Oklahoma Department of Transportation
Progressive Estimate Summary
Created:    01/04/2022
Contract ID: 210131   Estimate Number: 0011     Contract No: M69722
Residency: SALLISAW RESIDENCY (01200)   Estimate Type: Progressive     Account No: 436100

Project Number(s): STP-211C(042)CI
Primary Job Piece No: 28500(04)
Contract Description: BRIDGE AND APPROACHES COUNTY ROAD (NS-4501): OVER DOUBLE SPRINGS CREEK, 8.3 MILES NORTH OF SH-82 NEAR TERESITA. PROJECT LENGTH = 0.153 MILE
Primary County: CHEROKEE              
Name of Road: NS-4501              
Prime Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC              
    P.O. BOX 1323              
    SAPULPA , OK   74067              
Surety Company: MID-CONTINENT CASUALTY COMPANY              

Date Let: 05/20/2021 NTP Effective Date: 10/04/2021 Pay Period: 12/16/2021  TO  12/31/2021
Date Awarded: 06/07/2021 Date Work Began: 07/22/2021 Original Contract Time: 180
Date Contract Executed: 06/22/2021 Date Time Stopped: Current Time Charged: 147.00
Date NTP Issued: 06/26/2021 Completion Date: Current Time Allowed: 180.00
General Liability Expires: 02/11/2022 Workman's Comp Expires: 07/01/2022 Percent Time Used: 81.67 %
Specification Year: 2019     Date Approved: 01/04/2022

Bid Amount: $876,515.00 Total to Date Prev to Date This Estimate
Funds Available (Bid + Positive C/O): $876,515.00 Participating: $658,946.72 $649,703.52 $9,243.20
Percent Complete: 75.21 % Non Participating: $0.00 $0.00 $0.00
Unearned Balance: $217,261.19 Total Earnings: $658,946.72 $649,703.52 $9,243.20
Stockpiled Materials: $307.09 $307.09 $0.00
Gross Earnings: $659,253.81 $650,010.61 $9,243.20
Other Adjustments: $0.00 $0.00 $0.00
Liq Dam/Disincentive: $0.00 $0.00 $0.00
TOTAL: $659,253.81 $650,010.61 $9,243.20

Estimate Adjustment Detail

Contract ID: 210131   Estimate Number: 0011     Primary JP: 28500(04)



CHANGE ORDER HISTORY
Change Order Nbr. Change Order Description Status Approval Date Contract Time Adjustment Total Change Order Amount
No change orders have been created for this contract.


STOCKPILE PAYMENT HISTORY
Project Line Nbr Stockpile Description Adjustment Type Estimate Nbr Adjusted Amount
28500(04) 0240 PC BR ITM FABS (AML) Stockpiled Material Initial Payment 0001 $79,883.37
28500(04) 0240 PC BR ITM FABS (AML) Stockpiled Material Adjustment 0005 $-79,883.37
28500(04) 0250 RSTL EPXY (AML)(IA) Stockpiled Material Initial Payment 0001 $230.00
28500(04) 0250 RSTL EPXY (AML)(IA) Stockpiled Material Adjustment 0007 $-230.00
28500(04) 0250 RSTL EPXY (AML)(IA) Stockpiled Material Initial Payment 0004 $5,000.18
28500(04) 0250 RSTL EPXY (AML)(IA) Stockpiled Material Adjustment 0007 $-4,693.09
28500(04) 0270 RSTL FABS (AML)(IA) Stockpiled Material Initial Payment 0001 $3,596.52
28500(04) 0270 RSTL FABS (AML)(IA) Stockpiled Material Adjustment 0008 $-3,596.52
28500(04) 0340 RSTL FABS (AML)(IA) Stockpiled Material Initial Payment 0004 $17,439.81
28500(04) 0340 RSTL FABS (AML)(IA) Stockpiled Material Adjustment 0006 $-17,439.81
28500(04) 0350 Encasements Stockpiled Material Initial Payment 0001 $196.50
28500(04) 0350 Encasements Stockpiled Material Adjustment 0003 $-196.50
Subtotals For Stockpile Payments $307.09


LIQUIDATED DAMAGES HISTORY
Adjustment Description Estimate Nbr Time Units Rate Adjustment Amount
No liquidated damages have been assessed on this contract.
Subtotals For Liquidated Damages $


CONTRACT ADJUSTMENTS HISTORY
Adjustment Description Estimate Nbr Adjustment Amount
No general contract adjustments have been created on this contract.
Subtotals For Contract Adjustments $0.00


LINE ITEM ADJUSTMENT HISTORY
Project Item Nbr Line Item Description Adjustment Type Estimate Nbr Adj Quantity Unit Price Adjusted Amount
No line item adjustments have been created on this contract.
Subtotals For Line Item Adjustments $0.00


MILESTONE INFORMATION
Milestone Number Milestone Description Start Date End Date Current Time Allowed Rate Milestone Closed
No milestones exist for this contract.


MILESTONE ADJUSTMENTS
Milestone Number Milestone Adjustment Description Estimate Nbr Total
No milestones adjustments exist for this contract.
Subtotals For Milestones $

Line Item Detail

Contract ID: 210131   Estimate Number: 0011     Primary JP: 28500(04)



Line Item Number Item Description Item Number Units Bid Qty Current Quantity Quantity Paid This Est. Quantity Paid To Date Unit Price Amount Paid This Est. Amount Paid To Date
Fed/State Project Number:    STP-211C(042)CI Project:    28500(04) Category:    0100/ROADWAY
0010 CLEARING AND GRUBBING 201(A)1200 LS 1.000 1.000   0.950 $35,000.00 $0.00 $33,250.00
0020 UNCLASSIFIED EXCAVATION 202(A)2200 CY 93.000 93.000 47.000 47.000 $55.00 $2,585.00 $2,585.00
0030 UNCLASSIFIED BORROW 202(D)2500 CY 2,794.000 2,794.000   2,000.000 $12.50 $0.00 $25,000.00
0040 TYPE A-SALVAGED TOPSOIL 205(A)6200 LS 1.000 1.000 0.000 0.500 $14,000.00 $0.00 $7,000.00
0050 TEMPORARY SILT FENCE 221(B)2300 LF 840.000 840.000   250.000 $2.50 $0.00 $625.00
0060 TEMPORARY SILT DIKE 221(E)2600 LF 168.000 168.000   0.000 $9.50 $0.00 $0.00
0070 SOLID SLAB SODDING 230(A)7200 SY 1,234.000 1,234.000   0.000 $6.00 $0.00 $0.00
0080 VEGETATIVE MULCHING 233(A)0200 AC 0.250 0.250   0.000 $20,000.00 $0.00 $0.00
0090 STABILIZED SUBGRADE 307(K)4200 SY 1,787.000 1,787.000   1,368.920 $9.00 $0.00 $12,320.28
0100 TRAFFIC BOUND SURFACE COURSE TYPE E 402(E)2600 TON 100.000 100.000   0.000 $38.00 $0.00 $0.00
0110 TACK COAT 407(B)7300 GAL 128.000 128.000   0.000 $4.00 $0.00 $0.00
0120 PRIME COAT 408 8100 GAL 625.000 625.000 400.000 400.000 $6.50 $2,600.00 $2,600.00
0130 SUPERPAVE, TYPE S3(PG 64-22 OK) 411(B)1330 TON 388.000 388.000 0.000 0.000 $113.00 $0.00 $0.00
0140 SUPERPAVE, TYPE S4(PG 64-22 OK) 411(C)1430 TON 229.000 229.000   0.000 $153.00 $0.00 $0.00
0150 CLASS C CONCRETE 509(D)0500 CY 10.000 10.000   0.000 $353.00 $0.00 $0.00
0160 TYPE I PLAIN RIPRAP 601(A)1100 TON 275.000 275.000   0.000 $33.00 $0.00 $0.00
0170 REMOVAL OF STRUCTURES & OBSTRUCTIONS 619(A)6200 LS 1.000 1.000   0.000 $8,000.00 $0.00 $0.00
0180 REMOVAL OF ASPHALT PAVEMENT 619(B)6364 SY 1,833.000 1,833.000 375.000 1,233.330 $6.00 $2,250.00 $7,399.98
0190 SAWING PAVEMENT 619(C)6600 LF 44.000 44.000 11.000 31.000 $15.00 $165.00 $465.00
0200 GUARDRAIL ANCHOR UNIT (TYPE A) 623(F)1704 EA 4.000 4.000   0.000 $1,950.00 $0.00 $0.00
0210 GUARDRAIL ANCHOR UNIT (TYPE D-BF) 623(F)1724 EA 4.000 4.000   0.000 $1,375.00 $0.00 $0.00
Subtotals For Category     0100/ROADWAY    $7,600.00 $91,245.26
Fed/State Project Number:    STP-211C(042)CI Project:    28500(04) Category:    0200/BRIDGE 'A' - NBI NO. 32611
0220 SUBSTRUCTURE EXCAVATION COMMON 501(B)1300 CY 100.000 100.000   100.000 $12.00 $0.00 $1,200.00
0230 CLSM BACKFILL 501(G)1800 CY 46.000 46.000   46.000 $160.00 $0.00 $7,360.00
0235 ENGINEERED FALSEWORK 502(A)3200 LS 1.000 1.000   1.000 $4,500.00 $0.00 $4,500.00
0240 PRESTRESSED CONCRETE BEAMS (TYPE II) 503(A)4220 LF 447.000 447.000   447.000 $215.00 $0.00 $96,105.00
0250 APPROACH SLAB 504(A)5200 SY 115.000 115.000   115.000 $185.00 $0.00 $21,275.00
0260 SAW-CUT GROOVING 504(B)5300 SY 447.000 447.000   0.000 $7.00 $0.00 $0.00
0270 CONCRETE RAIL (TR3) 504(D)5410 LF 352.600 352.600   352.600 $82.00 $0.00 $28,913.20
0280 STRUCTURAL STEEL 506(A)7200 LB 660.000 660.000   660.000 $2.00 $0.00 $1,320.00
0290 WEATHERING STEEL FIXED BEARING ASSEMBLY 507(A)8210 EA 6.000 6.000   6.000 $600.00 $0.00 $3,600.00
0300 WEATHERING STL EXP. BEARING ASSEMBLY 507(B)8310 EA 12.000 12.000   12.000 $875.00 $0.00 $10,500.00
0310 ELASTOMERIC BEARING PADS 507(C)8400 EA 12.000 12.000   12.000 $175.00 $0.00 $2,100.00
0320 CLASS AA CONCRETE 509(A)0210 CY 131.200 131.200   131.200 $820.00 $0.00 $107,584.00
0330 CLASS A CONCRETE 509(B)0320 CY 66.800 66.800   66.800 $820.00 $0.00 $54,776.00
0340 REINFORCING STEEL 511(A)2210 LB 42,890.000 42,890.000   42,890.000 $1.10 $0.00 $47,179.00
0350 PILES, FURNISHED (HP 10X42) 514(A)5210 LF 290.000 290.000   290.000 $55.00 $0.00 $15,950.00
0360 PILES, DRIVEN (HP 10X42) 514(B)5310 LF 290.000 290.000   225.690 $9.00 $0.00 $2,031.21
0370 PILE SPLICE, H-PILE (NON-BIDDABLE) 514(L)6300 EA 1.000 1.000   0.000 $400.00 $0.00 $0.00
0380 DRILLED SHAFTS 42" DIAMETER 516(A)8225 LF 124.000 124.000   124.000 $630.00 $0.00 $78,120.00
0390 TYPE I-A PLAIN RIPRAP 601(B)1230 TON 270.000 270.000   98.160 $34.00 $0.00 $3,337.44
0400 TYPE I-A FILTER BLANKET 601(C)1310 TON 85.000 85.000   43.810 $26.00 $0.00 $1,139.06
0410 6" PERFORATED PIPE UNDERDRAIN ROUND 613(H)6205 LF 52.000 52.000   0.000 $55.00 $0.00 $0.00
0420 6" NON-PERF.PIPE UNDERDRAIN RND. 613(I)6310 LF 40.000 40.000   0.000 $12.00 $0.00 $0.00
0430 REMOVAL OF EXISTING BRIDGE STRUCTURE 619(D)6700 LS 1.000 1.000   0.000 $25,000.00 $0.00 $0.00
Subtotals For Category     0200/BRIDGE 'A' - NBI NO. 32611    $0.00 $486,989.91
Fed/State Project Number:    STP-211C(042)CI Project:    28500(04) Category:    0300/TRAFFIC
0440 (PL)REMOVAL OF EXISTING SIGNS 805(A)3252 EA 3.000 3.000   3.000 $75.00 $0.00 $225.00
0450 SHEET ALUMINUM SIGNS 850(A)1200 SF 22.500 22.500   0.000 $17.00 $0.00 $0.00
0460 2" SQUARE TUBE POST 851(C)2415 LF 30.000 30.000   0.000 $11.00 $0.00 $0.00
0470 TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) 856(A)8200 LF 3,240.000 3,240.000   0.000 $2.00 $0.00 $0.00
0480 CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) 857(A)9200 LF 648.000 648.000   0.000 $0.60 $0.00 $0.00
0490 CONSTRUCTION SIGNS 0 TO 6.25 SF 880(B)6300 SD 1,440.000 1,440.000 250.000 2,055.000 $0.60 $150.00 $1,233.00
0500 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF 880(B)6320 SD 2,160.000 2,160.000 337.000 2,183.000 $0.60 $202.20 $1,309.80
0510 CONSTRUCTION BARRICADES(TYPE III) 880(C)6410 SD 360.000 360.000   0.000 $5.00 $0.00 $0.00
0520 WING BARRICADES 880(C)6420 SD 2,520.000 2,520.000   0.000 $0.05 $0.00 $0.00
0530 WARNING LIGHTS(TYPE A) 880(E)6600 SD 720.000 720.000 157.000 1,135.000 $3.00 $471.00 $3,405.00
0540 DRUMS 880(F)6700 SD 3,960.000 3,960.000 880.000 5,765.000 $0.75 $660.00 $4,323.75
0550 FLAGGER 880(I)7000 SD 360.000 360.000 16.000 159.000 $10.00 $160.00 $1,590.00
Subtotals For Category     0300/TRAFFIC    $1,643.20 $12,086.55
Fed/State Project Number:    STP-211C(042)CI Project:    28500(04) Category:    0600/STAKING
0560 CONSTRUCTION STAKING LEVEL II 642(B)3300 LS 1.000 1.000   0.750 $7,500.00 $0.00 $5,625.00
Subtotals For Category     0600/STAKING    $0.00 $5,625.00
Fed/State Project Number:    STP-211C(042)CI Project:    28500(04) Category:    0640/CONSTRUCTION
0570 SWPPP DOCUMENTATION AND MANAGEMENT 220 1100 LS 1.000 1.000   0.000 $5,000.00 $0.00 $0.00
0580 MOBILIZATION 641 2100 LS 1.000 1.000   1.000 $63,000.00 $0.00 $63,000.00
Subtotals For Category     0640/CONSTRUCTION    $0.00 $63,000.00
Subtotals For Project STP-211C(042)CI /28500(04) $9,243.20 $658,946.72