All Active Projects
County |
Highway Number |
Contract ID |
Job Piece |
Project |
Stimulus Indicator |
Prime Contractor |
Job Description |
Original Contract Amount |
Amount Paid |
Let Date |
Award Date |
Contract Date |
Work Order Date |
Work Order Effective Date |
Estimated Completion Date |
|
Adair |
CORD |
080052 |
2125604 |
BRO-101D(062)CO |
N |
DTEC SERVICES, LLC |
0.1310 MI. CO.RD.;BRIDGE & APPROACHES;OVER GANN HOLLOW CR.,APPROX. 2.1 MI. SO. & 2.3 MI. E. OF BUNCH. |
$235,846.94 |
$230,936.29 |
01/17/2008 |
02/04/2008 |
02/21/2008 |
03/03/2008 |
06/02/2008 |
08/30/2008 |
|
Adair |
CORD |
080357 |
1260704 |
CIRB-001D(133)RB |
N |
PARADIGM CONSTRUCTION & ENGINEERING, INC |
0.321 MI. CO.RD.; GRADE, DRAIN,SURFACE & BRIDGE/0.25 MILES EAST OF WATTS. |
$968,827.40 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/18/2009 |
02/27/2009 |
05/04/2009 |
10/30/2009 |
|
Adair |
SH-51 |
090047 |
2597804 |
STPY-101C(085)(086)3R |
N |
GLOVER & ASSOCIATES, INC. |
11.71 MI. SH-51;RESURFACE (ASPHALT)BEGIN @ THE CHEROKEE COUNTY LINE, EXTEND E./US- 59,BEGIN 0.3 MI. S. OF SH-51. |
$2,049,914.25 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/18/2009 |
02/25/2009 |
|
08/31/2009 |
|
Adair |
US-59 |
070398 |
1663104 |
BRFY-101A(010)BF/SAB-21C* |
N |
M.J. LEE CONSTRUCTION COMPANY |
(212)BF/STPY-101A(12) 1.768 MI BR & APPRS/GRD, DRN & SURF US-59 ILLINOIS RVR N OF WATTS SBONLY/SH-127 DROWNING CRK N JAY |
$11,498,920.25 |
$7,204,744.16 |
09/20/2007 |
10/08/2007 |
10/22/2007 |
10/30/2007 |
04/07/2008 |
07/30/2009 |
|
Adair |
US-59 |
090040 |
2624404 |
HSIPY-151B(194)TR |
N |
MIDSTATE TRAFFIC CONTROL, INC. |
0.00 MI. US-59/SH-150/SH-2/ US-64; AT VARIOUS LOCATIONS INDIVISION 1 |
$88,148.80 |
$0.00 |
02/19/2009 |
03/02/2009 |
03/12/2009 |
03/13/2009 |
05/04/2009 |
06/02/2009 |
|
Adair |
US-62 |
070396 |
0808904 |
SAB-001B(153)BF |
N |
SHERWOOD CONSTRUCTION CO., INC. |
0.558 MI. BRIDGE & APPROACHES US-62 OVER TYNER CRK. APPROX. 1.6 MI. E. OF ADAIR / CHEROKEE COUNTY LINE. |
$3,400,098.10 |
$3,189,832.84 |
09/20/2007 |
10/08/2007 |
10/22/2007 |
10/25/2007 |
01/07/2008 |
08/04/2008 |
|
Alfalfa |
CORD |
080068 |
2070504 |
BRF-102C(065)CO |
N |
REECE CONSTRUCTION CO., INC. |
0.132 MI. GRADE, DRAIN, SURF. & BR. CO. RD. UNNAMED CRK. TRIB. TO WAGON CRK. 2.2 MI. N. SH-45 & 1.0 MI. W. GOLTRY. |
$335,544.35 |
$351,385.71 |
02/21/2008 |
03/03/2008 |
03/17/2008 |
05/01/2008 |
06/02/2008 |
09/29/2008 |
|
Alfalfa |
SH-45 |
080293 |
2480804 |
SBR-102B(125)SB |
N |
LOGOS CONSTRUCTION COMPANY |
0.00 MI. BRIDGE REHABILITATION SH-45 BRIDGE OVER EAGLE CHIEF CREEK 1.2 MI. EAST OF WOODS COUNTY LINE. |
$894,812.00 |
$855,825.40 |
07/24/2008 |
08/12/2008 |
08/27/2008 |
08/29/2008 |
12/01/2008 |
02/28/2009 |
|
Atoka |
CORD |
080336 |
2166004 |
BRO-103D(067)CO |
N |
HUB CONSTRUCTION, INC. |
0.143 MI. CO.RD./BRIDGE & APPROACHES; OVER BUCK CREEK, 1.5 MI. W. OF DAISY. |
$503,973.25 |
$337,416.87 |
08/21/2008 |
09/19/2008 |
09/30/2008 |
10/02/2008 |
01/05/2009 |
04/14/2009 |
|
Atoka |
SH-3 |
070378 |
2314104 |
NHY-017N(187) |
N |
KOSS CONSTRUCTION COMPANY & SUBSIDIARY |
2.609 MI. SH-3;GRADE,DRAIN, BRIDGE & SURFACE;BEGIN APPROX.4.5 MI. E. OF ATOKA, EXTEND EAST. |
$5,943,840.68 |
$3,043,001.03 |
09/20/2007 |
10/08/2007 |
10/18/2007 |
12/04/2007 |
02/04/2008 |
02/02/2009 |
|
Atoka |
SH-3 |
080410 |
1020904 |
BRFY-017N(018) |
N |
M.J. LEE CONSTRUCTION COMPANY |
1.174 MIL. SH-4;BRIDGE & APPROACHES;OVER MUDDY BOGGY CR., WEST OF FARRIS. |
$5,688,617.88 |
$1,068,379.26 |
10/16/2008 |
11/03/2008 |
11/13/2008 |
11/19/2008 |
03/02/2009 |
12/26/2009 |
|
Atoka |
SH-3 |
080428 |
2030610 |
NHY-017N(216)RW |
N |
ARK WRECKING OF OK., INC. |
0.00 MI. RIGHT-OF-WAY CLEARANCE SH-3 FROM PUSHMATAHA COUNTY LINE EXTEND WEST. |
$78,600.00 |
$58,950.00 |
09/18/2008 |
10/06/2008 |
10/28/2008 |
10/31/2008 |
11/24/2008 |
03/23/2009 |
|
Atoka |
SH-7 |
070015 |
2172704 |
SAB-103C(068)BF |
N |
MUSKOGEE BRIDGE COMPANY, INC. |
1.307 MI. BRIDGE & APPROACHES OVER CLEAR BOGGY & O'FLOWS & DRY BOGGY CRKS. APPROX. 5.2 MI. E. OF JOHNSON C/L. |
$6,041,360.43 |
$6,044,335.42 |
12/19/2006 |
01/08/2007 |
01/29/2007 |
02/07/2007 |
05/07/2007 |
06/09/2008 |
|
Atoka |
US-69 |
090001 |
2607504 |
NHY-013N(121)3R |
N |
DUIT CONSTRUCTION COMPANY, INC. |
4.92 MI. US-69;RESURFACE (CONCRETE);BEGIN 0.4 MI. NORTHOF BRYAN COUNTY LINE, EX- TEND NORTH. |
$1,824,405.00 |
$33,090.40 |
01/22/2009 |
02/02/2009 |
02/10/2009 |
02/12/2009 |
05/30/2009 |
05/31/2009 |
|
Beaver |
CO.RD. |
090045 |
2204204 |
BRO-104D(041)CO |
N |
K & R BUILDERS, INC. |
0.226 MI. CO.RD./ BRIDGE & APPROACHES;OVER NO. FORK OF CLEAR CR., 4.0 MI. W. & 2.8 MI. N. OF THE US-412/SH-23 |
$518,799.90 |
$0.00 |
02/19/2009 |
03/02/2009 |
03/10/2009 |
03/12/2009 |
06/01/2009 |
10/28/2009 |
|
Beaver |
CORD |
080133 |
2204004 |
BRO-104D(039)CO |
N |
K & R BUILDERS, INC. |
0.1880 MI. CO.RD./BRIDGE & APPROACHES;OVER BULL CR.,4.0 MI. NO. & 3.9 MI.WEST OF THE US-412/US-83 JUNCTION. |
$431,162.41 |
$398,407.81 |
03/20/2008 |
04/07/2008 |
04/16/2008 |
04/25/2008 |
08/04/2008 |
12/01/2008 |
|
Beckham |
CTST |
080153 |
2132004 |
STP-105B(083)UR |
N |
TOM HUDSON PAVING, INC. |
0.6500 MI. CT.ST.;GRADE, DRAIN,SURFACE, FROM OILFIELD DR. TO RANDALL AVE. IN ELK CITY. |
$2,135,825.67 |
$1,813,299.29 |
03/20/2008 |
04/07/2008 |
04/16/2008 |
04/25/2008 |
08/04/2008 |
02/19/2009 |
|
Beckham |
I-40 |
070106 |
2378304 |
STPY-105E(138)EH |
N |
DUIT CONSTRUCTION COMPANY, INC. |
1.01 MI. CONSTRUCT TOURIST INFORMATION CENTER & LANDSCAPE I-40 10 MI. E. OF THE TEXAS/OKLAHOMA STATE LINE EASTBOUND. |
$6,144,201.17 |
$6,251,020.42 |
03/01/2007 |
03/05/2007 |
03/09/2007 |
03/12/2007 |
04/02/2007 |
09/28/2007 |
|
Beckham |
I-40 |
080337 |
2412604 |
IMG-40-2(138)23TR/SSP-* |
N |
RMD HOLDINGS, LTD. DBA NATIONWIDE FENCE & SUPPLY COMPANY |
*105N(141)SS / 9.3 MI. SAFETY IMPROVEMENT (CABLE BARRIER) I-40 FROM M.M. 23 TO M.M. 28 & FROM M.M. 28.1 TO 32.4. |
$1,477,201.96 |
$1,299,467.03 |
09/18/2008 |
10/06/2008 |
10/23/2008 |
11/12/2008 |
12/01/2008 |
02/28/2009 |
|
Beckham |
IS 40 |
080307 |
2447005 |
SBR-105N(154)SB |
N |
LOGOS CONSTRUCTION COMPANY |
0.25 MI. IS-40;BRIDGE REHA- BILITATION;OVER THE NORTH FORKOF THE RED RIVER, BEGIN AT MILEPOST 22.75 & EXTEND EAST. |
$373,476.00 |
$72,311.56 |
07/24/2008 |
08/12/2008 |
08/27/2008 |
09/02/2008 |
03/02/2009 |
04/30/2009 |
|
Beckham |
IS-40 |
080295 |
2578304 |
BPMY-NBIP(401)3B |
N |
POSEIDON CONSTRUCTION, INC. |
0.00 MI. IS-40; BRIDGE PAINT -ING/ OVER LITTLE TURKEY CR., 6.1 MI. EAST OF TEXAS LINE. |
$110,776.00 |
$0.00 |
08/21/2008 |
09/19/2008 |
10/02/2008 |
12/04/2008 |
01/05/2009 |
03/15/2009 |
|
Beckham |
IS-40 |
080297 |
2578305 |
BPMY-105N(168)3B |
N |
LOGOS CONSTRUCTION COMPANY |
0.00 MI. IS-40;JOINT SEAL/ REPAIR;OVER LITTLE TURKEY CR.,6.1 MI. EAST OF TEXAS LINE. |
$212,540.00 |
$0.00 |
08/21/2008 |
09/19/2008 |
10/07/2008 |
10/15/2008 |
03/02/2009 |
05/10/2009 |
|
Beckham |
IS-40 |
080459 |
2422105 |
IMY-0040-1(085)020 |
N |
K & R BUILDERS, INC. |
0.00 MI. IS-40; BRIDGE RE- DECKING & REHAB.;OVER SAND CR., 12.6 MI. EAST OF SH-30. |
$1,030,795.40 |
$0.00 |
11/20/2008 |
12/08/2008 |
12/23/2008 |
01/02/2009 |
04/06/2009 |
08/18/2009 |
|
Beckham |
SH-6 |
050173 |
1496919 |
STPY-105B(010) |
N |
DOBSON BROTHERS CONSTRUCTION CO. |
6.76 MI. GRADE, DRAIN & SURFACE SH-6 FROM SH-55E JCT. EXT. N. TO SADDLER CRK. |
$11,077,491.46 |
$10,555,649.44 |
08/17/2006 |
09/11/2006 |
09/26/2006 |
10/05/2006 |
01/08/2007 |
04/28/2008 |
|
Beckham |
SH-6 |
080218 |
2446904 |
SBR-105C(151)(152)SB/SBR* |
N |
PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC |
*-105N(153)(159)SB/0.48 MI BR REHAB SH-6 BUFFALO & STARVATION CRK E SH-152/I-40 N FORK RED RVR/I-40B RR UNDRPSS (WBOUND) |
$3,292,898.15 |
$3,034,799.14 |
03/20/2008 |
04/07/2008 |
04/18/2008 |
05/05/2008 |
08/04/2008 |
05/30/2009 |
|
Blaine |
CORD |
080449 |
2255204 |
BRO-106D(072)CO |
N |
OBC, INC. |
0.188 MI. BRIDGE & APPROACHES CO. RD. (NS-247) OVER UNNAMED CRK. 1.0 MI. W. & 5.3 MI. S. OF SH-51/SH-58 IN CANTON. |
$405,064.35 |
$120,949.34 |
10/16/2008 |
11/03/2008 |
11/13/2008 |
11/20/2008 |
03/02/2009 |
05/30/2009 |
|
Blaine |
US-270 |
090133 |
2624604 |
HSIPY-120B(172)TR |
N |
MIDSTATE TRAFFIC CONTROL, INC. |
0.00 MI. US-270/SAFETY IM- PROV.(RUMBLE STRIP) SH-8/SH-54AT VARIOUS LOCATIONS IN DIV. V. |
$155,560.55 |
$0.00 |
02/19/2009 |
03/02/2009 |
03/12/2009 |
03/16/2009 |
05/04/2009 |
06/17/2009 |
|
Bryan |
CORD |
080444 |
2248904 |
STP-107C(099)CO |
N |
OVERLAND CORPORATION |
1.98 MI. CO.RD.; GRADE, DRAIN & SURFACE/ FROM US-70, EXTEND SOUTH. |
$1,551,228.12 |
$120,743.00 |
10/16/2008 |
11/03/2008 |
11/10/2008 |
11/18/2008 |
01/05/2009 |
|
|
Bryan |
US-69 |
070379 |
2407204 |
NHG-013N(115)TR |
N |
ACTION SAFETY SUPPLY CO. |
0.00 MI. SAFETY IMPROVEMENT (CABLE BARRIER PROJECT) US-69 BEGIN AT RED RIVER & EXTEND NORTH TO PLATTER RD. |
$1,206,645.45 |
$1,258,282.33 |
09/20/2007 |
10/08/2007 |
10/22/2007 |
10/26/2007 |
02/04/2008 |
06/02/2008 |
|
Bryan |
US-69 |
080460 |
2599004 |
NHY-13N(120)3R |
N |
INTERSTATE HIGHWAY CONSTRUCTION, INC. |
3.47 MI. US-69/ BEGIN 10.8 MI. NO. OF OKLA./TEXAS STATE LINE, EXTEND NORTH. |
$2,253,196.60 |
$0.00 |
11/20/2008 |
12/08/2008 |
12/23/2008 |
02/24/2009 |
04/06/2009 |
06/19/2009 |
|
Bryan |
US-70 |
070328 |
1674413 |
ACNHY-022N(116)GB |
N |
THE CUMMINS CONSTRUCTION CO., INC. |
2.658 MI. GRADE, DRAIN, WIDEN & RESURFACE US-70 FROM 3.5 MI.W. OF MEAD & EXTEND E. |
$7,721,467.99 |
$2,861,555.62 |
08/16/2007 |
09/10/2007 |
09/24/2007 |
10/02/2007 |
01/07/2008 |
03/21/2009 |
|
Bryan |
US-70 |
080429 |
1884717 |
NHY-022N(182)RW |
N |
M & M WRECKING, INC. |
0.00 MI. US-70/RIGHT-OF- WAY CLEARANCE;EAST OF SH-78, EXTEND EAST. |
$128,455.00 |
$115,609.50 |
09/18/2008 |
10/06/2008 |
10/21/2008 |
10/24/2008 |
11/17/2008 |
03/16/2009 |
|
Caddo |
CORD |
080221 |
2232404 |
BRO-108D(137)CO |
N |
OBC, INC. |
0.188 MI. BR. & APPRS. CO. RD. (EW-115) OVER TRIB. TO LAKE CRK. APPROX. 9.2 MI. W. & 2.7 MI. N. US-281/SH-152 IN BINGER |
$421,491.94 |
$388,578.47 |
05/15/2008 |
06/02/2008 |
06/12/2008 |
06/27/2008 |
10/06/2008 |
01/03/2009 |
|
Caddo |
I-40 |
080069 |
2025704 |
IMY-40-4(391)90/SSP-120N* |
N |
HASKELL LEMON CONSTRUCTION CO. |
*(136)SS/IMG-40-3(69)89TR / 5.529 MI RESURF & SFTY IMPRVMNT (CBL BARR) I-40 FROM MM 82.3 TO MM 96 E. OF WEATHERFORD. |
$9,534,185.87 |
$10,365,740.28 |
02/21/2008 |
03/03/2008 |
03/12/2008 |
03/27/2008 |
05/05/2008 |
11/30/2008 |
|
Caddo |
IS-40 |
080070 |
2025705 |
IMG-0040-4(392)096* |
N |
HASKELL LEMON CONSTRUCTION CO. |
*IMG-40-4(416)095TR/IMG-40 -4(417)098TR/ 6.39 MI. IS-40; RESURFACE & SAFETY IMPRO. (CABLE BARRIER)FROM MILE POST. |
$8,154,119.77 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/11/2009 |
02/12/2009 |
07/06/2009 |
02/25/2010 |
|
Caddo |
SH-19 |
080303 |
2171309 |
BRFY-108C(140) |
N |
T & G CONSTRUCTION, INC. |
2.679 MI. SH-19;GRADE,DRAIN & SURFACE;FROM 5.5 MI. EAST OF JCT US-62, EXTEND EAST. |
$5,629,322.71 |
$0.00 |
01/22/2009 |
03/02/2009 |
03/16/2009 |
03/17/2009 |
06/01/2009 |
12/27/2009 |
|
Caddo |
US-281 |
080417 |
2583904 |
SAP-108B(251) |
N |
T & G CONSTRUCTION, INC. |
0.400 MI. US-281; SAFETY IMPROV.(RDWY MODIFICATION) BE-GAN 2.6 MI. N. OF US-62, EXTEND NORTH. |
$587,348.10 |
$263,431.40 |
09/18/2008 |
10/06/2008 |
10/21/2008 |
10/28/2008 |
02/02/2009 |
04/02/2009 |
|
Caddo |
US-62 |
070403 |
2171104 |
BRFY-108B(122)/IBRY-108* |
N |
OBC, INC. |
*(187)IB / 0.283 MI. BRIDGE & APPROACHES US-62 OVER BOXELDER CRK. APPROX. 1.45 MI. N. OF SH-19. |
$1,945,111.34 |
$1,990,395.39 |
10/18/2007 |
11/05/2007 |
11/27/2007 |
12/03/2007 |
05/05/2008 |
12/30/2008 |
|
Caddo |
US-62 |
070380 |
2332404 |
BRFY-108B(148) |
N |
WITTWER CONSTRUCTION CO., INC. |
0.171 MI. BRIDGE & APPROACHES US-62 OVER HOG CRK. BEGIN BEGIN APPROX. 6.84 MI. N. OF SH-19 & EXTEND NORTH. |
$1,955,669.90 |
$1,971,689.89 |
09/20/2007 |
10/08/2007 |
10/22/2007 |
10/30/2007 |
02/04/2008 |
09/30/2008 |
|
Caddo |
US-62 |
080195 |
2312505 |
BRFY-169C(151) |
N |
GARY A. CRAIN, INC. |
0.00 MI. BRIDGE WATERPROOFING (SILANE) US-62/SH-53/SH-77D/I-44 RAMP AT VARIOUS LOCATIONS IN DIVISION 7. |
$40,864.00 |
$30,725.88 |
04/17/2008 |
04/25/2008 |
05/12/2008 |
05/16/2008 |
09/08/2008 |
11/21/2008 |
|
Caddo |
US-62 |
090021 |
2614304 |
MC-108B(256) |
N |
T & G CONSTRUCTION, INC. |
3.020 MI.US-62; RESURFACE (ASPHALT) BEGIN 3.32 MI. E. OFUS-62/SH-9, EXT EAST. |
$504,769.50 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/20/2009 |
02/26/2009 |
|
06/30/2009 |
|
Canadian |
CO.RD. |
080430 |
2183804 |
CIRB-109C(096)RB |
N |
K & R BUILDERS, INC. |
0.378 MI.;CO.RD./BRIDGE & APPROACHES; OVER N. CANADIAN RIVER, 5.0 MI. N. & 2.0 MI. EAST OF GEARY. |
$1,105,390.97 |
$548,191.01 |
09/18/2008 |
10/06/2008 |
10/23/2008 |
10/29/2008 |
01/05/2009 |
05/04/2009 |
|
Canadian |
CO.RD. |
090046 |
2156604 |
BRO-109D(089)CO |
N |
D. M. DOZERS, INC. |
0.254 MI. CO.RD./GRADE,DRAIN, SURFACE & BRIDGE;OVER UNNAMED CREEK, 2.5 MI. SO. & 5.7 MI. WEST OF THE I-40/US-81 JCT. |
$423,263.20 |
$0.00 |
02/19/2009 |
03/02/2009 |
|
|
|
|
|
Canadian |
CORD |
080269 |
2156504 |
BRO-109D(088)CO |
N |
D. M. DOZERS, INC. |
0.302 MI. BRIDGE & APPROACHES COUNTY RD. (NS-269) OVER BOGGY CRK. APPROX. 4.1 MI. N & 4.0 MI. W. OF JCT. SH-37/SH-152. |
$484,877.72 |
$508,740.16 |
06/19/2008 |
07/14/2008 |
08/05/2008 |
08/07/2008 |
10/06/2008 |
01/03/2009 |
|
Canadian |
I-40 |
080217 |
2413604 |
IMG-0040-4(418)101TR |
N |
ACTION SAFETY SUPPLY CO. |
0.00 MI.I-40/SAFETY IMPROV- MENT (CABLE BARRIER);FROM MILEPOST 101, EXTEND EAST TO MILEPOST 106. |
$598,546.80 |
$589,381.71 |
04/17/2008 |
04/25/2008 |
05/05/2008 |
05/09/2008 |
07/07/2008 |
|
|
Canadian |
SH-4 |
070292 |
2321504 |
SAB-109B(117)BF |
N |
PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC |
0.094 MI. GRADING, DRAINAGE, SURFACING & BRIDGE SH-4 OVER UNNAMED CRK. 0.8 MI. N. OF SH-66. |
$652,992.18 |
$645,427.07 |
08/16/2007 |
09/10/2007 |
09/24/2007 |
10/12/2007 |
01/07/2008 |
04/15/2008 |
|
Canadian |
SH-4 |
080125 |
2543504 |
SSR-109C(143)SR |
N |
MARKWELL PAVING COMPANY |
6.61 MI. RESURFACE (MILL & OVERLAY) SH-4 FROM SH-66 N. TO SH-3. |
$693,008.80 |
$825,488.03 |
02/21/2008 |
03/03/2008 |
03/17/2008 |
03/25/2008 |
06/30/2008 |
08/28/2008 |
|
Canadian |
SH-4 |
080418 |
2085104 |
STPY-109B(077) |
N |
DUIT CONSTRUCTION COMPANY, INC. |
2.946 MI. GRADE, DRAIN, SURFACING & SIGNAL PLANS SH-4 FROM I-40 NORTH TO SH-66. |
$12,938,624.44 |
$1,448,385.07 |
09/18/2008 |
10/06/2008 |
10/21/2008 |
12/08/2008 |
03/02/2009 |
09/17/2010 |
|
Canadian |
SH-4 |
090041 |
2603004 |
STPY-109C(151)3R |
N |
ATLAS PAVING CO., INC. |
3.330 MI. SH-4;RESURFACE (ASPHALT)BEGIN AT SH-3 & EXTEND NORTH. |
$913,119.00 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/10/2009 |
02/12/2009 |
07/30/2009 |
07/31/2009 |
|
Canadian |
SH-66 |
070091 |
1511004 |
BRFY-009B(316) |
N |
PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC |
0.368 MI. GRADE, DRAIN, SURFACE & BRIDGE SH-66 OVER SIX MILE CRK. 1.2 MI. E. OF THE JUNCTION OF US-81. |
$2,146,073.72 |
$2,888,697.71 |
03/15/2007 |
04/02/2007 |
04/04/2007 |
04/12/2007 |
08/06/2007 |
02/11/2008 |
|
Canadian |
SH-66 |
070017 |
2321404 |
SAB-109C(118)BF* |
N |
OBC, INC. |
*MC-109C(126)/ 0.232 MI. GRADE, DRAIN, SURFACE & BRIDGE SH-66 BEGIN APPROX. 0.53 MI. W. OF BANNER RD. & EXTEND E. |
$2,925,761.68 |
$2,882,408.43 |
01/18/2007 |
02/06/2007 |
02/21/2007 |
03/13/2007 |
08/07/2007 |
07/01/2008 |
|
Canadian |
US-281 |
090078 |
1825704 |
SEC1702Y-130N(130)HP |
N |
THE CUMMINS CONSTRUCTION CO., INC. |
3.300 MI. US-281; BRADE, DRAIN & SURFACE;FROM NEW US- 281 SPUR, EXTEND NORTH. |
$6,715,437.15 |
$0.00 |
02/19/2009 |
03/02/2009 |
03/10/2009 |
03/12/2009 |
07/06/2009 |
04/01/2010 |
|
Canadian |
US-81 |
090016 |
0517312 |
NHY-011N(008) |
N |
DUIT CONSTRUCTION COMPANY, INC. |
3.90 MI. US-81;GRADE, DRAIN & SURFACE; BEGIN AT THE SH-152JCT, EXTEND NORTH. |
$7,978,265.75 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/10/2009 |
02/11/2009 |
07/06/2009 |
04/01/2010 |
|
Canadian |
US81 |
060373 |
1254412 |
NHY-011N (017) |
N |
THE CUMMINS CONSTRUCTION CO., INC. |
3.695 MI. GRADE, DRAIN, SURFACE & BRIDGE US-81 FROM 1.32 MI. N. OF I-40B IN ELRENO & EXTEND NORTH. |
$5,487,403.15 |
$5,124,889.02 |
11/16/2006 |
12/04/2006 |
12/21/2006 |
01/08/2007 |
04/02/2007 |
11/22/2007 |
|
Carter |
CO.RD. |
080076 |
2047204 |
BRF-110C(117)CO |
N |
BRUTON CONSTRUCTION CO., INC. |
0.425 MI. CO. RD.; BRIDGE & APPROACHES/CO.RD. OVER BULL CR., 6.0 MI. W. OF I-35, & 4.0 MI. SO. OF US-70. |
$750,800.29 |
$0.00 |
11/20/2008 |
12/08/2008 |
12/29/2008 |
01/02/2009 |
04/06/2009 |
07/04/2009 |
|
Carter |
CORD |
070144 |
2183504 |
BRO-110D(138)CO |
N |
BRIDGECO CONTRACTORS, INC. |
0.146 MI. BRIDGE & APPROACHES ON CO. RD. OVER RUSSELL PRETTY BRANCH APPROX. 3.0 MI. N. & 2.8 MI. E. OF SH-53/SH-76 JCT. |
$332,377.06 |
$313,665.19 |
04/19/2007 |
05/07/2007 |
05/22/2007 |
05/30/2007 |
07/02/2007 |
09/29/2007 |
|
Carter |
I-35 |
080431 |
2407604 |
IMG-0035-1(143)036 TR* |
N |
ACTION SAFETY SUPPLY CO. |
*IMG-035-1(144)031 TR/ 0.00 MI. IS-35;SAFETY IMPROV.(CABLEBARRIER PROJ.)BEGIN AT MILE MARKER 31 TO MILE MARKER 41. |
$1,292,356.93 |
$0.00 |
09/18/2008 |
10/06/2008 |
10/21/2008 |
10/28/2008 |
12/01/2008 |
03/10/2009 |
|
Carter |
IS-35 |
030011 |
1266404 |
IMY-35-1(100)031 |
N |
KECK CONSTRUCTION, INC. |
7.087 MI. RESURFACE (CONCRETE) I-35 FROM US-70 EXTEND NORTH. |
$11,873,167.58 |
$12,286,697.71 |
02/20/2003 |
03/03/2003 |
03/19/2003 |
04/07/2003 |
04/28/2003 |
09/30/2004 |
|
Carter |
IS-35 |
090026 |
2628604 |
SAP-110N(216) |
N |
PARADIGM CONSTRUCTION & ENGINEERING, INC |
0.00 MI. IS-35; BRIDGE REPR. :OVER SH-53 9.2 MI. NORTH OF JCT SH-142. |
$207,424.00 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/19/2009 |
02/27/2009 |
06/01/2009 |
06/30/2009 |
|
Carter |
SH-76 |
020444 |
1002404 |
STPY-10C(328)/* |
N |
BROCE CONSTRUCTION CO., INC. |
*BRFY-110C(001) 11.869 KM. GRADE, DRAIN, SURFACE & BRIDGE SH-76 BEGIN APPROX. 11.767 KM. S. OF RATLIFF CITY EXTEND N. |
$8,474,875.91 |
$7,902,902.86 |
09/26/2002 |
10/07/2002 |
10/16/2002 |
02/07/2003 |
03/03/2003 |
04/16/2004 |
|
Carter |
US-70 |
080258 |
0924704 |
STPY-010B(302) |
N |
OVERLAND CORPORATION |
1.929 MI. US-70; GRADE,DRAIN & SURFACE/ BEGIN 2.1 MI. WESTOF JCT US-70/SH-76, EXT. EAST. |
$5,739,555.91 |
$0.00 |
11/20/2008 |
12/08/2008 |
12/18/2008 |
12/30/2008 |
04/06/2009 |
12/31/2009 |
|
Carter |
US-70 |
090064 |
2502604 |
STPY-110N(209)3R |
N |
SILVER STAR CONSTRUCTION COMPANY, INC. |
1.00 MI. US-70;RESURFACE (ASPHALT)BEGIN 1.0 MI. EAST OFIS-35, EXT. EAST. |
$479,519.40 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/19/2009 |
02/26/2009 |
|
07/31/2009 |
|
Carter |
US-77 |
080401 |
2322504 |
BRFY-110C(179) |
N |
OVERLAND CORPORATION |
0.807 MI. US-77;BRIDGE & APPROACHES/OVER CADDO CR., 4.9MI. NORTH OF SH-199. |
$4,109,293.17 |
$973,166.75 |
09/18/2008 |
10/06/2008 |
10/20/2008 |
10/22/2008 |
02/02/2009 |
09/19/2009 |
|
Cherokee |
CO.RD. |
080053 |
2215304 |
BRO-111D(083)CO |
N |
DTEC SERVICES, LLC |
0.146 MI. CO.RD.;BRIDGE & APPROACHES(EW-78)OVER RATTLE- SNAKE CR. APPROX. 3.2 MI. SO. & 0.5 MI. W. OF HULBERT. |
$294,667.40 |
$284,558.32 |
01/17/2008 |
02/04/2008 |
02/21/2008 |
03/03/2008 |
06/02/2008 |
08/30/2008 |
|
Cherokee |
CORD |
080099 |
1954204 |
CIRB-111C(046)RB |
N |
PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC |
0.462 MI.CO. RD./BRIDGE & APPROACHES;OVER CANEY CR.,1.8 MI. NORTH OF BARBER. |
$2,804,768.24 |
$2,051,093.97 |
07/24/2008 |
08/12/2008 |
08/27/2008 |
09/02/2008 |
12/01/2008 |
07/08/2009 |
|
Cherokee |
SH-82 |
080046 |
1001004 |
STPY-011C(341)SS |
N |
SHERWOOD CONSTRUCTION CO., INC. |
6.719 KM WIDEN & RESURFACE SH-82 BEGIN APPROX. 0.6 MI. N.W. OF SH-100 & EXTEND N.W. |
$9,279,334.90 |
$1,205,049.40 |
01/17/2008 |
04/07/2008 |
04/16/2008 |
04/25/2008 |
08/04/2008 |
09/07/2009 |
|
Cherokee |
SH-82 |
080259 |
2172604 |
BRFY-111C(070)HP |
N |
GLOVER & ASSOCIATES, INC. |
0.6900 MI.SH-82;BRIDGE & APPROACHES/OVER BLACKBIRD CR.,11.2 MI. NO. OF US-62. |
$3,611,559.14 |
$1,824,769.68 |
06/19/2008 |
07/14/2008 |
07/24/2008 |
07/29/2008 |
11/03/2008 |
05/01/2009 |
|
Choctaw |
CO.RD. |
090131 |
2110004 |
BRO-112D(053)CO |
N |
HUB CONSTRUCTION, INC. |
0.160 MI. CO.RD./BRIDGE & APPROACHES;OVER UNNAMED CREEK,0.2 MI. SO. & 1.0 MI. EAST OF FT. TOWSON. |
$346,650.90 |
$0.00 |
02/19/2009 |
03/02/2009 |
03/12/2009 |
03/16/2009 |
06/01/2009 |
08/29/2009 |
|
Choctaw |
US-70 |
050710 |
1884904 |
ACBRFY-22N(68)* |
N |
MUSKOGEE BRIDGE COMPANY, INC. |
*ACBRFY-22N(111)GB; 3.517 MI. GRADE, DRAIN, SURFACE & BRIDGE US-70 FROM W. OF FALLON RD. EXTEND E. TO SH-147. |
$19,808,940.78 |
$15,685,768.02 |
08/17/2006 |
09/11/2006 |
09/26/2006 |
10/17/2006 |
11/06/2006 |
01/29/2008 |
|
Choctaw |
US-70 |
060012 |
1885104 |
ACNHY-22N(75)(76)GB* |
N |
M.J. LEE CONSTRUCTION COMPANY |
*/BRFY-022N(108): 3.22 MI. GRD, DRN, SURF, & BR US-70 BEG 5.4 MI E SH-147 & EXT E IN FT TOWSON/OVER ROCK & BIRD CRKS |
$11,777,045.23 |
$11,105,102.88 |
01/19/2006 |
02/13/2006 |
03/02/2006 |
04/07/2006 |
04/24/2006 |
07/24/2007 |
|
Cimarron |
SH-171 |
070180 |
2172104 |
SAB-113C(029)BF |
N |
K & R BUILDERS, INC. |
0.452 MI. GRADE, DRAIN, SURFACE & BRIDGE SH-171 OVER BEAVER RIVER APPROX. 4.5 MI. N. OF US-287. |
$3,991,193.90 |
$3,977,559.38 |
10/18/2007 |
11/05/2007 |
11/20/2007 |
11/27/2007 |
04/07/2008 |
09/23/2008 |
|
Cleveland |
CORD |
090132 |
2251704 |
BRF-114C(151)CO |
N |
BRIDGECO CONTRACTORS, INC. |
0.245 MI. CO.RD.;BRIDGE & APPROACHES;OVER TRIBUTARY OF SPRING CREEK, 1.2 MI. EAST OF NEEDMORE. |
$552,986.48 |
$0.00 |
02/19/2009 |
03/02/2009 |
03/16/2009 |
03/18/2009 |
06/01/2009 |
09/28/2009 |
|
Cleveland |
CT. ST. |
050688 |
1820704 |
STP-114D(044)AG |
N |
PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC |
0.3730 MI. BRIDGE & APPROACHES/ CT. ST.; 12TH AVE. OVER LITTLE RIVER, LOCATED BETWEEN TECUMSEH & FRANKLIN RDS. |
$1,275,075.61 |
$1,241,147.26 |
01/19/2006 |
02/13/2006 |
02/28/2006 |
03/14/2006 |
06/06/2006 |
10/01/2006 |
|
Cleveland |
CT. ST. |
070280 |
2202204 |
STP-114B(137)AG* |
N |
MUSKOGEE BRIDGE COMPANY, INC. |
*BPMY-114B(144)3B/ BRIDGE REDECKING & REHABILITATION ON 12TH STREET OVER I-35 IN MOORE. |
$1,450,560.75 |
$1,347,805.75 |
06/14/2007 |
07/16/2007 |
07/30/2007 |
08/09/2007 |
11/05/2007 |
02/02/2008 |
|
Cleveland |
CT.ST. |
070044 |
1706904 |
STP-114B(018)(046)AG |
N |
ALLEN CONTRACTING, INC. |
1.519 MI. GRADE, DRAIN & RESURFACE LINDSEY FROM OAKHURST TO 24TH AVE. / 24TH AVE. FROM IMHOFF TO LINDSEY IN NORMAN. |
$5,759,450.81 |
$5,572,210.08 |
04/19/2007 |
05/07/2007 |
05/22/2007 |
05/30/2007 |
09/03/2007 |
09/26/2008 |
|
Cleveland |
CT.ST. |
070416 |
2307104 |
STP-114B(163)AG* |
N |
TRAFFIC & LIGHTING SYSTEMS, LLC |
*IMY-35-2(298)112TR; 1.420 MI. TRAFFIC SIGNAL & LIGHTING INTERCONNECT TECUMSEH RD 36TH AVE NW E TO I-35 IN NORMAN. |
$729,109.97 |
$697,739.79 |
10/18/2007 |
11/05/2007 |
11/13/2007 |
11/27/2007 |
02/25/2008 |
05/24/2008 |
|
Cleveland |
CT.ST. |
080180 |
2211904 |
STP-114B(139)AG |
N |
RUDY CONSTRUCTION CO. |
0.37 MI. GRADE, DRAIN, SURFACE & TRAFFIC SIGNALS CITY STREET (36TH AVE. N.W.) BETWEEN ROBINSON ST. & MAIN ST. IN NORMAN. |
$2,645,494.08 |
$1,697,784.17 |
04/17/2008 |
04/25/2008 |
05/07/2008 |
05/19/2008 |
09/08/2008 |
02/14/2009 |
|
Cleveland |
CT.ST. |
080433 |
2554804 |
STP-114B(218)AG |
N |
PBX CORPORATION |
0.068 MI. CT.ST.; BRIDGE RE- PAIR, (ROBINSON ST.);BRIDGE OVER IS-35, IN THE CITY. |
$220,100.00 |
$89,204.83 |
09/18/2008 |
10/06/2008 |
10/23/2008 |
10/30/2008 |
03/02/2009 |
04/15/2009 |
|
Cleveland |
CT.ST. |
090050 |
1539207 |
IMY-0035-2(292)116 |
N |
OBC, INC. |
0.099 MI. CT.ST.;GRADE,DRAIN ,SURFACE & BRIDGE/CT.ST.(SO. 19TH ST.); OVER I-35, IN THE CITY OF MOORE. |
$1,290,397.40 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/12/2009 |
02/18/2009 |
02/18/2009 |
10/03/2009 |
|
Cleveland |
CT.ST. |
090051 |
2251804 |
STP-114C(152)AG |
N |
K & R BUILDERS, INC. |
0.179 MI. CT.ST./BRIDGE & APPROACHES;OVER NORTH FORK OF LITLE RIVER, 2.7 MI. EAST OF IS-35 IN THE CITY OF MOORE. |
$523,657.44 |
$0.00 |
02/19/2009 |
03/02/2009 |
03/09/2009 |
03/11/2009 |
07/06/2009 |
12/02/2009 |
|
Cleveland |
CTST |
070429 |
1439104 |
STPY-014B(378) |
N |
HASKELL LEMON CONSTRUCTION CO. |
1.920 MI GRD, DRN, SURF, & BR (TRAFF SIG) CITY ST (TECUMSEH RD) BEG APPROX 0.3 MI E OF 12TH AVE NW & EXT E IN NORMAN. |
$7,039,963.90 |
$6,828,612.52 |
11/15/2007 |
12/03/2007 |
12/17/2007 |
01/02/2008 |
04/07/2008 |
04/01/2009 |
|
Cleveland |
CTST |
080054 |
2208904 |
STP-114B(138)AG |
N |
HASKELL LEMON CONSTRUCTION CO. |
0.622 MI. GRADE, DRAIN, SURFACE & SIGNALS CITY ST. ON MAIN ST. BETWEEN CARTER AVE. & 12TH AVE. N.E. IN NORMAN. |
$3,283,061.20 |
$2,330,060.65 |
02/21/2008 |
03/03/2008 |
03/12/2008 |
03/24/2008 |
07/07/2008 |
02/11/2009 |
|
Cleveland |
IS-35 |
080461 |
0903405 |
SEC1702Y-114A(191)HP |
N |
HASKELL LEMON CONSTRUCTION CO. |
4.5 MI. IS-35; GRADE,DRAIN, SURFACE & BRIDGE/FROM 0.5 MI. NO. OF MAIN ST.,EXTEND NORTH. |
$35,304,952.60 |
$1,941,552.96 |
12/18/2008 |
01/05/2009 |
01/09/2009 |
01/13/2009 |
03/02/2009 |
10/22/2010 |
|
Cleveland |
SH-77H |
090018 |
2599904 |
SSR-114C(231)(232)SR |
N |
VANCE BROTHERS, INC. |
10.111 MI. SH-77H;RESURFACE (MICROSURFACE)BEGIN AT RO- BINSON ST. & EXTEND NORTH. BEGIN @ S.E. 149TH ST. |
$1,092,917.32 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/20/2009 |
02/24/2009 |
|
|
|
Coal |
CO.RD. |
080434 |
1930504 |
BRO-115D(019) CO |
N |
BRIDGECO CONTRACTORS, INC. |
0.236 MI. BRIDGE & APPROACHES COUNTY ROAD (NS-371) OVER LEADER CRK. 3.6 MI. N. & 0.9 MI. E. OF TUPELO. |
$391,204.60 |
$281,528.70 |
09/18/2008 |
10/06/2008 |
10/21/2008 |
10/29/2008 |
02/02/2009 |
05/02/2009 |
|
Coal |
SH-31 |
090065 |
2473504 |
STPY-115C(071)3R |
N |
THE CUMMINS CONSTRUCTION CO., INC. |
7.00 MI. SH-31; RESURFACE (ASPHALT)FROM 6.6 MI. NORTH OFSH-31, EXTEND NORTH. |
$1,031,099.05 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/18/2009 |
02/24/2009 |
|
07/31/2009 |
|
Comanche |
CO.RD. |
080358 |
2308904 |
CIRB-116D(133)RB |
N |
BRUTON CONSTRUCTION CO., INC. |
0.395 MI. CO.RD.; BRIDGE & APPROACHES;OVER BEAVER CR., 1 .0 MI. EAST & 3.0 MI. NORTH OF JCT SH-65/SH-17. |
$1,100,793.00 |
$167,475.13 |
11/20/2008 |
12/08/2008 |
12/29/2008 |
12/31/2008 |
03/02/2009 |
08/08/2009 |
|
Comanche |
CORD |
080113 |
2000804 |
BRO-116D(080)CO |
N |
SEWELL BROTHERS, INC. |
0.212 MI. GRADE, DRAIN, SURFACE & BRIDGE CO. RD. (EW-163) OVER SANDY CRK. APPROX. 2.0 MI. N. & 2.4 MI. W. OF INDIAHOMA |
$582,929.40 |
$582,542.14 |
02/21/2008 |
03/03/2008 |
03/17/2008 |
03/24/2008 |
06/02/2008 |
09/29/2008 |
|
Comanche |
CORD |
080209 |
2420104 |
STP-116C(146)CO |
N |
T & G CONSTRUCTION, INC. |
2.760 MI RESURFACE (ASPHALT) COUNTY RD. (EW-165) ON CACHE RD. FROM NS-247 EXTEND EAST. |
$1,040,232.48 |
$650,768.61 |
08/21/2008 |
09/19/2008 |
10/02/2008 |
10/07/2008 |
12/01/2008 |
01/14/2009 |
|
Comanche |
CT.ST. |
080435 |
2341104 |
STP-116B(138)MS |
N |
DUIT CONSTRUCTION COMPANY, INC. |
1.027 MI. CT.ST./GRADE,DRAIN ,SURFACE,BRIDGE & SIGNALIZA- TION;FROM CACHE RD. TO ROGERS LANE, IN THE CT.OF LAWTON. |
$4,889,495.46 |
$121,797.39 |
09/18/2008 |
10/06/2008 |
10/20/2008 |
10/22/2008 |
03/02/2009 |
11/26/2009 |
|
Comanche |
CT.ST. |
060208 |
1848905 |
STP-116B(125)MS |
N |
ALLEN CONTRACTING, INC. |
0.968 MI. GRADE, DRAIN, SURFACE AND BRIDGE FLOWER MOUND RD. FROM CACHE RD. EXTEND NORTH TO RODGERS LANE IN LAWTON. |
$4,172,361.08 |
$4,139,002.95 |
05/18/2006 |
06/05/2006 |
06/21/2006 |
07/10/2006 |
10/02/2006 |
08/07/2007 |
|
Comanche |
I-44 |
080135 |
2029904 |
BRIY-0044-1(069)043 |
N |
SEWELL BROTHERS, INC. |
0.376 MI. BRIDGE & APPROACHES I-44 BRIDGES AT MEDICINE BLUFF CRK. APPROX. 2.0 MI. N. OF US-62. |
$4,794,148.08 |
$3,090,807.35 |
03/20/2008 |
04/07/2008 |
04/18/2008 |
05/05/2008 |
08/04/2008 |
05/30/2009 |
|
Comanche |
SH-115 |
070335 |
2440004 |
BPMY-116N(147)3B |
N |
GIBSON & ASSOCIATES, INC. |
0.00 MI. JOINY SEAL/REPAIR SH-115/US-62/SH-36 AT VARIOUS LOCATIONS IN COMANCHEE CO. |
$164,952.50 |
$164,952.50 |
08/16/2007 |
09/10/2007 |
09/25/2007 |
10/04/2007 |
01/07/2008 |
04/25/2008 |
|
Comanche |
SH-49 |
040049 |
1016707 |
STPY-116C(001) |
N |
SEWELL BROTHERS, INC. |
5.224 KM. GR. DR. SURF. SH-49:BEGIN AT SH-58 & EXTEND EAST (RECONSTRUCTION OF EXISTING LANES) |
$6,799,614.53 |
$6,234,210.66 |
01/22/2004 |
02/02/2004 |
02/12/2004 |
03/03/2004 |
03/22/2004 |
01/15/2005 |
|
Comanche |
US-277 |
070136 |
2023504 |
STPY-116C(081)SS |
N |
T & G CONSTRUCTION, INC. |
3.301 MI. GRADE, DRAIN & SURFACE US-277 FROM 6.5 MI. S. OF THE CADDO COUNTY LINE & EXTEND NORTH. |
$4,774,065.40 |
$5,154,065.96 |
07/19/2007 |
08/06/2007 |
08/24/2007 |
11/09/2007 |
12/03/2007 |
05/30/2008 |
|
Comanche |
US-277 |
070433 |
2023508 |
STPY-116C(144) |
N |
T & G CONSTRUCTION, INC. |
3.200 MI. GRADE, DRAIN & SURFACE US-277 BEGIN APPROX. 3.2 MI. S. OF CADDO COUNTY LINE & EXTEND NORTH. |
$4,188,906.16 |
$2,398,861.62 |
01/17/2008 |
02/04/2008 |
02/21/2008 |
03/03/2008 |
06/02/2008 |
01/27/2009 |
|
Comanche |
US-62 |
070085 |
2103204 |
ITSY-QT80(26)IT/STPG-116* |
N |
TELCO SUPPLY COMPANY |
*C(141)TR/0.00 MI SFTY IMPROV (ITS INTGRTN)(CCTV CAMERA) VAR LOCS US-62(ROGERS LN)/I-44 & APACHE GATE IN LAWTON. |
$445,496.35 |
$465,457.34 |
07/19/2007 |
08/06/2007 |
08/20/2007 |
08/23/2007 |
11/21/2007 |
04/18/2008 |
|
Cotton |
CORD |
080222 |
2371204 |
BRO-117D(052)CO |
N |
BRUTON CONSTRUCTION CO., INC. |
0.132 MI. BRIDGE & APPROACHES COUNTY RD. OVER BRUSH CRK. ON EW-181 1.1 MI. E. OF TILLMAN COUNTY LINE. |
$261,620.00 |
$268,149.94 |
05/15/2008 |
06/02/2008 |
06/18/2008 |
06/26/2008 |
10/06/2008 |
01/03/2009 |
|
Cotton |
SH-5 |
090066 |
2625304 |
STPY-117B(085)3R |
N |
T & G CONSTRUCTION, INC. |
5.20 MI. SH-5;RESURFACE ( ASPHALT)BEGIN 0.2 MI. E. OF I-44, EXT EAST TO SH-53. |
$1,246,058.00 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/20/2009 |
02/26/2009 |
|
07/31/2009 |
|
Craig |
CORD |
080271 |
2247404 |
BRF-118C(066)CO* |
N |
BEACHNER CONSTRUCTION CO., INC. |
/BRO-158D(63)CO/0.658 MI. CO.RD.;GRADE,DRAIN,SURFACE, BRIDGE & APPROACHES;ON EXCELSIOR AVE. OVER BULL CR. |
$1,863,693.90 |
$1,055,470.46 |
06/19/2008 |
07/14/2008 |
07/22/2008 |
08/13/2008 |
11/03/2008 |
07/30/2009 |
|
Craig |
SH-10 |
080412 |
1232504 |
BRFY-018C(125) |
N |
BELK BRIDGE, INC. |
0.0770 MI. SH-10/BRIDGE & APPROACHES;OVER BRUSH CREEK, 1.2 MI. EAST OF NOWATA COUNTY LINE. |
$1,798,006.95 |
$326,931.29 |
09/18/2008 |
10/06/2008 |
10/20/2008 |
10/22/2008 |
02/02/2009 |
09/29/2009 |
|
Craig |
US-60 |
090036 |
1622904 |
BRFY-018N(009)DC |
N |
BECCO CONTRACTORS, INC. |
0.590 MI.;US-60;GRADE,DRAIN , SURFACE & BRIDGE. |
$5,381,584.57 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/11/2009 |
02/17/2009 |
04/13/2009 |
11/08/2009 |
|
Creek |
CO.RD. |
080359 |
2275104 |
ACBRO-119D(130)CO |
N |
BRIDGECO CONTRACTORS, INC. |
0.473 MI. CO.RD.; BRIDGE & APPROACHES; OVER LITTLE DEEP FORK CR., 1.5 MI. SOUTH & 1.0 MI. WEST OF BRISTOW. |
$770,235.00 |
$377,626.27 |
11/20/2008 |
12/08/2008 |
12/23/2008 |
12/31/2008 |
04/06/2009 |
10/02/2009 |
|
Creek |
CORD |
080056 |
2214504 |
STP-119C(122)IG |
N |
BECCO CONTRACTORS, INC. |
1.254 MI. CO.RD.;GRADE,DRAIN ,SURFACE,BRIDGE(SO. 49TH W. AVE.)FROM NO. OF THE CR. TURNPIKE,EXTEND NO. TO 91ST. |
$4,372,114.25 |
$1,855,877.91 |
01/17/2008 |
02/04/2008 |
02/12/2008 |
04/25/2008 |
07/07/2008 |
03/03/2009 |
|
Creek |
SH-48 |
070365 |
2028604 |
SAB-119C(083)BF |
N |
BECCO CONTRACTORS, INC. |
0.503 MI. SH-48;BRIDGE & APPROACHES/OVER WEST FORK OF SANDY CR., 6.6 MI. NORTH OF OKFUSKEE C/L. |
$2,377,921.75 |
$885,565.84 |
10/18/2007 |
11/05/2007 |
11/15/2007 |
11/20/2007 |
04/07/2008 |
12/02/2008 |
|
Creek |
SH-66 |
070338 |
1015704 |
STPY-019A(314)BF |
N |
BECCO CONTRACTORS, INC. |
1.461 MI. GRADE, DRAIN, BRIDGE, SIGNALS, EROSION CONTROL & SURFACE SH-66 FROM SH-117 ON W. EDGE OF SAPULPA & EXTEND E. |
$8,991,481.69 |
$8,806,223.69 |
10/18/2007 |
11/05/2007 |
11/15/2007 |
01/31/2008 |
03/03/2008 |
06/10/2009 |
|
Creek |
SH-97 |
080326 |
2503304 |
HSIPY-119C(171)TR |
N |
TRAFFIC & LIGHTING SYSTEMS, LLC |
0.00 MI. SH-97;STRIPING & TRAFFIC SIGNAL, AT LINE AVENUE IN SAPULPA. |
$103,694.45 |
$103,690.85 |
08/21/2008 |
09/19/2008 |
09/29/2008 |
10/02/2008 |
01/05/2009 |
03/03/2009 |
|
Custer |
CORD |
070115 |
2200504 |
BRO-120D(102)CO |
N |
MUNOZ CONSTRUCTION CO., INC. |
0.198 MI. BRIDGE & APPROACHES COUNTY RD. OVER WEST BARNITZ CRK. 3.0 MI. W. & 11.0 MI. N. OF BUTLER. |
$330,305.16 |
$324,895.43 |
03/15/2007 |
04/02/2007 |
04/16/2007 |
04/24/2007 |
05/28/2007 |
09/24/2007 |
|
Custer |
CORD |
080213 |
2200704 |
BRF-120C(104)CO |
N |
SEWELL BROTHERS, INC. |
0.142 MI. BRIDGE & APPROACHES COUNTY RD. (NS-236) OVER ROUGH CRK 2.5 MI. W. & 4.4 MI. N. OF THOMAS. |
$531,866.28 |
$582,585.76 |
03/20/2008 |
04/07/2008 |
04/18/2008 |
05/15/2008 |
06/23/2008 |
10/20/2008 |
|
Custer |
I-40 |
070339 |
2407904 |
SSP-120C(121)SS |
N |
MIDSTATE TRAFFIC CONTROL, INC. |
12.9 MI. CABLE BARRIER PROJECT I-40 FROM MILEPOST 61.9 TO MILEPOST 82. |
$1,799,725.89 |
$1,943,475.49 |
08/16/2007 |
09/10/2007 |
09/25/2007 |
10/02/2007 |
11/05/2007 |
03/03/2008 |
|
Custer |
SH-34 |
080072 |
1877904 |
STPY-120B(050) |
N |
CORNELL CONSTRUCTION COMPANY, INC. |
6.4730 MI. SH-34;GRADE,DRAIN & EROSION CONTROL. BEGIN APROX5.0 MI. SO. OF CUSTER/DEWEY COUNTY LINE,EXTEND NO. |
$3,327,593.55 |
$649,151.56 |
03/20/2008 |
04/07/2008 |
04/16/2008 |
04/25/2008 |
08/04/2008 |
03/06/2009 |
|
Custer |
SH-54 |
080243 |
2463604 |
SBR-120B(147)SB |
N |
CIMARRON CONSTRUCTION COMPANY |
0.00 MI. BRIDGE REDECKING & REHABILITATION SH-54 OVER LITTLE DEEP CRK. 4.4 MI. N. OF THE WASHITA COUNTY LINE. |
$707,918.50 |
$664,590.35 |
07/24/2008 |
08/12/2008 |
08/27/2008 |
09/02/2008 |
01/05/2009 |
04/04/2009 |
|
Custer |
SH-73 |
080074 |
2493804 |
STPY-120C(159) 3R |
N |
CASWELL CONTRACTING, INC. |
7.370 MI. RESURFACE (OVERLAY) SH-73 BEGIN AT SH-34 & EXTEND EAST. |
$712,563.80 |
$911,586.11 |
02/21/2008 |
03/03/2008 |
03/17/2008 |
03/24/2008 |
07/07/2008 |
08/25/2008 |
|
Custer |
SH-73 |
090043 |
2516404 |
STPY-120C(161)3R |
N |
CASWELL CONTRACTING, INC. |
4.50 MI. RESURFACE(ASPHALT) BEGIN 7.38 MI. E. OF THE SH-34JCT, EXTEND EAST. |
$568,611.54 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/18/2009 |
02/27/2009 |
04/06/2009 |
05/05/2009 |
|
Custer |
US-183 |
070178 |
0207704 |
NHY-009N(008) |
N |
WITTWER CONSTRUCTION CO., INC. |
0.888 MI. GRADE, DRAIN, SURFACE & BRIDGE US-183 BEGIN @ I-40 EXTEND N. TO I-40B IN CLINTON. |
$9,472,045.00 |
$9,583,525.28 |
05/17/2007 |
06/04/2007 |
06/20/2007 |
08/10/2007 |
10/01/2007 |
07/26/2008 |
|
Delaware |
US-59 |
080002 |
1501504 |
STPY-021B(273) |
N |
KOSS CONSTRUCTION COMPANY & SUBSIDIARY |
4.66 MI. US-59;WIDEN & RE- SURFACE/FROM 1.48 MI. N.W. OF THE US-59/SH-25 JCT IN GROVE. |
$17,356,640.46 |
$2,647,462.37 |
07/24/2008 |
08/12/2008 |
08/27/2008 |
09/18/2008 |
10/27/2008 |
10/21/2009 |
|
Delaware |
US-60 |
090079 |
2613004 |
STPY-121B(125)3R/STPY-* |
N |
GLOVER & ASSOCIATES, INC. |
*158B(158)3R/ 7.330 MI. RESURFACE (ASPHALT) US-60 FROM SH-85 IN DELAWARE COUNTY EXTEND N. TO US-59 IN OTTAWA COUNTY. |
$1,039,178.30 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/19/2009 |
02/23/2009 |
|
07/31/2009 |
|
Dewey |
SH-3 |
080340 |
1767105 |
NHY-017N(069) |
N |
J & R SAND COMPANY, INC. |
1.174 MI. SH-3/US-270/GRADE DRAIN SURFACE & BRIDGE;BEGIN 0.2 MI. S. OF THE SH-51 JCT, EXTEND S.E. |
$3,656,949.33 |
$229,331.42 |
09/18/2008 |
10/06/2008 |
10/21/2008 |
10/28/2008 |
02/02/2009 |
08/30/2009 |
|
Dewey |
SH-34 |
080262 |
2081405 |
BRFY-122B(035) |
N |
PBX CORPORATION |
0.550 MI. SH-34;JOINT SEAL/ REPAIR,OVER THE SO. CANADIAN RIVER, 13.5 MI. NO. OF THE CUSTER COUNTYLINE. |
$876,902.50 |
$575,471.63 |
06/19/2008 |
07/14/2008 |
07/24/2008 |
07/25/2008 |
11/03/2008 |
04/01/2009 |
|
Dewey |
US-270 |
070173 |
1767104 |
NHY-017N(068) |
N |
J & R SAND COMPANY, INC. |
3.398 MI. GRADE, DRAIN, SURFACE & BRIDGE US-270 BEGIN AT DEWEY/MAJOR COUNTY LINE & EXTEND SOUTHEAST. |
$12,105,844.54 |
$14,019,267.68 |
06/14/2007 |
07/16/2007 |
07/30/2007 |
08/09/2007 |
11/05/2007 |
01/27/2009 |
|
Ellis |
CORD |
080033 |
2306504 |
BRO-123D(047)CO |
N |
SEWELL BROTHERS, INC. |
0.207 MI. BRIDGE & APPROACHES COUNTY RD. OVER COMMISSION CRK. 12.3 MI. W. & 3.4 MI. S. OF ARNETT ON NS-169. |
$368,355.90 |
$367,203.05 |
02/21/2008 |
03/03/2008 |
03/12/2008 |
03/24/2008 |
07/07/2008 |
11/03/2008 |
|
Ellis |
US-283 |
090101 |
2094204 |
SSP-123B(030)SS |
N |
SEWELL BROTHERS, INC. |
1.280 MI. US-283;BRIDGE & APPROACHES/ OVER WOLF CREEK, NORTH OF SHATTUCK. |
$6,597,222.13 |
$0.00 |
02/19/2009 |
03/02/2009 |
03/10/2009 |
03/12/2009 |
07/06/2009 |
03/17/2010 |
|
Garfield |
CT.ST. |
080311 |
2393004 |
STP-124C(101)MS |
N |
DUIT CONSTRUCTION COMPANY, INC. |
0.901 MI. GRADE, DRAIN & SURFACE CITY ST. ON WHEAT CAPITAL RD. FROM 1.0 MI. W. OF US-81 EXTEND EAST. |
$2,463,301.12 |
$1,841,726.20 |
07/24/2008 |
08/12/2008 |
08/15/2008 |
09/04/2008 |
12/01/2008 |
05/29/2009 |
|
Garfield |
SH-15 |
080402 |
2085504 |
BRFY-124C(045)/BRFY-052C* |
N |
PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV) |
*(204)/ 1.04 MI. GRD, DRN, SURF, BR & ERSN CNTRL SH-15 7.8 MI N OF US-64/SH-15 2.8 MI E OF GARFIELD COUNTY LINE. |
$7,176,188.58 |
$1,824,014.62 |
08/21/2008 |
09/19/2008 |
09/30/2008 |
10/02/2008 |
01/05/2009 |
01/29/2010 |
|
Garfield |
SH-74 |
080342 |
2097505 |
BPMY-124C(119)3B |
N |
PARADIGM CONSTRUCTION & ENGINEERING, INC |
0.00 MI. SH-74/SH-15; JOINT /SEAL REPAIR.AT VARIOUS LOCATIONS IN DIV. IV. |
$81,681.75 |
$0.00 |
09/18/2008 |
10/06/2008 |
10/20/2008 |
10/22/2008 |
03/02/2009 |
04/30/2009 |
|
Garvin |
CORD |
080224 |
2364204 |
BRO-125D(144)CO |
N |
K & R BUILDERS, INC. |
0.208 MI. BRIDGE & APPROACHES COUNTY RD. OVER SALT CRK. 2.3 MI. W. & 3.3 MI. N. OF SH-7/SH-74 JCT. |
$804,111.24 |
$804,501.39 |
05/15/2008 |
06/02/2008 |
06/13/2008 |
06/30/2008 |
08/04/2008 |
12/31/2008 |
|
Garvin |
I-35 |
070124 |
1800105 |
IMY-35-2(262)67/IMY* |
N |
PBX CORPORATION |
-40-5(353)196/BHIY-35-2(264)77/NHY-21N(24)/NHY-17N(104)(105)/0.00 MI. JOINT SEAL/REPAIR VARIOUS LOCATIONS IN DIV. 3. |
$488,377.00 |
$541,919.46 |
04/19/2007 |
05/07/2007 |
05/22/2007 |
05/30/2007 |
09/03/2007 |
01/30/2008 |
|
Garvin |
I-35 |
080160 |
1800305 |
IMY-35-2(265)74/BHIY-35-* |
N |
PBX CORPORATION |
*2(267)70/IMY-40-5(359)211/BHFY-125C(82) JOINT SEAL & REPAIR I-40/I-35/SH-59B AT VARIOUS LOCATIONS IN DIVISION 3. |
$418,902.00 |
$360,957.25 |
04/17/2008 |
04/25/2008 |
05/12/2008 |
05/19/2008 |
09/08/2008 |
02/19/2009 |
|
Grady |
CORD |
080123 |
2542904 |
BRO-126D(163)CO |
N |
K & R BUILDERS, INC. |
0.247 MI. CO.RD.;BRIDGE & APPROACHES/OVER WASHITA RIVER,0.5 MI. NO. & 0.25 MI. WEST OF VERDEN. |
$1,417,092.04 |
$1,389,207.38 |
02/21/2008 |
03/03/2008 |
03/12/2008 |
04/02/2008 |
05/05/2008 |
09/01/2008 |
|
Grady |
CORD |
080272 |
2313704 |
BRO-126D(109)CO |
N |
D. M. DOZERS, INC. |
0.167 MI.,CO.RD.; BRIDGE & APPROACHES/OVER WEST CR., APPROX. 2.0 MI. NO. OF JCT. SH-37/SH-92 IN TUTTLE. |
$474,674.58 |
$449,764.72 |
06/19/2008 |
07/14/2008 |
08/05/2008 |
08/07/2008 |
10/06/2008 |
01/03/2009 |
|
Grady |
SH-37 |
080204 |
2506404 |
SBR-126C(137)SB |
N |
K & R BUILDERS, INC. |
0.00 MI. SH-37; BRIDGE REPR. OVER AN UNNAMED CREEK, APPROX.0.7 MI. W. OF SH-92. |
$398,217.00 |
$390,209.16 |
04/17/2008 |
04/25/2008 |
05/07/2008 |
05/09/2008 |
09/08/2008 |
12/06/2008 |
|
Grady |
SH-39 |
080374 |
2023304 |
STPY-126B(057) |
N |
SEWELL BROTHERS, INC. |
2.99 MI. GRADE, DRAIN, SURFACE AND BRIDGE SH-39 FROM 0.87 MI. EAST OF US-62 AND ESTEND EAST. |
$6,290,136.44 |
$1,035,421.01 |
11/20/2008 |
12/08/2008 |
12/18/2008 |
12/30/2008 |
04/06/2009 |
01/10/2010 |
|
Grady |
SH-4 |
090080 |
2502404 |
STPY-126C(135)3R |
N |
T & G CONSTRUCTION, INC. |
0.98 MI. SH-4;RESURFACE (ASPHALT)BEGIN 1.0 MI. SO. OF SH-37 JCT. EXT. NORTH (ADD ALT SH-92;BEG. 0.4 MI. SO |
$341,142.05 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/20/2009 |
02/26/2009 |
|
07/31/2009 |
|
Grady |
US-62 |
080424 |
2501704 |
SSR-126B(134)SR |
N |
M.J. LEE CONSTRUCTION COMPANY |
0.130 MI. US-62; BANK PRO- TECTION/ EAST OF NS-283 AT R/R OVERPASS. |
$441,946.40 |
$428,745.68 |
09/18/2008 |
10/06/2008 |
10/23/2008 |
10/28/2008 |
02/02/2009 |
04/02/2009 |
|
Grady |
US-81 |
080465 |
2451504 |
SSP-126N(120)(121)SS |
N |
PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC |
0.180 MI. BRIDGE REDECKING & REHABILITATION US-81 OVER LITTLE WASHITA RVR. 1.0 MI. S. OF SH-19 (N.& S.BOUND LANES). |
$2,739,899.48 |
$0.00 |
09/18/2008 |
10/06/2008 |
10/20/2008 |
10/22/2008 |
03/16/2009 |
10/01/2009 |
|
Grady |
US-81 |
090022 |
2614204 |
CMC-126A(173) |
N |
T & G CONSTRUCTION, INC. |
1.620 MI. US-81; RESURFACE (ASPHALT) BEGIN 17.29 MI. NO. OF US-62, EXT. NORTH. |
$462,607.50 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/20/2009 |
02/26/2009 |
|
06/30/2009 |
|
Grant |
CORD |
070435 |
2289204 |
BRF-127C(085)CO |
N |
REECE CONSTRUCTION CO., INC. |
0.264 MI. BRIDGE & APPROACHES COUNTY RD. (EW-2) OVER CROOKED CRK. APPROX. 0.7 MI. S. & 6.2 MI. E. OF MANCHESTER. |
$405,269.08 |
$378,804.94 |
11/15/2007 |
12/03/2007 |
12/17/2007 |
01/08/2008 |
04/07/2008 |
07/05/2008 |
|
Grant |
SH-132 |
080263 |
1044604 |
BRFY-027C(241) |
N |
MUSKOGEE BRIDGE COMPANY, INC. |
0.387 MI. SH-132;GRADE, DRAIN,SURFACE,& BRIDGE/OVER SALT FORK OF THE ARKANSAS RIVER, 2.79 MI. N. OF US-64. |
$3,268,845.82 |
$933,329.19 |
09/18/2008 |
10/06/2008 |
10/21/2008 |
11/12/2008 |
01/05/2009 |
06/03/2009 |
|
Grant |
US-64 |
070218 |
2185004 |
BRFY-127C(061)BF |
N |
PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC |
0.731 MI. GRADE, DRAIN, SURFACING, BRIDGE & APPROACHES US-64 OVER UNNAMED CRK. 1.1 MI. E. OF THE ALFALFA COUNTY LINE. |
$3,459,978.04 |
$3,207,389.62 |
08/16/2007 |
09/10/2007 |
09/24/2007 |
10/05/2007 |
01/07/2008 |
10/02/2008 |
|
Greer |
CORD |
080047 |
2165004 |
BRO-128D(058)CO |
N |
K & R BUILDERS, INC. |
0.127 MI. BRIDGE & APPROACHES CO. RD. (NS-188) OVER SLEEPY JOHN CRK. 4.0 MI. E. & 3.6 MI. N. OF REED. |
$422,746.90 |
$387,148.16 |
01/17/2008 |
02/04/2008 |
02/19/2008 |
03/17/2008 |
05/05/2008 |
09/01/2008 |
|
Greer |
SH-6 |
080136 |
1010107 |
STPY-128B(006) |
N |
CORNELL CONSTRUCTION COMPANY, INC. |
5.990 KM SURFACE SH-6 BEGIN 5.0 MI. N. OF THE SH-6/SH-9 JCT. & EXTEND N. ON NEW ALIGNMENT. |
$8,403,903.39 |
$3,634,054.16 |
04/17/2008 |
04/25/2008 |
05/07/2008 |
05/09/2008 |
06/16/2008 |
04/11/2009 |
|
Greer |
SH-9 |
090094 |
2622704 |
SSR-128C(077)(78)SR |
N |
CASWELL CONTRACTING, INC. |
9.0 MI. SH-9;RESURFACE ( ASPHALT) BEGIN AT US-283 & EX-TEND EAST THRU GRANITE. BEGIN 8.0 MI. E. OF US-283. |
$1,379,493.88 |
$0.00 |
01/22/2009 |
02/02/2009 |
03/03/2009 |
03/06/2009 |
07/06/2009 |
08/19/2009 |
|
Harmon |
CO.RD. |
080439 |
2108304 |
BRO-NBIL(024)CO |
N |
WITTWER CONSTRUCTION CO., INC. |
0.189 MI. BRIDGE & APPROACHES COUNTY RD. (EW-158) 3.0 MI. N. & 2.3 MI. E. OF HOLLIS. |
$276,201.03 |
$274,618.42 |
09/18/2008 |
10/06/2008 |
10/14/2008 |
10/16/2008 |
02/02/2009 |
05/02/2009 |
|
Harmon |
CORD |
080256 |
2493904 |
STP-129C(037)DC |
N |
CORNELL CONSTRUCTION COMPANY, INC. |
8.002 MI. GRADE & DRAIN COUNTY RD. (NS-183) BEG. US-62 EXT. S. TO EW-168 THEN TO NS-184 E. THEN EXT. S. ON NS-184. |
$1,100,457.50 |
$1,183,356.50 |
04/17/2008 |
04/25/2008 |
05/05/2008 |
05/09/2008 |
06/16/2008 |
11/12/2008 |
|
Harper |
CO.RD. |
090030 |
2254104 |
BRO-130D(095)CO |
N |
OBC, INC. |
0.179 MI. CO.RD. BRIDGE & APPROACHES;OVER AN UNNAMED CR.LOCATED 7.5 MI. SO. & 1.4 MI. E. OF SELMAN. |
$417,363.70 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/12/2009 |
02/18/2009 |
05/04/2009 |
08/31/2009 |
|
Harper |
SH-3 |
080440 |
2327505 |
BRFY-130F(129) |
N |
JLT CONTRACTING, LLC |
0.00 MI. BRIDGE REPAIR (FLOOD COATING) SH-3/US-270/US-412/SH-8 AT VARIOUS LOCATIONS IN DIVISION 6. |
$82,973.30 |
$59,990.46 |
09/18/2008 |
10/06/2008 |
10/23/2008 |
10/28/2008 |
03/02/2009 |
04/01/2009 |
|
Harper |
US-283 |
070207 |
2094404 |
BRFY-130B(063)BF |
N |
PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC |
0.284 MI. GRADE, DRAIN SURFACE & BRIDGE US-283 HIGHWAY OVER SPRING CRK. 2 MI. N. OF US-270 JCT. |
$1,995,257.26 |
$2,014,722.49 |
07/19/2007 |
08/06/2007 |
08/17/2007 |
08/21/2007 |
12/03/2007 |
06/04/2008 |
|
Harper |
US-64 |
080327 |
2094604 |
BRFY-130B(069) |
N |
WITTWER CONSTRUCTION CO., INC. |
0.188 MI. GRADE, SURFACE, EROSION CONTROL & BRIDGE US-64 OVER BADGER CRK. 5.2 MI. E. OF US-183 JCT. |
$1,480,692.88 |
$216,200.79 |
10/16/2008 |
11/03/2008 |
11/19/2008 |
11/25/2008 |
03/02/2009 |
05/30/2009 |
|
Harper |
US64 |
060424 |
1886804 |
BRFY-130B (042) |
N |
MUNOZ CONSTRUCTION CO., INC. |
0.397 MI. BRIDGE & APPROACHES US-64 OVER BUFFALO CRK. 14.4 MI. E. OF BEAVER COUNTY LINE. |
$13,591.22 |
$2,052,740.32 |
11/16/2006 |
12/04/2006 |
12/18/2006 |
01/24/2007 |
04/02/2007 |
10/18/2007 |
|
Haskell |
CORD |
090138 |
2492704 |
BRO-131D(084)CO |
N |
GLOVER & ASSOCIATES, INC. |
0.189 MI. CO.RD./BRIDGE & APPROACHES;OVER BEAR CREEK, 3.0 MI. SO. & 3.4 MI. WEST OF SH-9/SH-71 JCT. |
$313,608.36 |
$0.00 |
02/19/2009 |
03/02/2009 |
03/16/2009 |
03/18/2009 |
06/01/2009 |
08/29/2009 |
|
Haskell |
SH-31 |
090158 |
2478804 |
BHFY-131C(083)* |
N |
PBX CORPORATION |
*/SBR-131C(76)SB / SH-31; BRIDGE REHABILITATION;OVER SANBOIS CR. 2.3 MI. EAST OF SH-2, & OVER TURKEY CR. 8.6 MI |
$1,540,786.75 |
$0.00 |
02/19/2009 |
03/02/2009 |
03/17/2009 |
03/20/2009 |
08/03/2009 |
02/28/2010 |
|
Haskell |
SH-71 |
070399 |
1765604 |
SAB-131C(022)BF* |
N |
PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC |
*SAB-168C(161)BF/ 0.161 MI BR. & APPRS. SH-71/EMACHAYA CRK. 1.7 MI. S. SH-9/SH-141; SH-71/COOK CRK. 4.6 MI. E. OF US-59. |
$1,657,247.58 |
$1,786,410.11 |
10/18/2007 |
11/05/2007 |
11/20/2007 |
11/27/2007 |
05/05/2008 |
10/31/2008 |
|
Haskell |
SH-9 |
090136 |
2310304 |
SSP-NBIP(355)SS |
N |
SEMINOLE EQUIPMENT, INC. |
0.00 MI. SH-9; BRIDGE PAINT- ING; OVER SANS BOIS CREEK, 15 MI. EAST OF SH-2 JCT. |
$356,036.70 |
$0.00 |
02/19/2009 |
03/02/2009 |
|
|
|
|
|
Hughes |
CORD |
080273 |
2193304 |
BRO-132D(083)CO |
N |
D. M. DOZERS, INC. |
0.349 MI. GRADE, DRAIN, SURFACE & BRIDGE COUNTY RD. OVER ELM CRK. 0.1 MI. N. & 4.3 MI. E. OF YEAGER. |
$668,823.40 |
$628,331.67 |
06/19/2008 |
07/14/2008 |
08/05/2008 |
08/12/2008 |
10/06/2008 |
02/02/2009 |
|
Hughes |
SH-31 |
090081 |
2595404 |
STPY-132C(121)3R |
N |
THE CUMMINS CONSTRUCTION CO., INC. |
7.130 MI. SH-31;RESURFACE (ASPHALT)BEGIN 2.0 MI. SOUTH OF JCT. SH-31/SH-31A, EX- TEND NORTH TO SH-1. |
$1,262,313.74 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/18/2009 |
02/24/2009 |
|
07/31/2009 |
|
Hughes |
SH-48 |
080265 |
0650504 |
SSP-032C(181)SS |
N |
M.J. LEE CONSTRUCTION COMPANY |
0.492 MI. GRADE, DRAIN, SURFACE, BRIDGE & EROSION CONTROL PLAN SH-48 WEWOKA CRK. & OVERFLOW N. OF HOLDENVILLE. |
$3,004,880.09 |
$2,998,239.38 |
06/19/2008 |
07/14/2008 |
07/23/2008 |
07/25/2008 |
11/03/2008 |
11/03/2008 |
|
Hughes |
SH-48 |
090144 |
2463904 |
SBR-132C(105)(106)SB |
N |
LOGOS CONSTRUCTION COMPANY |
0.287 MI. SH-48;OVER LONG GEORGE CR., 8.9 MI. NO. OF US-270.SH-9;OVER LONG GEORGE CR., 0.92 MI. E. OF SEMINOLE |
$792,607.12 |
$0.00 |
02/19/2009 |
03/02/2009 |
03/16/2009 |
03/17/2009 |
07/06/2009 |
11/02/2009 |
|
Hughes |
US-75 |
080174 |
2451604 |
SBR-132N(102)(103)SB |
N |
PBX CORPORATION |
0.210 MI. BRIDGE REHAB. US-75/CRI&P RR APPROX. 0.1 MI. N. US-270. US-75/US-270 & ABANDONED RR IN CALVIN. |
$1,336,053.25 |
$879,352.33 |
03/20/2008 |
04/07/2008 |
04/18/2008 |
05/02/2008 |
08/04/2008 |
01/30/2009 |
|
Jackson |
CO.RD. |
080367 |
2353404 |
CIRB-133C(071)RB |
N |
K & R BUILDERS, INC. |
0.426 MI. CO.RD.; BRIDGE & APPROACHES; OVER THE SALT FORKOF THE RED RIVER, 2.0 MI. WEST OF MARTHA. |
$2,037,928.28 |
$0.00 |
11/20/2008 |
12/08/2008 |
|
01/12/2009 |
|
|
|
Jackson |
CORD |
080457 |
2353504 |
BRF-133C(072)CO/BRO-133D* |
N |
SEWELL BROTHERS, INC. |
*(73)CO/ 0.33 MI. CO.RD. BRIDGE & APPROACHES/OVER UN- NAMED CR., 7.0 MI. S & 0.2 MI.E OF US-62/US-283 JCT. |
$696,742.00 |
$34,131.04 |
10/16/2008 |
11/03/2008 |
11/13/2008 |
11/20/2008 |
03/02/2009 |
09/27/2009 |
|
Jefferson |
CORD |
080107 |
2182704 |
CIRB-134C(050)RB |
N |
OBC, INC. |
0.273 MI. CO.RD., BRIDGE & APPROACHES;OVER NEGRO CREEK APPROX. 7.0 MI. W. OF SH- 89. |
$717,866.56 |
$674,305.66 |
07/24/2008 |
08/12/2008 |
08/27/2008 |
08/28/2008 |
12/01/2008 |
03/30/2008 |
|
Jefferson |
CORD |
080228 |
2365004 |
BRO-134D(060)CO |
N |
BRUTON CONSTRUCTION CO., INC. |
0.147 MI. CO.RD.;BRIDGE & APPROACHES; OVER W. MUD CREEK,6.4 MI. EAST & 1.0 MI. N. OF JCT. US-70/US-81 JCT. |
$261,547.50 |
$240,785.14 |
05/15/2008 |
06/02/2008 |
06/18/2008 |
06/26/2008 |
10/06/2008 |
01/03/2009 |
|
Jefferson |
SH-5 |
070397 |
2323104 |
BRFY-134C(058)BF |
N |
OVERLAND CORPORATION |
1.242 MI. GRADE, DRAIN, SURFACE, BRIDGE & EROSION CONTROL SH-5 OVER BEAVER CRK. APPROX. 5.6 MI. E. OF COTTON CO. LN. |
$3,798,079.87 |
$3,763,002.72 |
09/20/2007 |
10/08/2007 |
10/18/2007 |
10/30/2007 |
04/07/2008 |
04/06/2009 |
|
Jefferson |
US-81 |
080427 |
2594804 |
CMC-134N(075) |
N |
T & G CONSTRUCTION, INC. |
0.200 MI. US-81; RESURFACE (ASPHALT) BEGIN 0.45 MI. NO. OF US-70, EXTEND WEST. |
$109,706.70 |
$96,437.97 |
08/21/2008 |
09/19/2008 |
10/02/2008 |
10/07/2008 |
11/01/2008 |
|
|
Johnston |
CORD |
080108 |
2060304 |
BRO-135D(048)CO |
N |
L&N BRIDGE, LLC |
0.234 MI., CO.RD.; GRADE, DRAIN, SURFACE & BRIDGE/OVER HORSE CR., 3.3 MI. E. & 1.1 MI. NORTH OF NIDA. |
$447,366.40 |
$419,413.24 |
07/24/2008 |
08/12/2008 |
08/27/2008 |
09/02/2008 |
11/03/2008 |
02/10/2009 |
|
Johnston |
SH-7 |
090035 |
2320704 |
STPY-135C(091) |
N |
MUSKOGEE BRIDGE COMPANY, INC. |
0.20 MI. SH-7;GRADE,DRAIN, SURFACE, AND BRIDGE;OVER BLUE RIVER, 2.5 MI. EAST OF SH -99. |
$2,320,381.99 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/19/2009 |
02/20/2009 |
04/01/2009 |
10/27/2009 |
|
Johnston |
SH-7 |
090146 |
2478504 |
SBR-135C(104)SB |
N |
PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC |
0.1170 MI. SH-7; BRIDGE RE- DECKING & REHAB.;OVER ROCK CR., 0.96 MI. EAST OF SH-1. |
$499,192.14 |
$0.00 |
02/19/2009 |
03/02/2009 |
03/12/2009 |
03/17/2009 |
07/06/2009 |
10/03/2009 |
|
Johnston |
SH-7D |
080148 |
2451704 |
SBR-135C(101)SB |
N |
K & R BUILDERS, INC. |
0.0670 MI. SH-7D;BRIDGE RE- HABILITATION;OVER DELAWARE CR., APPROX. 0.7 MI. NORTH OF SH-7 |
$735,272.63 |
$609,880.39 |
06/19/2008 |
07/14/2008 |
07/23/2008 |
07/25/2008 |
11/03/2008 |
01/31/2009 |
|
Johnston |
SH-99 |
080403 |
2179004 |
BRFY-135B(064) |
N |
MUSKOGEE BRIDGE COMPANY, INC. |
0.597 MI. SH-99;GRADE,DRAIN, SURFACE & BRIDGE. OVER BLUE RIVER, 3.8 MI. SOUTH OF PONTOTOC COUNTY LINE. |
$3,168,587.77 |
$1,163,512.53 |
07/24/2008 |
08/12/2008 |
08/22/2008 |
08/25/2008 |
12/01/2008 |
05/29/2009 |
|
Kay |
CO.RD. |
080426 |
2510704 |
STP-136C(164)CO |
N |
EVANS & ASSOCIATES CONSTRUCTION CO., INC. |
2.98 MI. RESURFACE (ASPHALT) COUNTY RD. (EW-21) FROM "S" ST. TO RANCH RD. IN PONCA CITY. |
$677,536.05 |
$773,597.87 |
09/18/2008 |
10/06/2008 |
10/23/2008 |
10/24/2008 |
12/01/2008 |
01/14/2009 |
|
Kay |
I-35 |
070212 |
2408404 |
IMG-0035-4(212)222TR |
N |
ACTION SAFETY SUPPLY CO. |
6 MI. SAFETY IMPROVEMENT (CABLE BARRIER) I-35 FROM MILE POST 221 N. 6 MI. TO MILE POST 227. |
$796,189.42 |
$760,795.68 |
05/17/2007 |
06/04/2007 |
06/20/2007 |
07/09/2007 |
08/06/2007 |
10/04/2007 |
|
Kay |
I-35 |
080004 |
2413904 |
IMG-0035-4(213)227TR |
N |
ACTION SAFETY SUPPLY CO. |
6.0 MI. SAFETY IMPROVEMENT (CABLE BARRIER) I-35 BEGIN AT MILE POST 227 & EXTEND TO MILE POST 235. |
$1,561,972.50 |
$1,334,406.75 |
01/17/2008 |
02/04/2008 |
02/21/2008 |
02/29/2008 |
04/07/2008 |
|
|
Kay |
I-35 |
080183 |
2414004 |
IMG-0035-4(214)209TR |
N |
ACTION SAFETY SUPPLY CO. |
0.00 MI. I-35/SAFETY IMPROV. (CABLE BARRIER);BEGIN AT MILE MARKER 209 & EXTEND NORTH TO MILE MARKER 214. |
$798,610.07 |
$371,906.52 |
04/17/2008 |
04/25/2008 |
05/07/2008 |
05/09/2008 |
07/07/2008 |
09/04/2008 |
|
Kay |
I-35 |
060358 |
2034006 |
STPY-136E(127)EH |
N |
DUIT CONSTRUCTION COMPANY, INC. |
0.85 MI. GRADE, DRAIN & SURFACE I-35 (TOURIST INFO. CNTR.) BEGIN 3.0 MI. N. OF THE CITY OF BLACKWELL. |
$5,492,496.11 |
$5,920,839.00 |
09/21/2006 |
10/02/2006 |
10/20/2006 |
11/13/2006 |
12/04/2006 |
06/01/2007 |
|
Kay |
IS-35 |
050695 |
1559304 |
IMY-0035-4(168)222 |
N |
DUIT CONSTRUCTION COMPANY, INC. |
0.920 MI. INTERCHANGE MODIFICATION/BRIDGE & APPROACHES I-35; INTERCHANGE AT I-35 & SH-11. |
$9,017,466.21 |
$9,412,001.97 |
01/19/2006 |
02/13/2006 |
02/21/2006 |
03/08/2006 |
06/06/2006 |
04/26/2007 |
|
Kay |
US-177 |
080373 |
2321604 |
BRFY-136C(124)(123) |
N |
PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV) |
1.563 MI. US-177/ GRADE, DRAIN,SURFACE & BRIDGE;OVER DRY CR & DRY CR O'FLOW, 12. 4 MI. N. OF US-60. |
$5,384,031.40 |
$0.00 |
11/20/2008 |
12/08/2008 |
12/18/2008 |
01/14/2009 |
04/06/2009 |
10/22/2009 |
|
Kay |
US-77 |
080115 |
2451804 |
SBR-136C(150)SB |
N |
MUSKOGEE BRIDGE COMPANY, INC. |
0.00 MI. BRIDGE REHABILITATION US-77 BRIDGE OVER SALT FORK RIVER APPROX. 0.7 MI. SOUTH OF THE US-60B/US-77 JCT. |
$1,470,471.75 |
$1,406,390.60 |
05/15/2008 |
06/02/2008 |
06/16/2008 |
06/26/2008 |
10/06/2008 |
01/03/2009 |
|
Kingfisher |
CO.RD. |
090060 |
2282104 |
STP-137C(066)CI |
N |
DUIT CONSTRUCTION COMPANY, INC. |
4.99 MI. CO.RD.;GRADE,DRAIN & SURFACE;FROM THE CANADIAN COUNTY LINE, EXTEND NORTH. |
$2,306,384.51 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/10/2009 |
02/12/2009 |
06/01/2009 |
09/28/2009 |
|
Kingfisher |
CORD |
080274 |
2140904 |
BRO-137D(038) CO |
N |
BRIDGECO CONTRACTORS, INC. |
0.179 MI. CO. RD.;BRIDGE & APPROACHES, OVER DEAD INDIAN CR. APPROX. 3.3 MIL SO. & 4.8 MI. W. OF JCT. SH-33/US-81 |
$567,893.80 |
$563,655.12 |
08/21/2008 |
09/19/2008 |
09/29/2008 |
10/02/2008 |
01/05/2009 |
06/03/2009 |
|
Kingfisher |
CORD |
060322 |
2277904 |
BRF-137C(065)CO |
N |
PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC |
0.756 MI. BRIDGE & APPROACHES COUNTY RD. (NS-283) OVER CIMARRON RVR. APPROX. 3.0 MI. W. & 0.3 MI. S. OF DOVER. |
$1,762,480.06 |
$1,684,731.08 |
04/19/2007 |
05/07/2007 |
05/22/2007 |
07/03/2007 |
08/06/2007 |
02/21/2008 |
|
Kiowa |
CO.RD |
070118 |
2134604 |
BRO-138D(080)CO |
N |
MUNOZ CONSTRUCTION CO., INC. |
0.245 MI. BRIDGE & APPROACHES COUNTY RD. OVER UNNAMED CRK. 4.0 MI. W. & 6.7 MI. S. OF SH-9/SH-54 JCT. |
$248,804.00 |
$236,713.86 |
03/15/2007 |
04/02/2007 |
04/12/2007 |
04/17/2007 |
05/21/2007 |
09/17/2007 |
|
Kiowa |
CORD |
080137 |
2266204 |
BRO-138D(099)CO |
N |
SEWELL BROTHERS, INC. |
0.151 MI. BRIDGE & APPROACHES COUNTY RD. OVER UNNAMED TRIB. OF RAINY MOUNTAIN CRK. 2.0 MI. W. & 2.1 MI. N. OF GOTEBO. |
$357,699.86 |
$350,315.68 |
03/20/2008 |
04/07/2008 |
04/18/2008 |
05/01/2008 |
08/04/2008 |
12/01/2008 |
|
Kiowa |
US-183 |
090067 |
2611804 |
SSP-138N(158)(159)SS |
N |
DOBSON BROTHERS CONSTRUCTION CO. |
11.070 MI. US-183; WIDEN & RESURFACE;BEGIN AT SH-19, EX- TEND NORTH TO SH-9W. |
$1,425,841.52 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/12/2009 |
02/25/2009 |
06/01/2009 |
11/22/2009 |
|
Latimer |
CORD |
080345 |
2359204 |
BRO-NBIL(074)CO |
N |
HUB CONSTRUCTION, INC. |
0.111 MI. CO.RD.; BRIDGE & APPROACHES;OVER ROCK CR., 1.0 MI. NO. & 1.0 MI. W. OF LODI. |
$530,372.65 |
$319,466.35 |
08/21/2008 |
09/19/2008 |
09/30/2008 |
10/02/2008 |
01/05/2009 |
04/14/2009 |
|
Latimer |
SH-2 |
080034 |
2314204 |
BRFY-139B(062) |
N |
MUSKOGEE BRIDGE COMPANY, INC. |
0.637 MI. BRIDGE & APPROACHES SH-2 OVER GAINES CRK. 14.5 MI. N. OF PUSHMATAHA COUNTY LINE. |
$2,711,367.77 |
$2,225,361.87 |
01/17/2008 |
02/04/2008 |
02/12/2008 |
02/15/2008 |
06/02/2008 |
12/28/2008 |
|
Latimer |
US-270 |
080210 |
2506604 |
MC-139B(092) |
N |
JOB CONSTRUCTION CO., INC. |
4.00 MI. RESURFACE US-270 BEGIN APPROX. 0.6 MI. W. OF SH-82 SOUTH & EXTEND EAST. |
$695,233.05 |
$806,253.51 |
04/17/2008 |
04/25/2008 |
05/09/2008 |
05/16/2008 |
08/04/2008 |
10/02/2008 |
|
Le Flore |
SH-112 |
080249 |
2570704 |
MC-140C(166) |
N |
JOB CONSTRUCTION CO., INC. |
4.00 MI. SH-112; RESURFACE (ASPHALT);BEGIN AT THE EAST EDGE OF POTEAU, EXTEND EAST. |
$924,707.64 |
$0.00 |
07/24/2008 |
08/12/2008 |
08/27/2008 |
08/28/2008 |
10/01/2008 |
|
|
Le Flore |
SH-128 |
050722 |
0891604 |
BRFY-40C(356) |
N |
PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC |
2.993 KM GRADE, DRAIN, SURFACE & BRIDGES SH-128 OVER SUGAR CRK. & 5 UNNAMED CRKS. SOUTHEAST OF HEAVENER. |
$8,016,994.97 |
$7,839,593.70 |
02/16/2006 |
03/06/2006 |
03/22/2006 |
03/24/2006 |
06/05/2006 |
07/09/2007 |
|
Le Flore |
SH-128 |
080191 |
2314405 |
BRFY-140C(164) |
N |
GARY A. CRAIN, INC. |
0.00 MI. SH-128/SH-112, BRIDGE WATERPROOF SEAL (SILANE); VARIOUS LOCATIONS IN DIV. II |
$19,641.00 |
$17,166.14 |
04/17/2008 |
04/25/2008 |
05/12/2008 |
05/16/2008 |
09/08/2008 |
10/07/2008 |
|
Le Flore |
SH-144 |
070187 |
1765904 |
BRFY-140C(044)BF |
N |
HUB CONSTRUCTION, INC. |
0.479 MI.SH-144;GRADING, DRAIN, SURFACE & BRIDGE/OVER ROCK CR., 3.5 MI. E. OF PUSHMATAHA. |
$2,089,413.80 |
$2,028,055.06 |
07/19/2007 |
08/06/2007 |
08/20/2007 |
08/23/2007 |
10/01/2007 |
02/27/2008 |
|
Le Flore |
SH-144 |
080214 |
2370204 |
BRFY-140C(143) |
N |
HUB CONSTRUCTION, INC. |
0.639 MI. SH-144;BRIDGE & APPROACHES;OVER LITTLE ROCK CR, EAST OF THE PUSHMATAHA COUNTY LINE. |
$2,818,407.90 |
$641,316.70 |
07/24/2008 |
08/12/2008 |
08/22/2008 |
08/25/2008 |
12/01/2008 |
06/18/2009 |
|
Le Flore |
US-271 |
080084 |
1139504 |
NHY-33N(001)/BRFY-* |
N |
OBC, INC. |
*033N(002)/ 1.665 MI. GRADE, DRAIN, SURFACE & BRIDGE US-271 FROM SH-112 WEST TO SH-9A. |
$10,509,447.10 |
$6,353,368.89 |
02/21/2008 |
03/03/2008 |
03/12/2008 |
03/27/2008 |
07/07/2008 |
08/10/2009 |
|
Le Flore |
US-59 |
080229 |
2472504 |
HSIPG-140A(155)TR |
N |
C-GAWF CONSTRUCTION, INC. |
0.00 MI. US-59; INTERSECTION MODIFICATION;AT L.C. WELLS RD.IN THE TOWN OF SHADY POINT. |
$141,085.00 |
$89,210.00 |
06/19/2008 |
07/14/2008 |
08/05/2008 |
08/12/2008 |
11/10/2008 |
12/09/2008 |
|
Le Flore |
US-59 |
080284 |
2569104 |
SSR-140A(165)SR |
N |
JOB CONSTRUCTION CO., INC. |
4.990 MI. US-59; RESURFACE (ASPHALT) BEGIN AT NORTH HOWE CITY LIMITS, EXTEND NORTH. |
$2,277,289.79 |
$2,263,486.06 |
06/19/2008 |
07/14/2008 |
07/29/2008 |
07/31/2008 |
09/08/2008 |
|
|
Lincoln |
CORD |
080230 |
2073004 |
BRO-141D(117)CO |
N |
BELK BRIDGE, INC. |
0.283 MI. CO.RD.;BRIDGE & APPROACHES;OVER DRY CR.,4.0 MIEAST & 1.5 MI. SO. OF DAVENPORT. |
$803,659.68 |
$667,352.72 |
05/15/2008 |
06/02/2008 |
06/18/2008 |
06/26/2008 |
10/06/2008 |
04/03/2009 |
|
Lincoln |
SH-18 |
080184 |
1340308 |
STPY-141C(165) |
N |
JIM COOLEY CONSTRUCTION, INC. |
0.00 MI. LANDSCAPING (ENVIRONMENTAL MITIGATION & EROSION CNTRL) SH-18 BEG APPROX 9.3 MI N OF US-62 JCT & EXTEND N. |
$513,337.00 |
$480,403.30 |
04/17/2008 |
04/25/2008 |
05/13/2008 |
05/23/2008 |
09/08/2008 |
09/02/2009 |
|
Lincoln |
SH-18 |
080421 |
2326904 |
IMY-0044-2(449)166 |
N |
ALLEN CONTRACTING, INC. |
0.464 MI. SH-18;BRIDGE & APPROACHES/OVER THE TURNER TURNPIKE (I-44). |
$4,341,471.05 |
$653,684.27 |
10/16/2008 |
11/03/2008 |
11/17/2008 |
11/21/2008 |
03/02/2009 |
10/27/2009 |
|
Lincoln |
SH-99 |
040371 |
1253905 |
BRFY-12N(28) |
N |
MUSKOGEE BRIDGE COMPANY, INC. |
1.06 MI. GRADE, DRAIN, SURFACE & BRIDGE SH-99 OVER DEEP FORK RIVER & OVERFLOW 4.9 MI. S. OF STROUD. |
$4,164,385.88 |
$4,031,781.58 |
10/21/2004 |
12/06/2004 |
12/20/2004 |
01/07/2005 |
04/05/2005 |
01/28/2006 |
|
Lincoln |
US-62 |
080344 |
2578205 |
BPMY-125B(167)3B |
N |
GIBSON & ASSOCIATES, INC. |
0.00 MI. US-62; JOINT SEAL/ REPAIR; VARIOUS LOCATIONS IN DIV. III. |
$782,594.00 |
$130,757.80 |
10/16/2008 |
11/03/2008 |
11/17/2008 |
11/25/2008 |
03/02/2009 |
07/29/2009 |
|
Lincoln |
US-62 |
080343 |
2578204 |
BPMY-NBIP(400)3B |
N |
POSEIDON CONSTRUCTION, INC. |
0.00 MI. BRIDGE PAINTING SH-19 / SH-74 / US-62 AT VARIOUS LOCATIONS IN DIVISION 3. |
$94,962.00 |
$0.00 |
09/18/2008 |
10/06/2008 |
10/23/2008 |
12/04/2008 |
02/02/2009 |
05/02/2009 |
|
Logan |
CORD |
080275 |
1897504 |
BRO-142D(063)CO |
N |
K & R BUILDERS, INC. |
0.196 MI.CO.RD./BRIDGE & APPROACHES;OVER BEAVER CR., APPROX. 5.3 MI. SO. OF JCT SH-51/US-77. |
$819,960.10 |
$765,195.91 |
06/19/2008 |
07/14/2008 |
07/23/2008 |
07/25/2008 |
10/06/2008 |
02/02/2009 |
|
Logan |
I-35 |
080129 |
2506104 |
IMG-0035-4(223)146TR* |
N |
ACTION SAFETY SUPPLY CO. |
*NHG-25N(005)TR/IMG-35-3 (296)126 TR/ 19.80 MI. I-35 STRIPING/PAVEMENT MARKING. MULTIPLE LOCATIONS. |
$877,220.52 |
$167,786.58 |
04/17/2008 |
04/25/2008 |
05/09/2008 |
05/19/2008 |
07/07/2008 |
12/03/2008 |
|
Logan |
SH-51 |
080406 |
1836104 |
BRFY-142C(48)(123) |
N |
OBC, INC. |
1.094 MI BR & APPRS/GRD, DRN, SURF & BR SH-51 OTTER CRK 6.4 MI E KINGFISHER C/L. US-77 SKELETON CRK 7.2 MI N SH-33. |
$7,382,378.40 |
$4,177,319.55 |
09/18/2008 |
10/06/2008 |
10/21/2008 |
10/29/2008 |
02/02/2009 |
11/28/2009 |
|
Love |
IS-35 |
070407 |
2414104 |
IMG-0035-1(146)013TR |
N |
JIM COOLEY CONSTRUCTION, INC. |
0.00 MI. SAFETY IMPROVEMENT (CABLE BARRIER PROJECT) I-35 BEGIN AT THE TX. ST. LINE & EXTEND N. TO MM 12.5 (4 LOCS.) |
$1,364,152.19 |
$1,103,480.01 |
11/15/2007 |
12/03/2007 |
12/19/2007 |
01/04/2008 |
02/04/2008 |
06/02/2008 |
|
Love |
IS-35 |
080445 |
2216110 |
SEC1702Y-143N(072)HP |
N |
OVERLAND CORPORATION |
0.88 MI. GRADE, DRAIN & SURFACE ROGERS RD. FROM JCT. I-35 / US-77 EXTEND EAST. |
$2,476,542.95 |
$282,685.43 |
10/16/2008 |
11/03/2008 |
11/10/2008 |
11/18/2008 |
03/02/2009 |
08/28/2009 |
|
Love |
SH-32 |
070007 |
2026404 |
BRFY-143C(046) |
N |
OBC, INC. |
1.470 MI. BRIDGE & APPROACHES SH-32 OVER WALNUT BAYOU APPROX. 14.7 MI. E. OF THE JEFFERSON COUNTY LINE. |
$6,059,419.07 |
$5,894,138.39 |
01/18/2007 |
02/06/2007 |
02/21/2007 |
03/12/2007 |
06/04/2007 |
05/28/2008 |
|
Love |
SH-32 |
080231 |
2096304 |
BRFY-143C(057) |
N |
PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV) |
0.6620 MI. SH-32; BRIDGE & APPROACHES/OVER ROCK CR. APPROX. 4.7 MI. W. OF MARRIETTA. |
$3,199,999.99 |
$1,315,350.44 |
05/15/2008 |
06/02/2008 |
06/12/2008 |
06/27/2008 |
10/06/2008 |
05/03/2009 |
|
Major |
CORD |
070326 |
2131004 |
STP-147C(087)CO* |
N |
J & R SAND COMPANY, INC. |
*BRF-147C(098)CO; 4.193 MI. RESURF CO RD BEG @ US-281 2 MI S OF CHESTER/OVER WEST CRK 2.2 MI W & 5 MI N US-412/US-281 |
$1,364,608.34 |
$1,380,132.56 |
07/19/2007 |
08/06/2007 |
08/20/2007 |
08/23/2007 |
09/24/2007 |
04/10/2008 |
|
Marshall |
US70 |
070388 |
1740611 |
ACNHY-022N(040)GB |
N |
OVERLAND CORPORATION |
1.684 MI. US-70; GRADE,DRAIN, SURFACE,BRIDGE & EROSION CON- TROL.BEGIN 4.3 MI. W. OF US- 177 JCT, EXTEND EAST. |
$8,096,958.36 |
$1,886,619.26 |
07/24/2008 |
08/12/2008 |
08/22/2008 |
08/26/2008 |
12/01/2008 |
11/25/2009 |
|
Mayes |
CO.RD. |
080313 |
2234904 |
BRO-149D(086)CO |
N |
PARADIGM CONSTRUCTION & ENGINEERING, INC |
0.156 MI. BRIDGE & APPROACHES COUNTY RD. OVER SALINE CREEK 0.89 MI. NN. & 7.3 MI. E. OF SALINA. |
$1,092,312.45 |
$691,082.97 |
07/24/2008 |
08/12/2008 |
08/27/2008 |
09/03/2008 |
10/06/2008 |
04/03/2009 |
|
Mayes |
US-69 |
070438 |
2089304 |
BRFY-013N(083)SS |
N |
BECCO CONTRACTORS, INC. |
0.264 MI. US-69;BRIDGE & APPROACHES;OVER CHOUTEAU CR., 9.4 MI. NO. OF WAGONER CO. LINE. |
$1,375,856.94 |
$1,309,624.33 |
11/15/2007 |
12/03/2007 |
12/17/2007 |
01/03/2008 |
04/07/2008 |
01/01/2009 |
|
Mayes |
US-69 |
080346 |
2312704 |
NHY-013N(107) |
N |
APAC-OKLAHOMA, INC. |
1.382 MI. US-69; GRADE,DRAIN , & SURFACE/BEGIN 0.15 MI. NO.OF US-412, EXTEND NORTH. |
$2,420,802.12 |
$56,465.53 |
11/20/2008 |
12/08/2008 |
12/18/2008 |
12/30/2008 |
03/02/2009 |
08/08/2009 |
|
McClain |
CORD |
080171 |
2114004 |
BRO-144D(075)CO |
N |
OBC, INC. |
0.2700 MI. CO.RD.;BRIDGE & APPROACHES;OVER CRINER CR. 3.0 MI. SO. & 0.5 MI. EAST OF CRINER. |
$755,723.66 |
$702,864.09 |
04/17/2008 |
04/25/2008 |
05/05/2008 |
05/09/2008 |
09/08/2008 |
01/05/2009 |
|
McClain |
US-62 |
060279 |
1357404 |
STPY-044B(319) |
N |
HASKELL LEMON CONSTRUCTION CO. |
1.694 MI. GRADE, DRAIN, SURFACE & BRIDGE US-62 FROM GRADY COUNTY LINE EXTEND N. THRU BLANCHARD. |
$9,459,984.70 |
$9,685,974.00 |
05/17/2007 |
06/04/2007 |
06/20/2007 |
07/09/2007 |
08/13/2007 |
06/07/2008 |
|
McClain |
US-77 |
090082 |
2599304 |
STPY-144A(137)3R |
N |
SILVER STAR CONSTRUCTION COMPANY, INC. |
2.280 MI. US-77/ RESURFACE (ASPHALT)BEGIN AT SH-74 EXTENDNORTH. |
$876,253.39 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/19/2009 |
02/26/2009 |
|
07/31/2009 |
|
McCurtain |
CORD |
070148 |
1914005 |
STP-145C(089)MS |
N |
JOB CONSTRUCTION CO., INC. |
7.185 MI. GRADE, DRAIN, BRIDGE & SURFACE COUNTY ROAD BEGIN APPROX. 8.0 MI. N. & 0.2 MI. E. OF BETHEL EXTEND NORTH. |
$6,086,246.35 |
$2,163,318.53 |
05/17/2007 |
06/04/2007 |
06/20/2007 |
07/09/2007 |
10/01/2007 |
12/23/2008 |
|
McCurtain |
CORD |
080165 |
2197604 |
BRO-145D(130)CO |
N |
HUB CONSTRUCTION, INC. |
0.130 MI. CO.RD.;BRIDGE & APPROACHES;OVER YASHAU CR.,1.0MI. NORTH & 1.0 MI. W. OF BROKEN BOW. |
$837,374.25 |
$584,794.99 |
07/24/2008 |
08/12/2008 |
08/22/2008 |
08/25/2008 |
01/05/2009 |
06/13/2009 |
|
McCurtain |
US-70 |
070241 |
1884204 |
ACNHY-022N(145)GB |
N |
R. K. HALL CONSTRUCTION, LTD. |
2.292 MI. GRADE, DRAIN & SURFACE US-70 BEGIN E. OF MILLERTON & EXTEND EAST TO GARVIN. |
$5,103,635.13 |
$2,411,376.17 |
06/14/2007 |
07/16/2007 |
08/02/2007 |
09/26/2007 |
11/05/2007 |
08/30/2008 |
|
McCurtain |
US70 |
070347 |
1886004 |
ACNHY-022N(105)GB |
N |
THE CUMMINS CONSTRUCTION CO., INC. |
3.920 MI. US-70; GRADE,DRAIN , SURFACE & EROSION CONTROL. FROM JUST WEST OF SH-98, EXTEND EAST THROUGH MILLERTON. |
$9,951,247.68 |
$1,419,104.95 |
08/16/2007 |
09/10/2007 |
09/24/2007 |
10/02/2007 |
01/07/2008 |
11/11/2008 |
|
McIntosh |
US-69 |
080329 |
2414304 |
SSP-146N(091)SS |
N |
GLOVER & ASSOCIATES, INC. |
0.00 MI. US-69/SAFETY IM- PROVEMEMT (CABLE BARRIER) BEGIN AT SH-9 JCT., EXTEND NORTH. |
$1,759,198.40 |
$1,742,294.11 |
08/21/2008 |
09/19/2008 |
09/30/2008 |
10/02/2008 |
11/03/2008 |
03/02/2009 |
|
McIntosh |
US-69 |
090072 |
2626304 |
SSR-146A(116)SR |
N |
GLOVER & ASSOCIATES, INC. |
3.48 MI. US-69; RESURFACE (ASPHALT)FROM 9.82 MI. NORTH OF PITTSBURG C/L EXTEND NORTH. |
$1,204,438.50 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/19/2009 |
02/26/2009 |
|
07/31/2009 |
|
Murray |
SH-7 |
090023 |
2334205 |
SSR-150C(078)SR |
N |
SEAL MASTERS, INC. |
5.110 MI. SH-7; RESURFACE (ASPHALT)BEGIN 235 FEET EAST OF SH-110 JCT, EXT. EAST. |
$1,167,490.61 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/24/2009 |
02/27/2009 |
|
06/30/2009 |
|
Murray |
US-177 |
060216 |
2026204 |
STPY-150B(042) |
N |
OVERLAND CORPORATION |
4.867 MI. GRADE, DRAIN, SURFACE & BRIDGE US-177 FROM THE CARTER COUNTY LINE EXTEND NORTH. |
$3,984,823.99 |
$3,904,286.64 |
10/19/2006 |
11/06/2006 |
11/21/2006 |
12/07/2000 |
02/05/2007 |
09/07/2007 |
|
Murray |
US-177 |
080317 |
2474704 |
SBR-150B(072)SB |
N |
K & R BUILDERS, INC. |
0.030 MI.;US-177;BRIDGE RE- HAB.; OVER ROCK CR., 0.4 MI. NORTH OF JCT. SH-7 |
$477,568.50 |
$454,062.10 |
07/24/2008 |
08/12/2008 |
08/27/2008 |
09/03/2008 |
12/01/2008 |
01/29/2009 |
|
Muskogee |
CO.RD. |
080118 |
1595204 |
BRO-051D(423)CO |
N |
C-GAWF CONSTRUCTION, INC. |
0.379 MI. CO.RD. BRIDGE & APPROACHES;ON EW-99 OVER ANDER-SON CR., 0.4 MI NO. & 2.8 MI. W. OF OKTAHA. |
$397,850.88 |
$363,535.36 |
02/21/2008 |
03/03/2008 |
03/14/2008 |
03/25/2008 |
07/07/2008 |
11/03/2008 |
|
Muskogee |
CO.RD. |
090031 |
2253204 |
BRO-151D(147)CO |
N |
OBC, INC. |
0.198 MI. CO.RD.; BRIDGE & APPROACHES/OVER AN UNNAMED CR., 3.5 MI. SOUTH & 1.8 MI. EAST OF PORUM. |
$257,735.23 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/12/2009 |
02/18/2009 |
05/04/2009 |
08/01/2009 |
|
Muskogee |
CO.RD. |
090074 |
1778504 |
BRO-151D(057)CO |
N |
BELK BRIDGE, INC. |
0.207 MI. CO.RD./ BRIDGE & APPROACHES;OVER MAYNARD BAYOU,2.5 MI. SO. & 1.7 MI. EAST OF FT. GIBSON |
$1,049,280.55 |
$0.00 |
02/19/2009 |
03/02/2009 |
03/16/2009 |
03/17/2009 |
08/03/2009 |
01/29/2010 |
|
Muskogee |
I-40 |
070054 |
2023804 |
IMY-0040-6(334)276 HP |
N |
DUIT CONSTRUCTION COMPANY, INC. |
5.043 MI. RESURFACE I-40 FROM MILEPOST 276.47 TO MILEPOST 283.11 (WESTBOUND ONLY). |
$10,194,926.33 |
$9,641,158.28 |
05/17/2007 |
06/04/2007 |
06/18/2007 |
07/09/2007 |
10/01/2007 |
10/24/2008 |
|
Muskogee |
IS-40 |
080466 |
2088504 |
IMY-040-6(343)276* |
N |
DUIT CONSTRUCTION COMPANY, INC. |
*SSP-151N(163)SS/ 5.043 MI. IS-44; RECONSTRUCT-NO ADDED LANES/SAFETY IMPROV.,FROM MI. MARKER 276.47 TO 281.66. |
$10,227,565.46 |
$869,115.83 |
11/20/2008 |
12/08/2008 |
12/18/2008 |
12/31/2008 |
04/06/2009 |
03/16/2010 |
|
Muskogee |
US-62 |
080006 |
2030405 |
BHFY-151B(171) |
N |
MUSKOGEE BRIDGE COMPANY, INC. |
1.115 MI. JOINT / SEAL REPAIR US-62 OVER THE ARKANSAS RIVER NAVIGATION CHANNEL 2.14 MI. E. OF JCT. US-62 / SH-16. |
$3,785,680.42 |
$1,247,460.76 |
07/24/2008 |
08/12/2008 |
08/27/2008 |
08/28/2008 |
03/02/2009 |
10/27/2009 |
|
Muskogee |
US-62B |
090049 |
2597904 |
STPY-151A(185)3R |
N |
GLOVER & ASSOCIATES, INC. |
1.67 MI. US-62B; RESURFACE (ASPHALT)BEGIN AT US-64B & EXTEND NORTH. |
$829,374.00 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/12/2009 |
02/24/2009 |
|
08/31/2009 |
|
Muskogee |
US-64 |
070189 |
1499410 |
STPY-151C(004) |
N |
DUIT CONSTRUCTION COMPANY, INC. |
1.849 MI. GRADE, DRAIN, BRIDGE & SURFACE US-64 FROM 11.3 MI. S. OF SH-165 EXT. S. (5 LANE)(DIRTY CRK. & OVERFLOW). |
$9,168,998.59 |
$5,878,212.11 |
05/17/2007 |
06/04/2007 |
06/20/2007 |
07/09/2007 |
10/01/2007 |
02/11/2009 |
|
Noble |
CO.RD. |
090032 |
2235104 |
BRO-152D(092)CO |
N |
OBC, INC. |
0.226 MI. CO.RD./BRIDGE & APPROACHES;OVER RED ROCK CR., 1.0 MI. EAST & 2.5 MI. SO. OF BILLINGS. |
$525,586.50 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/12/2009 |
02/18/2009 |
05/04/2009 |
09/30/2009 |
|
Noble |
I-35 |
070287 |
2024604 |
IMY-0035-4(195)199 |
N |
SHERWOOD CONSTRUCTION CO., INC. |
0.512 MI. GRADE, DRAIN, SURFACE & BRIDGE I-35 OVER RED ROCK CRK. OVERFLOWS NORTH OF PERRY. |
$5,094,970.42 |
$5,643,391.38 |
07/19/2007 |
08/06/2007 |
08/20/2007 |
08/23/2007 |
09/24/2007 |
06/19/2008 |
|
Noble |
IS-35 |
090052 |
2603104 |
IMY-35-4(228)193 3R |
N |
DUIT CONSTRUCTION COMPANY, INC. |
5.65 MI. IS-35;PAVEMENT REHAB.;BEGIN AT MILE MARKER 193, EXTEND NORTH TO MILE MARKER 198. |
$299,188.96 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/10/2009 |
02/12/2009 |
06/01/2009 |
07/30/2009 |
|
Noble |
SH-15 |
090017 |
2474805 |
BHFY-152C(154) |
N |
KING CONSTRUCTION CO., INC. & SUBS. |
0.00 MI. SH-15/BRIDGE RE- HABILITATION/OVER RED ROCK CR., 5.2 MI. EAST OF US-77. |
$786,916.50 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/19/2009 |
03/05/2009 |
06/01/2009 |
08/29/2009 |
|
Noble |
U177 |
080408 |
2086504 |
BRFY-152B(054) |
N |
OBC, INC. |
1.076 MI. GRADE, DRAIN, SURFACE & BRIDGE US-177 OVER BLACK BEAR CRK. & OVERFLOWS 2.1 MI. & 2.3 MI. N. OF US-64. |
$5,302,065.94 |
$1,086,227.58 |
09/18/2008 |
10/06/2008 |
10/20/2008 |
10/22/2008 |
02/02/2009 |
01/17/2010 |
|
Noble |
US-64 |
080114 |
2452504 |
SBR-152C(148)(149)SB |
N |
PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV) |
0.00 MI. BRIDGE REHABILITATION US-64 LONG BRANCH CRK. 4.1 MI. E. OF US-77/OAK CRK. 7.0 MI. E. OF US-177. |
$2,116,589.42 |
$2,149,946.75 |
05/15/2008 |
06/02/2008 |
06/12/2008 |
06/30/2008 |
10/06/2008 |
01/31/2009 |
|
Noble |
US-77 |
070333 |
1231704 |
SAB-52C(194)BF/* |
N |
PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC |
SAB-152C(111)BF; 1.52 MI. GRD, DRN, SURF & BR US-77 RED ROCK CRK OVRFLW 1.1 MI S SH-15/SH-15 UNNAMED CRK 0.7 MI E US-77. |
$7,055,993.43 |
$5,882,719.38 |
07/19/2007 |
08/06/2007 |
08/17/2007 |
08/21/2007 |
12/03/2007 |
01/25/2009 |
|
Nowata |
CORD |
080132 |
2178104 |
BRO-153D(31)CO* |
N |
BELK BRIDGE, INC. |
*STP-153C(135)CO/ 0.549 MI. CO.RD. GRADE,DRAIN,SURFACE, BRIDGE & APPROACHES;OVER OPOSSUM CR., 2.7 MI. S.OF |
$1,156,429.90 |
$1,110,660.80 |
02/21/2008 |
03/03/2008 |
03/17/2008 |
03/25/2008 |
06/02/2008 |
02/16/2009 |
|
Nowata |
CORD |
080189 |
2342004 |
CB-153D(143) |
N |
BELK BRIDGE, INC. |
0.212 MI. CO.RD.; BRIDGE & APPROACHES;OVER CA. CR. APPROX0.5 MI. SO. & 3.5 MI. W. OF US-169/SH-10 E. JCT. |
$537,250.93 |
$536,137.50 |
04/17/2008 |
04/25/2008 |
05/09/2008 |
05/16/2008 |
06/23/2008 |
11/21/2008 |
|
Okfuskee |
IS-40 |
080285 |
2569904 |
IMC-154A(122) |
N |
C-GAWF CONSTRUCTION, INC. |
4.600 MI. IS-40; PAVEMENT REHABILITATION(PATCHING)BEGIN 4.6 MI. W. OF JCT. US-75/ IS-40, EXTEND EAST. |
$234,240.00 |
$224,030.15 |
06/19/2008 |
07/14/2008 |
08/05/2008 |
08/12/2008 |
10/06/2008 |
12/04/2008 |
|
Okfuskee |
SH-27 |
090073 |
2493004 |
SSR-154C(108)SR |
N |
GLOVER & ASSOCIATES, INC. |
0.960 MI. SH-27;RESURFACE (ASPHALT)BEGIN AT I-40 & EX- TEND NORTH TO US-62. |
$596,610.56 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/20/2009 |
02/24/2009 |
|
07/31/2009 |
|
Okfuskee |
SH-56 |
070390 |
2179204 |
BRFY-154C(073)BF |
N |
PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC |
0.4924 MI. GRADE, DRAIN, SURFACE, EROSION CONTROL & BRIDGES NUYAKA CRK. BEG. 2.7 MI. W. OF OKFUSKEE/OKMULGEE C/L EXT. E. |
$2,833,702.29 |
$2,735,599.23 |
09/20/2007 |
10/08/2007 |
10/18/2007 |
10/25/2007 |
04/07/2008 |
11/02/2008 |
|
Okfuskee |
SH-99A |
080414 |
2321104 |
STPY-154C(092) |
N |
C-GAWF CONSTRUCTION, INC. |
0.0210 MI.,SH-99A; GRADE, DRAIN,SURFACE & BRIDGE. OVER AN UNNAMED CR. 0.8 MI. E. OF THE SEMINOLE CO. LINE. |
$367,963.00 |
$0.00 |
08/21/2008 |
09/19/2008 |
10/07/2008 |
10/15/2008 |
11/12/2008 |
01/25/2009 |
|
Oklahoma |
CO.RD. |
080009 |
1516104 |
BRF-055C(881)CO |
N |
PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC |
0.094 MI. GRADE, DRAIN & SURFACE CO. RD OVER UNNAMED CRK. 6.0 MI. W. OF LINCOLN C/L & 0.4 MI. S. OF LOGAN C/L. |
$250,410.15 |
$248,053.55 |
07/24/2008 |
08/12/2008 |
08/27/2008 |
08/29/2008 |
12/01/2008 |
01/29/2009 |
|
Oklahoma |
CORD |
090076 |
2399804 |
STP-155C(597)AG |
N |
WITTWER CONSTRUCTION CO., INC. |
0.374 MI. CO.RD.; BRIDGE & INTERSECTION MODIFI.;OVER SILVER CR., 1.0 MI. NO. OF US-62, IN THE CT. OF SPENCER. |
$1,318,826.28 |
$0.00 |
02/19/2009 |
03/02/2009 |
03/16/2009 |
03/18/2009 |
05/04/2009 |
10/30/2009 |
|
Oklahoma |
CT.ST. |
060366 |
2112804 |
STP-155B(419)AG |
N |
SCHWARZ PAVING CO., INC. |
2.852 MI. GRADE, DRAIN, BRIDGE & SURFACE CITY STREET ON S.W. 54TH ST. FROM MACARTHUR EXT. E. TO E. OF PORTLAND AVE. |
$7,833,633.14 |
$8,244,481.15 |
01/18/2007 |
02/06/2007 |
02/21/2007 |
03/21/2007 |
06/04/2007 |
07/07/2008 |
|
Oklahoma |
CT.ST. |
080037 |
2296804 |
STP-155C(518)(519)AG |
N |
HASKELL LEMON CONSTRUCTION CO. |
1.683 MI GRD, DRN, SURF, BR & TRAFF SIGL BRITTON RD 0.5 MI W ANDERSON RD TO HIWASSEE RD @ BRITTON & HIWASSEE RD IN JONES |
$1,488,529.55 |
$1,312,076.23 |
01/17/2008 |
02/04/2008 |
02/19/2008 |
02/29/2008 |
07/07/2008 |
11/18/2008 |
|
Oklahoma |
CT.ST. |
080441 |
2336704 |
STP-155D(545)AG |
N |
K & R BUILDERS, INC. |
0.122 MI. CT.ST./GRADE,DRAIN ,SURFACE & BRIDGE;OVER CRUTCHOCR. 0.7 MI. N. OF DEL CITY. |
$934,425.50 |
$239,154.69 |
09/18/2008 |
10/06/2008 |
10/21/2008 |
10/29/2008 |
02/02/2009 |
07/11/2009 |
|
Oklahoma |
CT.ST. |
070440 |
2202404 |
STP-155D(458)AG |
N |
PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC |
0.549 MI. BRIDGE & APPROACHES CITY ST. (TRIPLE X RD.) OVER N. CANADIAN RVR. 2.3 MI. E. & 1.5 MI. N. OF CHOCTAW. |
$3,648,873.55 |
$3,656,467.30 |
01/17/2008 |
02/04/2008 |
02/11/2008 |
02/15/2008 |
06/02/2008 |
01/07/2009 |
|
Oklahoma |
CT.ST. |
090027 |
2113004 |
STPG-155F(421)AG |
N |
TRAFFIC SIGNALS, INC. |
0.00 MI. CT.ST.; SAFETY IM- PROVEMENT(SCHOOL ZONE)AT MUL- TIPLE LOCATIONS IN CLEVE- LAND & OKLA. COUNTIES. |
$354,426.70 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/20/2009 |
02/25/2009 |
04/01/2009 |
07/29/2009 |
|
Oklahoma |
CTST |
060214 |
2105104 |
STP-155B(417)AG |
N |
HASKELL LEMON CONSTRUCTION CO. |
0.895 MI. GRADE, DRAIN, SURFACE & SIGNAL; 33RD ST. BETWEEN SANTA FE & KELLY AVES. IN EDMOND. |
$4,072,076.60 |
$4,119,483.61 |
07/20/2006 |
08/07/2006 |
08/23/2006 |
09/12/2006 |
12/04/2006 |
07/31/2007 |
|
Oklahoma |
CTST |
080008 |
2232204 |
STP-155A(485)AG |
N |
DOBSON BROTHERS CONSTRUCTION CO. |
1.256 MI GRD, DRN, SURF, BR & SIG NW 178TH ST BEG W OF PENN AVE & EXT E/PENN AVE & WESTERN AVE BEG S OF 178TH ST & EXT N |
$5,508,027.20 |
$3,752,849.19 |
03/20/2008 |
04/07/2008 |
04/18/2008 |
05/01/2008 |
08/04/2008 |
05/30/2009 |
|
Oklahoma |
CTST |
080168 |
2047404 |
STP-155C(387)AG |
N |
SHERWOOD CONSTRUCTION CO., INC. |
0.843 KM GRADE, DRAIN, SURFACE & BRIDGE COVELL RD-THOMAS DR TO BROADWAY / BOULEVARD-N OF COVELL & EXTEND N. |
$6,096,878.98 |
$2,479,913.73 |
03/20/2008 |
04/07/2008 |
04/16/2008 |
04/25/2008 |
08/04/2008 |
08/18/2009 |
|
Oklahoma |
I-240 |
080233 |
2557504 |
IMY-0240-1(354)004MS |
N |
AUSTIN PAVING LLC |
0.219 MI. GRADE & SURFACE I-240 SOUTHBOUND ON RAMP FROM I-240 TO S.W. 82ND ST. (I-35 / I-240 INTERCHANGE). |
$395,200.00 |
$100,140.01 |
07/24/2008 |
08/12/2008 |
08/27/2008 |
09/04/2008 |
10/13/2008 |
01/10/2009 |
|
Oklahoma |
I-40 |
070139 |
1742821 |
OKCY-XTWN(002)HP |
N |
MUSKOGEE BRIDGE COMPANY, INC. |
0.00 MI. GRADE, DRAIN, RAILROAD & BRIDGE I-40 CROSSTOWN FOR BNSF RED ROCK & COTTON SEED MILL LOOP IN OKLAHOMA CITY. |
$14,585,639.25 |
$13,272,781.01 |
04/26/2007 |
05/07/2007 |
05/18/2007 |
06/18/2007 |
07/16/2007 |
08/23/2008 |
|
Oklahoma |
I-40 |
070213 |
2408104 |
SSP-155N(604)SS |
N |
MIDSTATE TRAFFIC CONTROL, INC. |
SAFETY IMPROVEMENT (CABLE BARRIER PROJECT) I-40 BEGIN AT AVE. A IN MIDWEST CITY & EXTEND E. TO POTTAWATOMIE COUNTY LINE. |
$1,298,635.90 |
$1,285,982.35 |
06/14/2007 |
07/16/2007 |
07/30/2007 |
08/07/2007 |
09/03/2007 |
12/31/2007 |
|
Oklahoma |
I-40 |
070353 |
1742856 |
OKCY-XTWN-0(044)000TI |
N |
MUSKOGEE BRIDGE COMPANY, INC. |
0.369 MI. GRADE, DRAIN, BRIDGE & RAILROAD I-40 FROM CANAL BRIDGE W. 0.4 MI./LEE ST. DRNG. STR./N. BOUND SHIELDS BR. |
$15,399,884.75 |
$12,752,406.80 |
10/18/2007 |
11/05/2007 |
11/14/2007 |
11/21/2007 |
01/07/2008 |
|
|
Oklahoma |
IS-35 |
090013 |
2543604 |
SSR-155N(645)SR |
N |
SHELL CONSTRUCTION CO., INC. |
0.340 MI. IS-35; GRADING & SURFACING/I-35 RAMPS;AT WATER -LOO ROAD. |
$229,258.60 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/19/2009 |
02/27/2009 |
06/01/2009 |
07/30/2009 |
|
Oklahoma |
IS-35 |
090095 |
2617904 |
SSR-155N(697)SR |
N |
HASKELL LEMON CONSTRUCTION CO. |
4.670 MI. IS-35/RESURFACE (ASPHALT)FROM SH-66(2ND ST.) EXTEND NORTH IN THE CITY OF EDMOND. |
$1,556,747.00 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/11/2009 |
02/12/2009 |
09/29/2009 |
09/30/2009 |
|
Oklahoma |
IS-40 |
020183 |
1969304 |
IMY-NBIP(281) |
N |
J & N INTERNATIONAL COATINGS, INC. |
0.00 M. BRIDGE PAINTING I-40: OVER NORTH CANADIAN RIVER IN WEST OKC. |
$378,000.00 |
$341,700.00 |
05/23/2002 |
06/03/2002 |
06/19/2002 |
06/26/2002 |
09/09/2002 |
01/10/2003 |
|
Oklahoma |
IS-40 |
070323 |
1742829 |
OKCY-XTWN(010)TI |
N |
MUSKOGEE BRIDGE COMPANY, INC. |
0.72 MI. GRADE, DRAIN & BRIDGE I-40 CROSSTOWN BEGIN AT AGNEW AVE. & EXTEND EAST. |
$23,824,644.74 |
$21,376,614.26 |
09/20/2007 |
10/08/2007 |
10/24/2007 |
10/25/2007 |
11/19/2007 |
|
|
Oklahoma |
IS-40 |
070439 |
2163404 |
ITSY-QT20(035)IT |
N |
TRAFFIC & LIGHTING SYSTEMS, LLC |
0.00 MI. SAFETY IMPROVEMENTS (ROAD WEATHER INFORMATION SYSTEM) VARIOUS LOCATIONS I-40 & I-35. |
$602,658.29 |
$389,201.24 |
11/15/2007 |
12/03/2007 |
12/17/2007 |
01/04/2008 |
04/05/2008 |
09/01/2008 |
|
Oklahoma |
IS-40 |
080112 |
1742867 |
OKCY-XTWN(056)HP |
N |
M & M WRECKING, INC. |
0.00 MI. IS-40;RIGHT-OF-WAY CLEARANCE CONTRACT. MULTIPLE LOCATIONS ALONG IS-40 IN OKLA. CITY. |
$408,094.00 |
$363,203.66 |
01/17/2008 |
02/04/2008 |
02/19/2008 |
02/28/2008 |
03/24/2008 |
03/23/2009 |
|
Oklahoma |
IS-40 |
080120 |
1742826 |
OKCY-XTWN(007)TI/OKCY-XT* |
N |
SHERWOOD CONSTRUCTION CO., INC. |
*WN(008)HP/2.649 MI. GRADE, DRAIN SURFACE, BRIDGE & RAILROAD I-40 E. OF PENN. AVE. EXT. E. / FROM SHARTEL AVE. EXT. W. |
$40,574,036.60 |
$14,874,781.15 |
08/21/2008 |
09/19/2008 |
10/03/2008 |
10/13/2008 |
11/17/2008 |
|
|
Oklahoma |
IS-40 |
080121 |
1742866 |
OKCY-XTWN(055)SG |
N |
OBC, INC. |
0.804 MI. GRADE, DRAIN, SURFACING & BRIDGE I-40 FROM WEST OF MAY AVENUE & EXTEND EAST. |
$6,480,201.78 |
$6,854,271.84 |
05/15/2008 |
06/02/2008 |
06/19/2008 |
06/27/2008 |
08/04/2008 |
04/25/2009 |
|
Oklahoma |
IS-40 |
080305 |
2570604 |
IMC-155A(665) |
N |
C-P INTEGRATED SERVICES, INC. |
7.36 MI.;IS-40/RESURFACE (CONCRETE PATCHING)BEGIN AT MM 165.6, EXTEND EAST. |
$806,017.60 |
$687,839.69 |
07/24/2008 |
08/12/2008 |
08/29/2008 |
09/18/2008 |
10/06/2008 |
01/03/2009 |
|
Oklahoma |
IS-44 |
080360 |
2500004 |
IMG-0035-3(297)138 TR* |
N |
MIDSTATE TRAFFIC CONTROL, INC. |
*SAP-141A(201)/IMG-044-2 (471)223 TR; 0.00 MI. IS-44, SAFETY IMPROVEMENT(MESSAGE SIGN)LOCATIONS DIV. 3,4,5. |
$1,837,942.75 |
$260,193.76 |
11/20/2008 |
12/08/2008 |
12/24/2008 |
12/31/2008 |
01/26/2009 |
07/19/2010 |
|
Oklahoma |
IS-44 |
090053 |
2603204 |
IMY-44-1(111)123 3R |
N |
PENHALL COMPANY |
2.90 MI. IS-44; PAVEMENT RE -HABILITATION/ BEGIN @ N.W. 10TH ST. & EXTEND NORTH. |
$2,852,911.00 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/18/2009 |
02/24/2009 |
06/01/2009 |
08/29/2009 |
|
Oklahoma |
SH-15 |
080341 |
2097504 |
BPMY-NBIP(405)3B |
N |
TARPON INDUSTRIAL, INC. |
0.00 MI.;SH-74/SH-15/NW 10TH ST.; AT VARIOUS LOCATIONS IN DIV. IV. |
$683,130.00 |
$95,400.00 |
09/18/2008 |
10/06/2008 |
10/23/2008 |
11/07/2008 |
02/02/2009 |
05/02/2009 |
|
Oklahoma |
SH-74 |
070391 |
0198104 |
BRFY-055C(657)BF* |
N |
DOBSON BROTHERS CONSTRUCTION CO. |
*STPY-155C(538)HP/2.272 MI. GRADE, DRAIN, SURFACE & BRIDGE SH-74 BEG. 0.2 MI. N. OF 206TH ST. (COVELL RD.) EXT. N. |
$16,425,711.62 |
$16,732,825.64 |
09/20/2007 |
10/08/2007 |
10/22/2007 |
10/26/2007 |
02/04/2008 |
05/23/2009 |
|
Oklahoma |
US-77 |
080093 |
1727104 |
NHY-024N(004) |
N |
ALLEN CONTRACTING, INC./MUSKOGEE BRIDGE CO., INC. (J V) |
1.506 KM GRADE, DRAIN, SURFACE & BRIDGE US-77 (BROADWAY EXTENSION) AT MEMORIAL ROAD INTERCHANGE. |
$27,947,058.47 |
$15,350,001.65 |
02/21/2008 |
03/03/2008 |
03/17/2008 |
03/27/2008 |
07/07/2008 |
12/28/2009 |
|
Oklahoma |
US-77 |
090096 |
2618004 |
SSR-155A(698)SR |
N |
SILVER STAR CONSTRUCTION COMPANY, INC. |
2.090 MI. US-77; RESURFACE (ASPHALT)FROM 33RD ST. NORTH TO 2ND STREET IN EDMOND. |
$980,482.40 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/19/2009 |
02/27/2009 |
07/01/2009 |
09/28/2009 |
|
Okmulgee |
CO.RD. |
090139 |
2104004 |
BRO-156D(088)CO |
N |
BRIDGECO CONTRACTORS, INC. |
0.35 MI. CO.RD.;BRIDGE & APPROACHES;OVER SALT CR., 0.9 MI. NO. & 2.3 MI. WEST OF BEGGS. |
$473,916.61 |
$0.00 |
02/19/2009 |
03/02/2009 |
03/16/2009 |
03/17/2009 |
06/01/2009 |
09/28/2009 |
|
Okmulgee |
SH-16 |
080267 |
2090304 |
BRFY-156C(078) |
N |
WITTWER CONSTRUCTION CO., INC. |
0.123 MI.SH-16; BRIDGE & APPROACHES;OVER TIGER CR., 3.0MI. EAST OF THE CREEK COUNTY LINE. |
$2,167,380.61 |
$1,553,450.48 |
08/21/2008 |
09/19/2008 |
|
10/07/2008 |
01/05/2009 |
|
|
Okmulgee |
US-266 |
080151 |
2452804 |
SBR-156B(140)SB |
N |
PBX CORPORATION |
0.00 MI. US-266;BRIDGE RE- HAB.; OVER COAL CR. APPROX. 0.6 MI. E. OF US-62. |
$601,511.50 |
$576,057.72 |
03/20/2008 |
04/07/2008 |
04/18/2008 |
05/01/2008 |
08/04/2008 |
12/01/2008 |
|
Okmulgee |
US-75 |
080331 |
2415204 |
NHG-014N(068)TR |
N |
ACTION SAFETY SUPPLY CO. |
S0.00 MI. US-75;SAFETY IM- PROVEMENT(CABLE BARRIER) BE- GIN AT DUCK CR.(251ST ST.), EXTEND NORTH. |
$912,636.80 |
$154,157.90 |
08/21/2008 |
09/19/2008 |
10/02/2008 |
10/07/2008 |
01/15/2009 |
|
|
Osage |
SH-99 |
080368 |
2598704 |
HSIPY-157B(156)TR |
N |
MIDSTATE TRAFFIC CONTROL, INC. |
0.00 MI. SH-99; TRAFFIC SIGNALS(SCHOOL ZONE); AT HOMINY HIGH SCHOOL, IN THE CITY OF HOMINY. |
$21,260.95 |
$0.00 |
11/20/2008 |
12/08/2008 |
12/23/2008 |
12/31/2008 |
03/30/2009 |
04/28/2009 |
|
Osage |
US-60 |
050434 |
1623004 |
BRFY-18N(10)/NHY-18N(36) |
N |
M.J. LEE CONSTRUCTION COMPANY |
1.671 MI. GRADE, DRAIN, SURFACE & BRIDGE US-60 BEGIN 5.1 MI. W. OF WASHINGTON COUNTY LINE & EXTEND EAST. |
$4,345,664.39 |
$4,134,162.14 |
07/21/2005 |
08/01/2005 |
08/12/2005 |
09/12/2005 |
02/27/2006 |
02/26/2007 |
|
Osage |
US-60 |
080347 |
2028904 |
TI-018N(030)TI |
N |
VENTURE CORPORATION DBA V. C. O. PAVING |
1.46 MI. US-60;GRADE,DRAIN, SURFACE & BRIDGE;FROM JCT SH- 99, EXTEND EAST. |
$5,776,867.15 |
$1,122,779.19 |
08/21/2008 |
09/19/2008 |
10/03/2008 |
10/30/2008 |
01/05/2009 |
08/02/2009 |
|
Ottawa |
CO.RD. |
090033 |
2289604 |
CIRB-158D(101)RB |
N |
M.J. LEE CONSTRUCTION COMPANY |
0.264 MI. CO.RD.; BRIDGE & APPROACHES;OVER NEOSHO RIVER, 3.4 MI. NO. & 2.0 MI. EAST OF THE SH-125/US-60 JCT. |
$4,175,684.50 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/18/2009 |
02/25/2009 |
07/06/2009 |
04/01/2010 |
|
Pawnee |
US-64 |
070317 |
2408604 |
STPG-159A(069)SS/* |
N |
ACTION SAFETY SUPPLY CO. |
*NHG-019N(107)(108)SS; 0.00 MI. CABLE BARRIER PROJECT US-64/US-412 BEGIN AT SH-48 EXTEND E. TO I-244 IN TULSA. |
$2,920,742.77 |
$1,998,773.74 |
07/19/2007 |
08/06/2007 |
08/21/2007 |
08/30/2007 |
10/03/2007 |
02/29/2008 |
|
Payne |
IS-35 |
080300 |
2330605 |
BRFY-160C(187) |
N |
GARY A. CRAIN, INC. |
0.00 MI. BRIDGE WATERPROOF SEAL I-35/I-40/SH-11/SH-33/SH-51 VARIOUS LOCATIONS IN DIVISION 4. |
$164,870.00 |
$0.00 |
06/19/2008 |
07/14/2008 |
08/05/2008 |
08/12/2008 |
11/03/2008 |
01/31/2009 |
|
Payne |
SH-33 |
080073 |
0635111 |
STPY-160B(188)HP |
N |
ARK WRECKING OF OK., INC. |
0.00 MI.SH-33; RIGHT-OF-WAY CLEARANCE; FROM NEW ALIGNMENT OVER THE CIMARRON RIVER, EXTEND EAST. |
$98,400.00 |
$72,176.00 |
08/21/2008 |
09/19/2008 |
10/02/2008 |
10/07/2008 |
11/12/2008 |
05/10/2009 |
|
Payne |
SH-33 |
080163 |
2452904 |
SBR-160B(172)SB |
N |
PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV) |
0.00 MI. BRIDGE REHABILITATION SH-33 OVER LOST CREEK APPROX. 1.5 MI. E. OF US-177 SOUTH. |
$825,141.55 |
$601,756.57 |
05/15/2008 |
06/02/2008 |
06/12/2008 |
06/27/2008 |
10/06/2008 |
01/03/2009 |
|
Payne |
SH33 |
080126 |
2488804 |
SSR-160B(178)SR |
N |
THE QUAPAW COMPANY |
5.83 MI. RESURFACE (OVERLAY SH-33 BEGIN APPROX. 2.0 MI. E. OF SH-18 IN CUSHING & EXTEND E. (EASTBOUND LANES ONLY). |
$779,556.05 |
$774,634.42 |
02/21/2008 |
03/03/2008 |
03/12/2008 |
03/24/2008 |
07/07/2008 |
10/04/2008 |
|
Pittsburg |
CO.RD. |
090034 |
2077904 |
BRF-161C(118)CO |
N |
OBC, INC. |
0.245 MI. CO.RD.;BRIDGE & APPROACHES;OVER MCALESTER LAKESPILLWAY, 5.6 MI. NO. & 2.0 MI. WEST OF MCALESTER. |
$703,535.49 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/12/2009 |
02/18/2009 |
06/01/2009 |
12/07/2009 |
|
Pittsburg |
SH-144 |
080349 |
2578105 |
BPMY-164C(139)3B |
N |
LOGOS CONSTRUCTION COMPANY |
0.00 MI. SH-144/US-270/US-59 ;JOINT SEAL/REPAIR AT VARIOUS LOCATIONS IN DIV. II |
$185,690.00 |
$122,771.63 |
08/21/2008 |
09/19/2008 |
10/07/2008 |
10/15/2008 |
01/05/2009 |
02/18/2009 |
|
Pittsburg |
SH-31 |
080013 |
2319504 |
BRFY-161C(182)(181)(183) |
N |
PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC |
0.878 MI. BRIDGE & APPRS SH-31 DEER CRK 13.9 MI E SH-31A; UNNAMED CRK 15.2 MI E SH-31A; & UNNAMED CRK 16.9 MI E SH-31A |
$3,394,460.80 |
$3,180,692.88 |
01/17/2008 |
02/04/2008 |
02/11/2008 |
02/19/2008 |
06/02/2008 |
03/28/2009 |
|
Pittsburg |
US-69 |
060363 |
1499804 |
NHY-013N(014) |
N |
TTK CONSTRUCTION CO., INC. |
0.285 MI. GRADE, DRAIN, SURFACE & BRIDGE US-69 @ HEREFORD LANE INTERCHANGE IN MCALESTER. |
$7,211,981.84 |
$7,263,531.88 |
10/19/2006 |
11/06/2006 |
11/21/2006 |
12/11/2006 |
03/05/2007 |
02/27/2008 |
|
Pittsburg |
US-69 |
070291 |
2284504 |
NHY-013N(104)HP |
N |
THE CUMMINS CONSTRUCTION CO., INC. |
2.101 MI. GRADE, DRAIN, BRIDGE & SURFACE US-69 S. END SAFETY IMPRVMNTS. INDIAN NATION TRNPK. INTRCHG. TO AIRPORT RD. |
$3,552,742.39 |
$2,268,232.34 |
07/19/2007 |
08/06/2007 |
08/24/2007 |
08/30/2007 |
12/03/2007 |
08/23/2008 |
|
Pottawatomie |
CO.RD. |
090069 |
2511504 |
ERSTP-163C(223)ER |
N |
CCC CONSTRUCTION, INC. |
0.00 MI. CO.,RD.; BANK PRO- TECTION/ RIP RAP;OVER NORTH CANADIAN RIVER, 2 MI. NORTH OF I-40. |
$58,633.50 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/18/2009 |
02/27/2009 |
03/23/2009 |
05/21/2009 |
|
Pottawatomie |
CO.RD. |
090159 |
1969504 |
BRF-163C(105) CO |
N |
SEWELL BROTHERS, INC. |
0.075 MI. CO.RD.;BRIDGE & APPROACHES;OVER AN UNNAMED CR., 1.0 MI. NO. & 0.2 MI. EAST OF BETHEL ACRES. |
$624,890.70 |
$0.00 |
02/19/2009 |
03/02/2009 |
03/10/2009 |
03/12/2009 |
04/13/2009 |
08/10/2009 |
|
Pottawatomie |
I-40 |
070247 |
2409104 |
IMG-0040-5(397)173 |
N |
MIDSTATE TRAFFIC CONTROL, INC. |
SAFETY IMPROVEMENT (CABLE BARRIER PROJECT) I-40 BEGIN AT THE OKLAHOMA/POTTAWATOMIE COUNTY LINE & EXTEND E. TO SH-18 JCT. |
$965,872.75 |
$781,413.05 |
06/14/2007 |
07/16/2007 |
08/02/2007 |
08/10/2007 |
09/04/2007 |
|
|
Pottawatomie |
I-40 |
080166 |
2409105 |
IMY-0040-5(403)185TR |
N |
HASKELL LEMON CONSTRUCTION CO. |
2.064 MI. GRD, DRN, SURF, STRP, & LIGHT BEG 0.4 MI W SH-3E (KICKAPOO AVE) EXT E TO 1.2 MI E SH-18 (HARRISION AVE). |
$4,444,270.51 |
$4,600,947.72 |
03/20/2008 |
04/07/2008 |
04/18/2008 |
05/02/2008 |
08/04/2008 |
03/11/2009 |
|
Pottawatomie |
I-40 |
070357 |
2100204 |
BRIY-40-5(387)180 |
N |
ALLEN CONTRACTING, INC. |
0.530 MI. BRIDGE & APPROACHES I-40 OVER NORTH CANADIAN OVER FLOW 6.1 MI. E. OF OKLAHOMA COUNTY LINE. |
$7,778,240.30 |
$7,840,313.64 |
10/18/2007 |
11/05/2007 |
11/20/2007 |
11/28/2007 |
02/04/2008 |
10/30/2008 |
|
Pottawatomie |
SH-9 |
090084 |
2463004 |
STPY-163C(219)3R |
N |
HASKELL LEMON CONSTRUCTION CO. |
1.840 MI. SH-9;RESURFACE (ASPHALT)FROM 1.84 MI. WEST OFUS-177 EXTEND EAST IN TECUMSEH. |
$459,467.50 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/11/2009 |
02/12/2009 |
07/30/2009 |
07/31/2009 |
|
Pottawatomie |
US-177 |
090006 |
2588104 |
HSIPY-163B(324)TR |
N |
TRAFFIC SIGNALS, INC. |
0.00 MI. US-177;TRAFFIC SIGNALS:AT THE INTERSECTION OFUS-177 AND BENSON PARK RD. IN TECUMSEH. |
$111,343.91 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/19/2009 |
02/27/2009 |
05/30/2009 |
08/27/2009 |
|
Pushmataha |
US-270 |
090007 |
2091904 |
BRFY-164F(142) |
N |
PARADIGM CONSTRUCTION & ENGINEERING, INC |
0.00 MI. US-270;JOINT SEAL/ REPAIR. SH-31/SH-109/US-270/ US-271; AT VARIOUS LO- CATIONS IN DIV. II. |
$217,686.69 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/18/2009 |
02/25/2009 |
03/16/2009 |
08/12/2009 |
|
Pushmataha |
US-270 |
090008 |
2091905 |
BRFY-NBIP(407) |
N |
SEMINOLE EQUIPMENT, INC. |
0.00 MI.;US-270/US-271/US- 70. BRIDGE PAINTING/SH-109;AT VARIOUS LOCATIONS IN DIV. II. |
$595,070.00 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/20/2009 |
03/06/2009 |
06/01/2009 |
08/29/2009 |
|
Pushmataha |
US-271 |
080197 |
2101704 |
BRFY-164B(062)HP |
N |
L&N BRIDGE, LLC |
0.59 MI. US-271;BRIDGE & APPROACHES;OVER BIG CEDAR CR.,NORTHEAST OF FINLEY. |
$3,379,750.26 |
$792,522.65 |
07/24/2008 |
08/12/2008 |
08/27/2008 |
09/03/2008 |
12/01/2008 |
08/07/2009 |
|
Roger Mills |
SH-33 |
080375 |
2081204 |
BRFY-165C(044) |
N |
SEWELL BROTHERS, INC. |
0.813 MI. SH-33; BRIDGE & APPROACHES/ OVER THE WASHITA RIVER, 5.4 MI. EAST OF US- 283. |
$5,365,966.00 |
$3,494,142.27 |
10/16/2008 |
11/03/2008 |
11/13/2008 |
11/20/2008 |
01/05/2009 |
06/13/2009 |
|
Rogers |
CTST |
080237 |
2268604 |
STP-166D(170)UR |
N |
KLAVER CONSTRUCTION COMPANY, INC. |
0.048 MI. CT.ST.; GRADE, DRAIN,SURFACE & BRIDGE;OVER CAT CR. TRIBUTARY, 0.6 MI. NO. OF BLUE STAR DRIVE. |
$319,486.30 |
$266,545.37 |
06/19/2008 |
07/14/2008 |
07/25/2008 |
08/18/2008 |
10/06/2008 |
01/03/2009 |
|
Rogers |
I-44 |
090100 |
2613304 |
SSR-166N(228)SR* |
N |
BECCO CONTRACTORS, INC. |
*/SSR-172N(447)SR /2.910 MI. RESURFACE(ASPHALT)FROM I-244, EXTEND EAST. |
$1,023,576.00 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/11/2009 |
02/12/2009 |
06/01/2009 |
07/30/2009 |
|
Rogers |
SH-88 |
050537 |
1888704 |
STPY-166C(71) |
N |
WITTWER CONSTRUCTION CO., INC. |
3.49 MI. GRADE, DRAIN, SURFACE & BRIDGE SH-88 BEGIN @ US-412 & EXTEND NORTH. |
$11,449,145.00 |
$11,059,176.57 |
06/15/2006 |
07/10/2006 |
07/27/2006 |
10/04/2006 |
11/06/2006 |
12/10/2007 |
|
Seminole |
CORD |
080453 |
2261104 |
BRO-167D(114)CO |
N |
OBC, INC. |
0.245 MI. BRIDGE & APPROACHES COUNTY RD. OVER WEWOKA CRK. 5.0 MI. E. & 1.9 MI. N. OF BOWLEGS. |
$787,811.17 |
$166,438.33 |
10/16/2008 |
11/03/2008 |
11/13/2008 |
11/19/2008 |
03/02/2009 |
07/29/2009 |
|
Seminole |
IS-40 |
090019 |
2612204 |
IMC-167A(163) |
N |
CP3 ENTERPRISES, INC. |
5.500 MI.; IS-40/CONCRETE PATCHING; BEGIN 7.5 MI. EAST OF JCT US-377, EXT. EAST. |
$126,201.07 |
$0.00 |
01/22/2009 |
03/02/2009 |
03/16/2009 |
03/17/2009 |
06/01/2009 |
07/30/2009 |
|
Seminole |
SH-56 |
080415 |
2321304 |
STPY-167C(129) |
N |
C-GAWF CONSTRUCTION, INC. |
0.072 MI. SH-56; GRADE, DRAIN,SURFACE & BRIDGE; OVER A UNNAMED CR., 1.0 MI. SO. OF US-270. |
$685,366.90 |
$449,547.90 |
08/21/2008 |
09/19/2008 |
10/07/2008 |
10/15/2008 |
01/05/2009 |
03/25/2009 |
|
Seminole |
SH-56 |
090085 |
2584004 |
STPY-167C(158)3R |
N |
THE CUMMINS CONSTRUCTION CO., INC. |
5.20 MI. SH-56;RESURFACE (ASPHALT) BEGIN AT US-270B IN WEWOKA AND EXTEND NORTH. |
$1,089,078.00 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/18/2009 |
02/24/2009 |
|
07/31/2009 |
|
Seminole |
SH-99 |
070445 |
1302004 |
NHY-012N(019) |
N |
THE CUMMINS CONSTRUCTION CO., INC. |
8.665 KM GRADE, DRAIN & SURFACING SH-99 BEGIN N. OF I-40 & EXTEND N. TO PRAGUE. |
$11,884,548.98 |
$3,136,043.65 |
11/15/2007 |
12/03/2007 |
12/17/2007 |
12/31/2007 |
04/07/2008 |
06/30/2009 |
|
Seminole |
SH-9A |
080423 |
1020804 |
BRFY-067C(210)HP |
N |
THE CUMMINS CONSTRUCTION CO., INC. |
1.68 MI. GRADE, DRAIN, SURFACE & BRIDGE SH-9A OVER BRUNO CRK. & SALT CRK. 3.4 MI. S. OF MAUD. |
$7,688,706.80 |
$394,902.70 |
09/18/2008 |
10/06/2008 |
10/23/2008 |
10/29/2008 |
02/02/2009 |
10/09/2009 |
|
Sequoyah |
CORD |
070119 |
2074304 |
BRO-168D(116)CO |
N |
PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC |
0.122 MI. BRIDGE & APPROACHES ON COUNTY RD. APPROX. 2.9 MI. E. & 0.7 MI. N. OF LIBERTY. |
$251,248.75 |
$261,272.60 |
03/15/2007 |
04/02/2007 |
04/10/2007 |
04/17/2007 |
08/06/2007 |
11/03/2007 |
|
Sequoyah |
CORD |
080194 |
1941204 |
BRO-168D(097)CO |
N |
OBC, INC. |
0.215 MI. CO.RD.;BRIDGE & APPROACHES, ON EW-104, 0.1 MI.WEST OF US-59.SH-101 JCT. |
$521,238.29 |
$503,953.24 |
04/17/2008 |
04/25/2008 |
05/05/2008 |
05/09/2008 |
09/08/2008 |
01/05/2009 |
|
Sequoyah |
I-40 |
070217 |
2410604 |
SSP-168N(174)SS |
N |
FULSOM CONSTRUCTION COMPANY, INC. |
0.00 MI. I-40 SAFETY IMPRO- VEMENT (CABLE BARRIER) BEGIN FROM ILE POST 311 AND EX- TEND NORTH TO MILE POST 318. |
$701,271.50 |
$626,298.71 |
06/14/2007 |
07/16/2007 |
07/27/2007 |
08/07/2007 |
09/04/2007 |
12/02/2007 |
|
Sequoyah |
I-40 |
070250 |
2410605 |
IMG-0040-6(352)318 TR |
N |
FULSOM CONSTRUCTION COMPANY, INC. |
0.00 MI. I-40;SAFETY IMPRO- VEMENT(CABLE BARRIER PROJ.) FROM MILE POST 3189.5 TO MILE POST 322. |
$378,008.75 |
$364,957.85 |
06/14/2007 |
07/16/2007 |
07/27/2007 |
08/09/2007 |
09/03/2007 |
10/17/2007 |
|
Sequoyah |
IS-40 |
080232 |
2439405 |
BPMY-NBIP(389)3B |
N |
POSEDION CONSTRUCTION, INC. |
0.00 MI. IS-40;BRIDGE PAINT -ING;US-75B/SH-10;AT VARIOUS LOCATIONS IN DIV. 1. |
$332,815.00 |
$238,155.00 |
05/15/2008 |
06/02/2008 |
06/16/2008 |
08/15/2008 |
10/06/2008 |
01/03/2009 |
|
Sequoyah |
SH-101 |
070304 |
2174104 |
BRFY-168C(134)BF |
N |
MUSKOGEE BRIDGE COMPANY, INC. |
0.258 MI. BRIDGE & APPROACHES SH-101 OVER LITTLE SALLISAW CRK. & TRIBUTARY 3.4 & 3.9 MI. E. OF JCT. US-59. |
$1,753,431.60 |
$1,678,449.64 |
07/19/2007 |
08/06/2007 |
08/20/2007 |
08/23/2007 |
12/03/2007 |
04/30/2008 |
|
Sequoyah |
US-59 |
050641 |
1767004 |
ACNHY-033N(011)GB |
N |
SHERWOOD CONSTRUCTION CO., INC. |
2.803 MI. GRADE & DRAIN US-59 FROM 2.7 MI. S. OF I-40 EXTEND SOUTH. |
$14,250,383.10 |
$13,894,899.23 |
08/17/2006 |
09/11/2006 |
09/28/2006 |
10/11/2006 |
01/08/2007 |
01/04/2008 |
|
Sequoyah |
US-59 |
080139 |
1767005 |
NHY-033N(012) |
N |
DUIT CONSTRUCTION COMPANY, INC. |
2.968 MI. US-59;SURFACE; BEGIN 2.7 MI. SO. OF I-40,EX- TEND SOUTH. |
$7,688,456.48 |
$6,340,944.44 |
03/20/2008 |
04/07/2008 |
04/16/2008 |
04/25/2008 |
08/04/2008 |
04/05/2009 |
|
Sequoyah |
US-59 |
080333 |
2578804 |
SSR-168N(192)SR |
N |
DUIT CONSTRUCTION COMPANY, INC. |
1.610 MI.;US-59/RESURFACE (CONCRETE), 0.9 MI. NO. OF THEARKANSAS RIVER, EXTEND NO. (NORTHBOUND LANES ONLY). |
$1,516,308.64 |
$1,486,677.85 |
07/24/2008 |
08/12/2008 |
08/15/2008 |
08/18/2008 |
09/08/2008 |
10/07/2008 |
|
Sequoyah |
US-59 |
050224 |
1695204 |
ACSTPY-168A(023)GB |
N |
GLOVER CONSTRUCTION CO., INC. |
1.70 MI. GRADE, DRAIN & SURFACE US-59 FROM THE ARKANSAS RVR. EXTEND N. TO THE SH-141 JCT. IN SEQUOYAH CO. |
$5,289,626.58 |
$6,626,926.50 |
08/18/2005 |
09/06/2005 |
09/22/2005 |
10/12/2005 |
01/02/2006 |
01/01/2007 |
|
Sequoyah |
US-59 |
090009 |
2592604 |
CIP-168N(193)IP |
N |
JOB CONSTRUCTION CO., INC. |
2.61 MI. US-59/RESURFACE (ASPHALT)BEGIN AT THE NORTH END OF THE ARKANSAS RIVER BRIDGE & EXTEND NORTH. |
$1,213,982.60 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/18/2009 |
02/25/2009 |
03/30/2009 |
05/13/2009 |
|
Stephens |
CO.RD. |
080363 |
2392604 |
CR-169C(127) |
N |
K & R BUILDERS, INC. |
0.359 MI. CO.RD.; GRADE, DRAIN & SURFACE; AT NS-279/EW-168, 3.0 MI. WEST & 1.0 MI. SOUTH OF US-81/SH-7. |
$419,392.54 |
$41,426.16 |
11/20/2008 |
12/08/2008 |
12/23/2008 |
01/02/2009 |
03/02/2009 |
05/30/2009 |
|
Stephens |
CT.ST. |
080371 |
2298004 |
STP-169B(117)UR* |
N |
T & G CONSTRUCTION, INC. |
*SSP-169A(129)SS/ 1.20 MI. CT.ST.; GRADE,DRAIN,SURFACE TRAFFIC SIGNALS;FROM THE DUNCAN BYPASS TO CHISHOLM TRAI |
$2,724,129.58 |
$0.00 |
11/20/2008 |
12/08/2008 |
12/19/2008 |
12/31/2008 |
04/06/2009 |
12/01/2009 |
|
Stephens |
SH-7 |
060395 |
2347104 |
SBR-169N(121)SB |
N |
BRUTON CONSTRUCTION CO., INC. |
0.00 MI. BRIDGE REPAIR SH-7 LITTLE BEAVER CRK, O'FLOW LITTLE BEAVER CRK & HELL CRK APPROX 5.4 MI E OF COMANCHE CO. LINE. |
$799,504.12 |
$781,072.15 |
11/16/2006 |
12/04/2006 |
12/21/2006 |
01/05/2007 |
04/02/2007 |
12/07/2007 |
|
Stephens |
SH-7 |
090055 |
2581304 |
NHY-021N(049)3R |
N |
T & G CONSTRUCTION, INC. |
4.700 MI. SH-7;RESURFACE( ASPHALT), BEGIN 4.9 MI. E. OF COMANCHE COUNTY LINE, EX- TEND EAST,(WESTBOUND LANES) |
$1,570,789.40 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/20/2009 |
02/26/2009 |
|
07/31/2009 |
|
Stephens |
US-81 |
080248 |
2031614 |
NHY-021N(042)(48)HP |
N |
T & G CONSTRUCTION, INC. |
1.11 MI. GRADE, DRAIN & SURFACE US-81 (DUNCAN BYPASS) INTERCHANGE RAMPS AT BEECH AVE. |
$2,894,964.71 |
$1,953,555.69 |
05/15/2008 |
06/02/2008 |
06/12/2008 |
06/30/2008 |
10/06/2008 |
05/23/2009 |
|
Stephens |
US-81 |
080288 |
2463204 |
SSR-169A(143)SR |
N |
T & G CONSTRUCTION, INC. |
4.080 MI. US-81 RESURFACE (ASPHALT);BEGIN AT NORTHERN JCT. OF US-81/SH-7 & EX- TEND SOUTH. |
$946,172.50 |
$815,115.47 |
06/19/2008 |
07/14/2008 |
07/29/2008 |
07/31/2008 |
09/08/2008 |
|
|
Texas |
CORD |
090089 |
2402204 |
BRF-170C(121)CO |
N |
BEHNE CONSTRUCTION CO., INC. |
0.169 MI. CO.RD.; BRIDGE & APPROACHES/ OVER PONY CR.,0.6 MI. WEST & 3.4 MI. NO. OF OPTIMA. |
$699,957.88 |
$0.00 |
02/19/2009 |
03/02/2009 |
|
|
|
|
|
Texas |
SH-136 |
090020 |
2581504 |
SSR-170C(146)SR* |
N |
HIGHWAY CONTRACTORS, INC. |
*SSR-170N(147)SR/ 11.500 MI. SH-136; RESURFACE(ASPHALT) BEGIN 4.0 MI. NO. OF THE TEXAS S/L, EXT. NORTH. |
$1,498,270.00 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/18/2009 |
02/24/2009 |
|
07/31/2009 |
|
Texas |
SH95 |
080198 |
2172508 |
STPY-170A(122) |
N |
L & M CONTRACTORS, INC. |
0.222 MI. GRADE, DRAIN, SURFACE & BRIDGE SH-95 OVER TEEPEE CRK. APPROX. 3.2 MI. S. OF US-64. |
$1,953,777.40 |
$1,412,123.11 |
04/17/2008 |
04/25/2008 |
05/09/2008 |
07/15/2008 |
09/08/2008 |
04/05/2009 |
|
Texas |
US-54 |
080128 |
2493504 |
NHY-008N(075)(76)3R |
N |
J & R SAND COMPANY, INC. |
9.5 MI. RESURF (OVRLAY) US-54 BEG APPROX 4.82 MI NE US-64 EXT NE/US-54 BEG APPROX 8.82 MI NE US-64 EXT NE. |
$2,941,908.90 |
$1,940,995.05 |
02/21/2008 |
03/03/2008 |
03/12/2008 |
03/27/2008 |
07/07/2008 |
10/13/2008 |
|
Texas |
US-54 |
080238 |
2031204 |
NHY-008N(047) |
N |
J & R SAND COMPANY, INC. |
3.049 MI. US-54;GRADE,DRAIN & EROSION CONTROL/0.5 MI. N.E.OF US-64, EXTEND NORTHEAST. |
$1,159,399.23 |
$649,534.87 |
06/19/2008 |
07/14/2008 |
07/23/2008 |
07/29/2008 |
11/03/2008 |
02/20/2009 |
|
Texas |
US-54 |
080350 |
2083904 |
NHY-008N(050) |
N |
J & R SAND COMPANY, INC. |
0.890 MI.;US-54:FROM 0.80 MI. SO. OF US-64 IN HOOKER, EXTEND NORTH. |
$5,346,047.78 |
$100,741.50 |
11/20/2008 |
12/08/2008 |
12/18/2008 |
01/16/2009 |
04/06/2009 |
03/01/2010 |
|
Texas |
US-54 |
090037 |
1497105 |
NHY-008N(007) |
N |
DONDLINGER & SONS CONSTRUCTION CO., INC. |
4.92 MI. US-54;GRADE,DRAIN & EROSION CONTROL;5.0 MI. NO. OF OPTIMA,EXTEND NO. TO 1. 25 MI. SO. OF US-64. |
$1,968,120.13 |
$0.00 |
02/19/2009 |
03/02/2009 |
|
|
|
|
|
Texas |
US-64 |
090090 |
2564304 |
STPY-170B(143)(144)3R |
N |
J & R SAND COMPANY, INC. |
10.00 MI. US-64; RESURFACE (ASPHALT)BEGIN 3.0 MI. EAST OFSH-95N AND EXTEND EAST. |
$2,768,775.80 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/12/2009 |
02/18/2009 |
|
07/31/2009 |
|
Tillman |
US-183 |
090058 |
2604004 |
STPY-171B(129)3R |
N |
DOBSON BROTHERS CONSTRUCTION CO. |
7.5 MI. US-183;RESURFACE (ASPHALT)BEGIN AT NORTH END OFRED RIVER BRIDGE, EXTEND NORTH. |
$1,827,348.85 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/12/2009 |
02/23/2009 |
|
05/31/2009 |
|
Tillman |
US-183 |
090059 |
2611704 |
SSP-171B(130)SS |
N |
APAC-OKLAHOMA, INC. |
0.840 MI.US-183 WIDEN & RESURFACE. BEGIN 9.7 MI. NORTHOF US-70, EXTEND NORTH. |
$1,482,420.27 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/18/2009 |
02/25/2009 |
|
09/01/2009 |
|
Tulsa |
CO.RD. |
080455 |
2409504 |
BRF-172C(350)CO |
N |
WITTWER CONSTRUCTION CO., INC. |
0.085 MI. CO.RD./ BRIDGE & APPROACHES;OVER MUD CREEK, 2.5MI. EAST & 0.8 MI. SOUTH OF THE SH-51/SH-151 JCT. |
$287,489.68 |
$0.00 |
11/20/2008 |
12/08/2008 |
12/30/2008 |
01/02/2009 |
04/06/2009 |
07/04/2009 |
|
Tulsa |
CT.ST. |
060233 |
1842606 |
STP-172A(230)(149)IG |
N |
SHERWOOD CONSTRUCTION CO., INC. |
2.229 MI. GRADING & DRAINAGE CITY STREET (GILCREASE EXPWY.) L.L. TISDALE TO LEWIS AVENUE. |
$14,837,819.91 |
$14,338,805.84 |
07/20/2006 |
08/07/2006 |
08/23/2006 |
09/11/2006 |
10/02/2006 |
02/13/2008 |
|
Tulsa |
CT.ST. |
090024 |
1842906 |
STP-172B(443)(445)IG* |
N |
BECCO CONTRACTORS, INC. |
STPG-172-172B(444)(446)IG / 0.794 MI. CT.ST.,GRADE,DRAIN, SURFACE & TRAFFIC SIGNALS. AT THE INTERSECTION OF ELM ST. |
$2,126,549.74 |
$0.00 |
01/22/2009 |
02/02/2009 |
02/12/2009 |
02/18/2009 |
03/23/2009 |
07/20/2009 |
|
Tulsa |
I-244 |
080425 |
2543904 |
SBR-172N(409)(410)(435)SB |
N |
BECCO CONTRACTORS, INC. |
0.00 MI. IS-244; BRIDGE REPAIR;OVER MINGO RD.,6.26 MI.E. OF IS-44.I-244;OVER 89TH AVE. 5.74 MI. |
$3,971,640.45 |
$509,073.99 |
09/18/2008 |
10/06/2008 |
10/14/2008 |
10/16/2008 |
03/02/2009 |
11/26/2009 |
|
Tulsa |
I-244 |
080443 |
2458304 |
BHIY-0244-2(472) 096 |
N |
PBX CORPORATION |
0.027 MI. I-244; BRIDGE REHABILITATION/ENTRANCE RAMP OVER 1ST. STREET. |
$807,534.75 |
$0.00 |
09/18/2008 |
10/06/2008 |
10/21/2008 |
10/30/2008 |
03/16/2009 |
05/29/2009 |
|
Tulsa |
I-44 |
060249 |
2295904 |
HSIPG-172N(304)TR |
N |
ACTION SAFETY SUPPLY CO. |
0.00 MI.DELINEATION & SIGN -ING PROJECT;TULSA METRO- AREA; AT VARIOUS LOCATIONS. |
$408,666.43 |
$348,262.79 |
03/15/2007 |
04/02/2007 |
04/12/2007 |
04/17/2007 |
07/15/2007 |
11/11/2007 |
|
Tulsa |
I-44 |
070151 |
0637466 |
SEC117-172N(344)SG |
N |
ARK WRECKING OF OK., INC. |
0.00 MI. RIGHT-OF-WAY CLEARANCE PROJECT I-44 NORT SIDE OF I-44 FROM RIVERSIDE DRV. TO UTICA AVE. IN TULSA. |
$258,600.00 |
$263,795.00 |
05/17/2007 |
06/04/2007 |
06/18/2007 |
07/09/2007 |
08/13/2007 |
04/08/2008 |
|
Tulsa |
I-44 |
080028 |
0637473 |
IMY-0044-2(464)227RW |
N |
D T SPECIALIZED SERVICES, INC. |
0.00 MI. RIGHT-OF-WAY CLEARANCE CONTRACT I-44 AT HARVARD AVENUE IN THE CITY OF TULSA. |
$178,288.00 |
$166,817.65 |
01/17/2008 |
02/04/2008 |
02/21/2008 |
03/03/2008 |
04/07/2008 |
12/02/2008 |
|
Tulsa |
I-44 |
080200 |
0637474 |
IM-0044-2(469)227SG |
N |
ARK WRECKING OF OK., INC. |
0.00 MI. I-44; RIGHT-OF-WAY CLEARANCE;FROM EAST OF RIVER- SIDE DR., EAST TO WEST OF YALE AVE. |
$45,600.00 |
$39,348.00 |
04/17/2008 |
04/25/2008 |
05/09/2008 |
05/19/2008 |
06/23/2008 |
12/19/2008 |
|
Tulsa |
I-44 |
080454 |
0637468 |
IMY-0044-2(473)225 NI |
N |
SHERWOOD CONSTRUCTION CO., INC. |
1.30 MI. IS-44; SURFACING, GRADING,DRAINAGE & UTILITIES ;NORTH FRONTAGE RD. FROM THE ARKANSAS RIVER,EXTEND EAST |
$42,395,254.70 |
$5,310,860.77 |
10/16/2008 |
11/03/2008 |
11/13/2008 |
11/20/2008 |
03/02/2009 |
03/31/2011 |
|
Tulsa |
I-44 |
080169 |
2508104 |
IMG-44-2(465)230 TR* |
N |
ACTION SAFETY SUPPLY CO. |
*/IMG-244-2(466)000TR/NHY- 30N(062)TR;0.00 MI. I-44;STRIP-ING & PAVEMENT MARKING;BE- GIN AT MILE MARKER 230,EXT. NO |
$787,323.47 |
$244,070.01 |
03/20/2008 |
04/07/2008 |
04/18/2008 |
05/01/2008 |
05/19/2008 |
12/14/2008 |
|
Tulsa |
IS-44 |
070446 |
0637472 |
SEC115-172A(388)SG |
N |
D T SPECIALIZED SERVICES, INC. |
0.00 MI.;IS-44/RIGHT-OF-WAY CLEARANCE CONTRACT;BEGIN AT RIVERSIDE DR. & EXTEND EAST TO YALE AVE. IN TULSA. |
$375,272.88 |
$369,740.15 |
11/15/2007 |
12/03/2007 |
12/19/2007 |
01/03/2008 |
02/04/2008 |
09/30/2008 |
|
Tulsa |
IS-44 |
080240 |
0637475 |
IM-0044-2(470)227SG |
N |
D T SPECIALIZED SERVICES, INC. |
0.00 MI. RIGHT-OF-WAY CLEAR- ANCE CONTRACT/ IS-44;BEGIN AT RIVERSIDE DR., EXTEND EAST. |
$524,988.00 |
$349,461.96 |
05/15/2008 |
06/02/2008 |
06/24/2008 |
06/27/2008 |
08/04/2008 |
03/31/2009 |
|
Tulsa |
IS-44 |
080351 |
0637476 |
SEC115-172N(434)SG |
N |
ARK WRECKING OF OK., INC. |
0.00 MI. IS-44; RIGHT-OF- WAY CLEARANCE. BEGIN AT RIVER-SIDE DRIVE & EXTEND EAST. |
$247,500.00 |
$182,410.00 |
08/21/2008 |
09/19/2008 |
10/02/2008 |
10/07/2008 |
11/12/2008 |
07/09/2009 |
|
Tulsa |
IS-44 |
090070 |
0637478 |
SEC1702Y-172N(453)HP |
N |
ARK WRECKING OF OK., INC. |
0.00 MI. IS-44;RIGHT-OF- WAY CLEARANCE CONTRACT;FROM RIVERSIDE DR. EAST TO YALE AVENUE IN TULSA. |
$767,000.00 |
$0.00 |
02/19/2009 |
03/02/2009 |
03/10/2009 |
03/12/2009 |
04/13/2009 |
12/08/2009 |
|
Tulsa |
IS-44 |
090071 |
0637479 |
SEC117-172N(454)SG |
N |
ARK WRECKING OF OK., INC. |
0.00 MI. IS-44;RIGHT-OF-WAY CLEARANCE CONTRACT;FROM RIVER-SIDE DR. EAST TO YALE AVENUE IN TULSA. |
$847,000.00 |
$0.00 |
02/19/2009 |
03/02/2009 |
03/10/2009 |
03/12/2009 |
04/13/2009 |
12/08/2009 |
|
Tulsa |
SH-20 |
070305 |
2192204 |
SAB-172A(269)BF |
N |
SHERWOOD CONSTRUCTION CO., INC. |
0.319 MI. SH-20/ GRADING, DRAINAGE, BRIDGE,SURFACING & EROISION CONTROL.OVER BLACKJACK CR., APPROX. 0.1. |
$2,156,881.20 |
$2,122,426.11 |
08/16/2007 |
09/10/2007 |
09/20/2007 |
10/02/2007 |
01/07/2008 |
07/04/2008 |
|
Tulsa |
SH-51 |
090099 |
2545104 |
STPY-172A(413)3R |
N |
BECCO CONTRACTORS, INC. |
2.84 MI. SH-51;RESURFACE (ASPHALT)(BROKEN ARROW EXPWY) FROM HARVARD AVENUE,EAST TO IS-44. |
$1,971,974.00 |
$0.00 |
02/19/2009 |
03/02/2009 |
03/10/2009 |
03/12/2009 |
04/06/2009 |
06/04/2009 |
|
Tulsa |
SH-97 |
080103 |
0000514 |
STPY-072A(475)TR |
N |
MIDSTATE TRAFFIC CONTROL, INC. |
0.00 MI. SH-97;LIGHTING; FROM 41ST SOUTH, NORTH TO US- 62 IN SAND SPRINGS. |
$539,359.50 |
$483,771.55 |
04/17/2008 |
04/25/2008 |
05/09/2008 |
06/12/2008 |
09/08/2008 |
03/06/2009 |
|
Tulsa |
SH-97 |
080436 |
2412704 |
SSP-172A(438)SS |
N |
ACTION SAFETY SUPPLY CO. |
0.00 MI. SH-97/SAFETY IMPROV. (CABLE BARRIER PROJECT);BEGIN AT WEST 51ST ST. & EXT. NORTH. |
$222,486.62 |
$0.00 |
01/22/2009 |
03/02/2009 |
03/09/2009 |
03/11/2009 |
04/06/2009 |
05/20/2009 |
|
Tulsa |
US-169 |
080066 |
2411004 |
NHG-030N(059)TR |
N |
ACTION SAFETY SUPPLY CO. |
0.00 MI. US-169;SAFETY IM- PROVEMENT(CABLE BARRIER PRO- JECT) BEGIN AT E. 36TH ST. EXTEND NO. TO BIRD CR. OVERFLO |
$673,832.59 |
$569,403.63 |
02/21/2008 |
03/03/2008 |
03/12/2008 |
03/24/2008 |
05/05/2008 |
|
|
Tulsa |
US-64 |
080352 |
2578504 |
BPMY-NBIP(403)3B |
N |
TEXAS BRIDGE PARTNERS, L.P. |
0.00 MI. US-64;BRIDGE PAINT -ING US-I-244/US-75, AT VARIOUS LOCATIONS IN DIV. III. |
$430,380.00 |
$422,337.00 |
08/21/2008 |
09/19/2008 |
10/02/2008 |
11/06/2008 |
01/05/2009 |
02/18/2009 |
|
Tulsa |
US-64 |
080365 |
2316304 |
STPY-172A(315) |
N |
APAC-OKLAHOMA, INC. |
1.491 MI. WIDENING & RESURFACE US-64 BEGIN AT CREEK TURNPIKE AND EXTEND SOUTH. |
$2,806,128.74 |
$188,987.69 |
11/20/2008 |
12/08/2008 |
12/19/2008 |
12/30/2008 |
03/02/2009 |
10/07/2009 |
|
Tulsa |
US-64 |
770600 |
0945604 |
SAP-72(327) |
N |
REPUBLIC PAVING CO. |
0.0000 Mis. Br. Rep. in Tulsa on US-64 at Br. No. 7286-0699X(W. 129th W. Ave. over US-64). |
$8,900.00 |
$8,900.00 |
02/26/1988 |
03/07/1988 |
03/10/1988 |
03/24/1988 |
04/07/1988 |
05/02/1988 |
|
Tulsa |
US-64 |
080353 |
2578505 |
BPMY-172N(423)3B |
N |
GIBSON & ASSOCIATES, INC. |
0.00 MI. US-64/US-75/I-244; JOINT SEAL/REPAIR, AT VARIOUS LOCATIONS IN DIV. VIII. |
$584,011.05 |
$0.00 |
08/21/2008 |
09/19/2008 |
09/30/2008 |
11/10/2008 |
03/02/2009 |
05/15/2009 |
|
Tulsa |
US-75 |
070376 |
2411104 |
NHG-014N(067)TR |
N |
ACTION SAFETY SUPPLY CO. |
0.00 MI. SAFETY IMPROVEMENT (CABLE BARRIER PROJECT) US-75 BEGIN AT 81ST EXTEND N. TO I-244 IN TULSA. |
$794,183.40 |
$469,896.33 |
08/16/2007 |
09/10/2007 |
09/24/2007 |
10/02/2007 |
11/05/2007 |
02/02/2008 |
|
Tulsa |
US-75 |
080140 |
2415404 |
NHY-014N(069) |
N |
BECCO CONTRACTORS, INC. |
5.570 MI. US-75;PAVEMENT RE- HABILITATION.BEGIN NO. OF I- 244 & EXTEND NO. TO 56TH ST. NO. (SOUTHBOUND ONLY). |
$1,655,768.28 |
$1,616,699.90 |
03/20/2008 |
04/07/2008 |
04/16/2008 |
04/25/2008 |
08/04/2008 |
01/30/2009 |
|
Tulsa |
US-75 |
080251 |
1738707 |
NHY-014N(078)RW |
N |
ARK WRECKING OF OK., INC. |
0.00 MI. US-75./CT.ST.; RIGHT-OF-WAY CLEARANCE CON- TRACT;BETWEEN 121ST ST. SO. & 111TH ST. SO. CT.ST. |
$116,000.00 |
$110,200.00 |
05/15/2008 |
06/02/2008 |
06/19/2008 |
06/27/2008 |
07/21/2008 |
11/17/2008 |
|
Wagoner |
SH-72 |
080223 |
2091404 |
BRFY-173B(083) |
N |
M.J. LEE CONSTRUCTION COMPANY |
0.155 MI. GRADE, DRAIN, SURFACE, BRIDGE & RAILROAD SH-72 OVER UNNAMED CRK. @ JCT. SH-51 IN COWETA. |
$7,973,218.60 |
$607,175.74 |
09/18/2008 |
10/06/2008 |
10/23/2008 |
10/28/2008 |
02/02/2009 |
12/28/2009 |
|
Washington |
CO.RD. |
080335 |
2209104 |
BRF-174C(037)CO* |
N |
BEACHNER CONSTRUCTION CO., INC. |
*/CIRB-74C(157)RB/ 0.429 MI. CO.RD.; BRIDGE & APPROACHES AT DEER CR., 1.0 M. N. & 0. 4 MI. E. OF US-75. |
$1,684,750.13 |
$297,901.21 |
08/21/2008 |
09/19/2008 |
09/30/2008 |
10/17/2008 |
01/05/2009 |
08/17/2009 |
|
Washington |
US-75 |
880321 |
0440304 |
MAF-15(208) |
N |
SHERWOOD CONST. CO., INC. |
5.255 MI. GR.DR.BR. & EROSION CONTROL ON US-75,BEG. 1.00 MI.N. OF THE TULSA C/L & EXT. N. TO APPROX.1.00MI. S.OF RAMONA. |
$1,597,223.22 |
$1,436,437.40 |
09/26/1986 |
10/06/1986 |
10/15/1986 |
10/28/1986 |
11/11/1986 |
11/06/1987 |
|
Washita |
CO.RD. |
080372 |
2323804 |
BRF-175C(070)CO |
N |
K & R BUILDERS, INC. |
0.146 MI. CO.RD.; BRIDGE & APPROACHES; OVER GYP CREEK, 1.75 MI. EAST OF LAKE VALLEY. |
$376,293.80 |
$19,276.48 |
11/20/2008 |
12/08/2008 |
12/23/2008 |
01/06/2009 |
02/23/2009 |
06/22/2009 |
|
Washita |
IS-40 |
090142 |
2412605 |
SSP-175N(085)SS |
N |
JLT CONTRACTING, LLC |
0.00 MI. IS-40;SAFETY IM- PROVEMENT(CABLE BARRIER);BEGINAT MILEMARKER 43.9 & EX- TEND EAST TO MILEMARKER 49.0 |
$1,261,108.17 |
$0.00 |
02/19/2009 |
03/02/2009 |
03/17/2009 |
03/20/2009 |
05/04/2009 |
08/01/2009 |
|
Washita |
SH-44 |
090091 |
2599404 |
STPY-175C(101)(102)3R |
N |
CASWELL CONTRACTING, INC. |
9.81 MI. SH-44;RESURFACE (ASPHALT) BEGIN AT SH-152 AND EXTEND NORTH. |
$1,655,261.50 |
$0.00 |
01/22/2009 |
02/02/2009 |
03/03/2009 |
03/06/2009 |
07/06/2009 |
09/23/2009 |
|
Washita |
US-183 |
060288 |
1712608 |
ACNHY-009N(082)GB |
N |
DOBSON BROTHERS CONSTRUCTION CO. |
2.867 MI. GRADE, DRAIN, SURFACE & BRIDGE US-183 BEGIN S. OF SH-152 & EXTEND NORTH. |
$11,893,891.64 |
$11,796,049.26 |
03/15/2007 |
04/02/2007 |
04/10/2007 |
04/17/2007 |
08/06/2007 |
06/25/2008 |
|
Woods |
CORD |
080203 |
2304804 |
BRO-176D(090)CO |
N |
K & R BUILDERS, INC. |
0.191 MI. CO.RD.;BRIDGE & APPROACHES;OVER BOGGY CR.,4.0 MI. W. & 5.3 MI. NORTH OF US-281/US-64 JCT. |
$617,406.10 |
$533,543.17 |
07/24/2008 |
08/12/2008 |
08/27/2008 |
09/04/2008 |
10/06/2008 |
02/02/2009 |
|
Woods |
US-281 |
070014 |
1745810 |
STPY-176B(028) |
N |
THE CUMMINS CONSTRUCTION CO., INC. |
6.3 MI. WIDENING & RESURFACE US-281 BEGIN 6.3 MI. S. OF HOPETON & EXTEND NORTH. |
$9,327,265.28 |
$7,862,982.66 |
03/15/2007 |
04/02/2007 |
04/19/2007 |
04/26/2007 |
08/06/2007 |
05/31/2008 |
|
Woods |
US-64 |
070412 |
2094904 |
BRFY-176B(069)BF |
N |
VENTURE CORPORATION DBA V. C. O. PAVING |
0.928 MI. BRIDGE & APPROACHES US-64 OVER SAND CRK. 6.3 MI. E. OF HARPER COUNTY LINE. |
$4,767,436.09 |
$4,282,278.68 |
10/18/2007 |
11/05/2007 |
11/14/2007 |
01/09/2008 |
04/07/2008 |
01/11/2009 |
|
Woods |
US-64 |
080202 |
2095004 |
BRFY-176B(072) |
N |
VENTURE CORPORATION DBA V. C. O. PAVING |
0.938 MI. BRIDGE & APPROACHES US-64 OVER WEST MOCCASIN CRK. 8.1 MI. E. OF HARPER COUNTY LINE. |
$4,784,951.43 |
$2,733,089.37 |
04/17/2008 |
04/25/2008 |
05/13/2008 |
05/16/2008 |
09/08/2008 |
06/14/2009 |
|
Woodward |
CORD |
080245 |
2289404 |
BRO-177D(071)CO |
N |
OBC, INC. |
0.368 MI. BRIDGE & APPROACHES COUNTY RD. (EW-26) OVER DOE CRK. APPROX. 3.69 MI. N. & 5.1 MI. EAST OF MOORELAND. |
$673,779.95 |
$605,983.80 |
05/15/2008 |
06/02/2008 |
06/12/2008 |
06/27/2008 |
10/06/2008 |
02/02/2009 |
|
Woodward |
US-270/US |
040381 |
1745708 |
ACNHY-17N(51)(52)GB |
N |
UNITED GENERAL CONTRACTORS, INC. |
4.580 MI. GRADE,DRAIN,BRIDGE. SH-3; US-270; BEGIN APPROX. 0.7 MI. SOUTHEAST OF JCT. SH -5 EXTEND NORTHWEST.NOI PERMIT |
$3,435,835.76 |
$3,003,103.49 |
09/23/2004 |
10/11/2004 |
10/29/2004 |
12/10/2004 |
01/03/2005 |
10/29/2005 |
|
Information source is the ODOT Construction Division Graybook system - Fri 3/27/2009 7:20:07 PM
Project data is dynamic and changes frequently as the construction activity moves forward. Information is subject to change without notice.
Stimulus Indicator Values: S-State Highway System L-County System A-ACOG I-INCOG T-Transit M-Miscellaneous N-Non Stimulus
|