75;PAVEMENT RE- HABILITATION.BEGIN NO. OF I- 244 & EXTEND NO. TO 56TH ST. NO. (SOUTHBOUND ONLY). $1,655,768.28 $1,616,699.90 03/20/2008 04/07/2008 04/16/2008 04/25/2008 08/04/2008 01/30/2009

Tulsa US-75 080251 1738707 NHY-014N(078)RW N ARK WRECKING OF OK., INC. 0.00 MI. US-75./CT.ST.; RIGHT-OF-WAY CLEARANCE CON- TRACT;BETWEEN 121ST ST. SO. & 111TH ST. SO. CT.ST. $116,000.00 $110,200.00 05/15/2008 06/02/2008 06/19/2008 06/27/2008 07/21/2008 11/17/2008

Wagoner SH-72 080223 2091404 BRFY-173B(083) N M.J. LEE CONSTRUCTION COMPANY 0.155 MI. GRADE, DRAIN, SURFACE, BRIDGE & RAILROAD SH-72 OVER UNNAMED CRK. @ JCT. SH-51 IN COWETA. $7,973,218.60 $607,175.74 09/18/2008 10/06/2008 10/23/2008 10/28/2008 02/02/2009 12/28/2009

Washington CO.RD. 080335 2209104 BRF-174C(037)CO* N BEACHNER CONSTRUCTION CO., INC. */CIRB-74C(157)RB/ 0.429 MI. CO.RD.; BRIDGE & APPROACHES AT DEER CR., 1.0 M. N. & 0. 4 MI. E. OF US-75. $1,684,750.13 $297,901.21 08/21/2008 09/19/2008 09/30/2008 10/17/2008 01/05/2009 08/17/2009

Washington US-75 880321 0440304 MAF-15(208) N SHERWOOD CONST. CO., INC. 5.255 MI. GR.DR.BR. & EROSION CONTROL ON US-75,BEG. 1.00 MI.N. OF THE TULSA C/L & EXT. N. TO APPROX.1.00MI. S.OF RAMONA. $1,597,223.22 $1,436,437.40 09/26/1986 10/06/1986 10/15/1986 10/28/1986 11/11/1986 11/06/1987

Washita CO.RD. 080372 2323804 BRF-175C(070)CO N K & R BUILDERS, INC. 0.146 MI. CO.RD.; BRIDGE & APPROACHES; OVER GYP CREEK, 1.75 MI. EAST OF LAKE VALLEY. $376,293.80 $19,276.48 11/20/2008 12/08/2008 12/23/2008 01/06/2009 02/23/2009 06/22/2009

Washita IS-40 090142 2412605 SSP-175N(085)SS N JLT CONTRACTING, LLC 0.00 MI. IS-40;SAFETY IM- PROVEMENT(CABLE BARRIER);BEGINAT MILEMARKER 43.9 & EX- TEND EAST TO MILEMARKER 49.0 $1,261,108.17 $0.00 02/19/2009 03/02/2009 03/17/2009 03/20/2009 05/04/2009 08/01/2009

Washita SH-44 090091 2599404 STPY-175C(101)(102)3R N CASWELL CONTRACTING, INC. 9.81 MI. SH-44;RESURFACE (ASPHALT) BEGIN AT SH-152 AND EXTEND NORTH. $1,655,261.50 $0.00 01/22/2009 02/02/2009 03/03/2009 03/06/2009 07/06/2009 09/23/2009

Washita US-183 060288 1712608 ACNHY-009N(082)GB N DOBSON BROTHERS CONSTRUCTION CO. 2.867 MI. GRADE, DRAIN, SURFACE & BRIDGE US-183 BEGIN S. OF SH-152 & EXTEND NORTH. $11,893,891.64 $11,796,049.26 03/15/2007 04/02/2007 04/10/2007 04/17/2007 08/06/2007 06/25/2008

Woods CORD 080203 2304804 BRO-176D(090)CO N K & R BUILDERS, INC. 0.191 MI. CO.RD.;BRIDGE & APPROACHES;OVER BOGGY CR.,4.0 MI. W. & 5.3 MI. NORTH OF US-281/US-64 JCT. $617,406.10 $533,543.17 07/24/2008 08/12/2008 08/27/2008 09/04/2008 10/06/2008 02/02/2009

Woods US-281 070014 1745810 STPY-176B(028) N THE CUMMINS CONSTRUCTION CO., INC. 6.3 MI. WIDENING & RESURFACE US-281 BEGIN 6.3 MI. S. OF HOPETON & EXTEND NORTH. $9,327,265.28 $7,862,982.66 03/15/2007 04/02/2007 04/19/2007 04/26/2007 08/06/2007 05/31/2008

Woods US-64 070412 2094904 BRFY-176B(069)BF N VENTURE CORPORATION DBA V. C. O. PAVING 0.928 MI. BRIDGE & APPROACHES US-64 OVER SAND CRK. 6.3 MI. E. OF HARPER COUNTY LINE. $4,767,436.09 $4,282,278.68 10/18/2007 11/05/2007 11/14/2007 01/09/2008 04/07/2008 01/11/2009

Woods US-64 080202 2095004 BRFY-176B(072) N VENTURE CORPORATION DBA V. C. O. PAVING 0.938 MI. BRIDGE & APPROACHES US-64 OVER WEST MOCCASIN CRK. 8.1 MI. E. OF HARPER COUNTY LINE. $4,784,951.43 $2,733,089.37 04/17/2008 04/25/2008 05/13/2008 05/16/2008 09/08/2008 06/14/2009

Woodward CORD 080245 2289404 BRO-177D(071)CO N OBC, INC. 0.368 MI. BRIDGE & APPROACHES COUNTY RD. (EW-26) OVER DOE CRK. APPROX. 3.69 MI. N. & 5.1 MI. EAST OF MOORELAND. $673,779.95 $605,983.80 05/15/2008 06/02/2008 06/12/2008 06/27/2008 10/06/2008 02/02/2009

Woodward US-270/US 040381 1745708 ACNHY-17N(51)(52)GB N UNITED GENERAL CONTRACTORS, INC. 4.580 MI. GRADE,DRAIN,BRIDGE. SH-3; US-270; BEGIN APPROX. 0.7 MI. SOUTHEAST OF JCT. SH -5 EXTEND NORTHWEST.NOI PERMIT $3,435,835.76 $3,003,103.49 09/23/2004 10/11/2004 10/29/2004 12/10/2004 01/03/2005 10/29/2005