Effective with the June, 2011 Letting:
DAVIS BACON WAGES: There have been significant changes to the USDOL minimum wage schedules ( Davis Bacon wages ) included in federally funded projects. Please check your Bid Proposal for these wage schedules for any bid you are preparing for the June, 2011 Letting or any future ODOT Lettings.
E.B.S. Projects on Letting
|
DBE List
|
Electronic Bid Submission Program (EXPEDITE)
Release: 5.9a . . . Dated: September 2010
|
Preliminary Projects Plan Sheets - Online - For Review
|
Notice to Contractors:
Short Form |
Long Form
|
Pre-Qualified Contractors List
|
Plan Order Forms
|
Plan Holders List
|
R E P O R T S :
|
As Read Bid Reports - will be available the evening of the Scheduled Bid Letting.
|
Low Bid Reports - will be available no later than the Monday following the Scheduled Bid Letting Date.
|
Award Notices - will be available after the Transportation Commission Meeting following the scheduled Bid Letting Date
|
Bid Tabs - will be available after the Transportation Commission Meeting following the scheduled Bid Letting Date
|
NOTICE TO ALL CONTRACTORS
BIDDING DISKS: ODOT IS NO LONGER ISSUING BIDDING DISKS. THE EBS AND DBELIST.BIN FILES CAN BE DOWNLOADED FROM THIS ODOT WEB SITE OR FROM THE OKLAHOMA PAGE ON BID EXPRESS.
EXPEDITE PROGRAM: CONTRACTORS WILL NEED TO UNINSTALL THEIR OLD VERSION OF EXPEDITE BID (5.3a) AND DOWNLOAD, AND INSTALL, THE NEWEST VERSION OF EXPEDITE BID (5.6b) AND USE THIS VERSION WHEN SUBMITTING THEIR BIDS.
SHORT FORM: ODOT NO LONGER MAILS THE NOTICE TO CONTRACTORS SHORT FORM. THIS SAME INFORMATION IS POSTED ON THE ODOT WEB SITE, WITH HARD COPIES ALSO AVAILABLE FOR PICK UP AT ODOT OFFICE ENGINEER DIVISION, ROOM 1-A4.
DAVIS BACON WAGES: Effective with the June, 2011 Letting, There have been significant changes to the USDOL minimum wage schedules ( Davis Bacon Wages ) included in most federally funded projects. Please check your Bid Proposal for these wage schedules for any bid you are preparing for any future ODOT Lettings.
|