Fed/State Project Number: NHPP-272N(283)IG |
Project: 33959(04) |
Category: 0100/ROADWAY |
0010 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
4,674.000 |
4,674.000 |
|
5,608.240 |
$25.00 |
$0.00 |
$140,206.00 |
0020 |
TYPE A-SALVAGED TOPSOIL |
205(A) 4230 |
CY |
200.000 |
200.000 |
|
0.000 |
$25.00 |
$0.00 |
$0.00 |
0030 |
TEMPORARY SILT FENCE |
221(C) 2801 |
LF |
1,500.000 |
1,500.000 |
|
0.000 |
$2.10 |
$0.00 |
$0.00 |
0040 |
TEMPORARY SEDIMENT FILTER |
221(D) 2803 |
EA |
46.000 |
46.000 |
|
8.000 |
$100.00 |
$0.00 |
$800.00 |
0050 |
TEMPORARY SILT DIKE |
221(F) 0100 |
LF |
600.000 |
600.000 |
|
0.000 |
$6.75 |
$0.00 |
$0.00 |
0060 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
3,162.000 |
3,162.000 |
550.730 |
1,752.380 |
$4.50 |
$2,478.29 |
$7,885.72 |
0070 |
AGGREGATE BASE TYPE A |
303(A) 2100 |
CY |
4,674.000 |
4,674.000 |
|
5,608.240 |
$52.00 |
$0.00 |
$291,628.48 |
0080 |
SUBGRADE, METHOD B |
310(B) 0149 |
SY |
14,429.000 |
14,429.000 |
|
16,735.540 |
$3.40 |
$0.00 |
$56,900.85 |
0090 |
SEPARATOR FABRIC |
325 5271 |
SY |
18,037.000 |
18,037.000 |
|
22,822.300 |
$1.35 |
$0.00 |
$30,810.11 |
0100 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) |
411(H) 6210 |
TON |
64.000 |
64.000 |
|
34.100 |
$195.00 |
$0.00 |
$6,649.50 |
0110 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) |
411(I) 6310 |
TON |
18.000 |
18.000 |
|
17.720 |
$180.00 |
$0.00 |
$3,189.60 |
0120 |
FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) |
414(E) 0225 |
SY |
16,391.000 |
16,391.000 |
0.000 |
22,531.070 |
$22.00 |
$0.00 |
$495,683.54 |
0130 |
P.C. CONCRETE FOR PAVEMENT |
414(G) 5275 |
CY |
4,099.000 |
4,099.000 |
0.000 |
5,669.940 |
$185.00 |
$0.00 |
$1,048,938.90 |
0140 |
CONCRETE JOINT SEALING |
415 6300 |
LF |
34,438.000 |
34,438.000 |
25,000.000 |
30,784.000 |
$2.25 |
$56,250.00 |
$69,264.00 |
0150 |
DIAMOND GRINDING CONCRETE PAVEMENT |
425 5195 |
SY |
53,640.000 |
53,640.000 |
|
0.000 |
$6.00 |
$0.00 |
$0.00 |
0160 |
CLSM BACKFILL |
501(G) 6315 |
CY |
482.000 |
482.000 |
|
17.830 |
$80.00 |
$0.00 |
$1,426.40 |
0170 |
CONCRETE CURB (6" MNTBLE-INTEGRAL) |
609(A) 0288 |
LF |
1,885.000 |
1,885.000 |
|
2,455.920 |
$15.00 |
$0.00 |
$36,838.80 |
0180 |
CONCRETE CURB (8" BARRIER-INTEGRAL) |
609(A) 0380 |
LF |
5,647.000 |
5,647.000 |
|
5,436.060 |
$15.00 |
$0.00 |
$81,540.90 |
0190 |
COMBINED CURB & GUTTER (8" BARRIER) |
609(B) 0384 |
LF |
56.000 |
56.000 |
|
102.000 |
$26.00 |
$0.00 |
$2,652.00 |
0200 |
4" CONCRETE SIDEWALK |
610(A) 0602 |
SY |
104.000 |
104.000 |
|
294.950 |
$45.00 |
$0.00 |
$13,272.75 |
0210 |
6" CONCRETE DRIVEWAY (H.E.S.) |
610(B) 0399 |
SY |
1,325.000 |
1,325.000 |
|
337.660 |
$58.00 |
$0.00 |
$19,584.28 |
0220 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LS |
1.000 |
1.000 |
|
1.000 |
$64,020.11 |
$0.00 |
$64,020.11 |
0230 |
REMOVAL OF CURB AND GUTTER |
619(B) 4726 |
LF |
7,588.000 |
7,588.000 |
|
7,904.760 |
$2.25 |
$0.00 |
$17,785.74 |
0240 |
REMOVAL OF CONCRETE PAVEMENT |
619(B) 4727 |
SY |
16,391.000 |
16,391.000 |
0.000 |
22,288.930 |
$16.00 |
$0.00 |
$356,622.88 |
0250 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
162.000 |
162.000 |
|
162.000 |
$9.00 |
$0.00 |
$1,458.00 |
0260 |
REMOVAL OF CONCRETE DRIVEWAY |
619(B) 4766 |
SY |
1,325.000 |
1,325.000 |
|
337.660 |
$12.00 |
$0.00 |
$4,051.92 |
0270 |
REMOVAL OF SIDEWALK |
619(B) 4792 |
SY |
26.000 |
26.000 |
232.610 |
281.950 |
$11.00 |
$2,558.71 |
$3,101.45 |
8000 |
REPLACEMENT OF CAST IRON HOOD |
611(M) 4488 |
EA |
0.000 |
3.000 |
|
3.000 |
$1,650.22 |
$0.00 |
$4,950.66 |
8001 |
TACTILE WARNING DEVICE-NEW |
610(I) 4610 |
SF |
0.000 |
112.000 |
|
192.000 |
$21.01 |
$0.00 |
$4,033.92 |
8002 |
CONSTRUCTION MISCELLANEOUS |
104 0600 |
EA |
0.000 |
14.000 |
|
24.000 |
$3,567.02 |
$0.00 |
$85,608.48 |
8003 |
REPLACEMENT OF CAST IRON HOOD |
611(M) 4488 |
EA |
0.000 |
2.000 |
|
0.000 |
$1,596.61 |
$0.00 |
$0.00 |
8019 |
6" PERFORATED PIPE UNDERDRAIN ROUND |
613(H) 6204 |
LF |
0.000 |
400.000 |
0.000 |
321.000 |
$17.71 |
$0.00 |
$5,684.91 |
Subtotals For Category 0100/ROADWAY |
$61,287.00 |
$2,854,589.90 |
|
Fed/State Project Number: NHPP-272N(283)IG |
Project: 33959(04) |
Category: 0301/TRAFFIC CONTROL |
0380 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
857(A) 8839 |
LF |
20,000.000 |
20,000.000 |
|
4,579.000 |
$0.16 |
$0.00 |
$732.64 |
0390 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
857(F) 8006 |
LF |
15,388.000 |
15,388.000 |
11,180.000 |
14,475.000 |
$0.28 |
$3,130.40 |
$4,053.00 |
0400 |
PAVEMENT MARKING REMOVAL(ARROWS) |
857(F) 8007 |
EA |
26.000 |
26.000 |
|
11.000 |
$28.00 |
$0.00 |
$308.00 |
0410 |
PAVEMENT MARKING REMOVAL(WORDS) |
857(F) 8008 |
EA |
5.000 |
5.000 |
|
1.000 |
$28.00 |
$0.00 |
$28.00 |
0420 |
ARROW DISPLAY(TYPE A) |
880(A) 8800 |
SD |
1,800.000 |
1,800.000 |
|
635.000 |
$1.10 |
$0.00 |
$698.50 |
0430 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
11,250.000 |
11,250.000 |
|
6,841.000 |
$1.10 |
$0.00 |
$7,525.10 |
0440 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
9,000.000 |
9,000.000 |
|
14,602.000 |
$2.10 |
$0.00 |
$30,664.20 |
0450 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
6,000.000 |
6,000.000 |
|
5,615.000 |
$2.10 |
$0.00 |
$11,791.50 |
0460 |
CONSTRUCTION BARRICADES(TYPE III) |
880(C) 8842 |
SD |
18,000.000 |
18,000.000 |
|
11,958.000 |
$0.26 |
$0.00 |
$3,109.08 |
0470 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
42,000.000 |
42,000.000 |
|
25,689.000 |
$0.11 |
$0.00 |
$2,825.79 |
0480 |
DRUMS |
880(F) 8878 |
SD |
21,000.000 |
21,000.000 |
|
21,140.000 |
$0.26 |
$0.00 |
$5,496.40 |
0490 |
TUBE CHANNELIZERS |
880(G) 8884 |
SD |
108,000.000 |
108,000.000 |
|
77,379.000 |
$0.11 |
$0.00 |
$8,511.69 |
0500 |
FLAGGER |
880(I) 8902 |
SD |
50.000 |
50.000 |
|
63.000 |
$200.00 |
$0.00 |
$12,600.00 |
0510 |
(PL)REMOTE CONTROLLED CHANGEABLE MESSAGE SIGN |
882(B) 8315 |
SD |
1,800.000 |
1,800.000 |
|
732.000 |
$7.50 |
$0.00 |
$5,490.00 |
Subtotals For Category 0301/TRAFFIC CONTROL |
$3,130.40 |
$93,833.90 |
|
Fed/State Project Number: NHPP-272N(283)IG |
Project: 33959(04) |
Category: 0302/TRAFFIC SIGNALS |
0520 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED |
802(B) 8342 |
LF |
210.000 |
210.000 |
|
10.000 |
$20.00 |
$0.00 |
$200.00 |
0530 |
3" PVC SCH.40 PLASTIC CONDUIT TRENCHED |
802(B) 8346 |
LF |
10.000 |
10.000 |
|
60.000 |
$32.00 |
$0.00 |
$1,920.00 |
0540 |
2" HIGH DENSITY PE PIPE - BORED |
802(C) 8552 |
LF |
10.000 |
10.000 |
|
0.000 |
$55.00 |
$0.00 |
$0.00 |
0550 |
3" HIGH DENSITY PE PIPE - BORED |
802(C) 8553 |
LF |
10.000 |
10.000 |
|
0.000 |
$105.00 |
$0.00 |
$0.00 |
0560 |
PULL BOX(SIZE I) |
803(A) 8065 |
EA |
10.000 |
10.000 |
|
3.000 |
$1,565.00 |
$0.00 |
$4,695.00 |
0570 |
PULL BOX(SIZE II) |
803(A) 8066 |
EA |
2.000 |
2.000 |
|
0.000 |
$2,500.00 |
$0.00 |
$0.00 |
0580 |
STRUCTURAL CONCRETE |
804(A) 2915 |
CY |
4.900 |
4.900 |
|
0.000 |
$2,150.00 |
$0.00 |
$0.00 |
0590 |
REINFORCING STEEL |
804(B) 2916 |
LB |
378.000 |
378.000 |
|
0.000 |
$4.75 |
$0.00 |
$0.00 |
0600 |
(PL)REMOVAL OF TRAFFIC SIGNAL EQUIPMENT |
805(A) 8726 |
LS |
1.000 |
1.000 |
|
0.000 |
$10,000.00 |
$0.00 |
$0.00 |
0610 |
8' MTG.HT.TS PED.POLE(G.STL.) |
806(B) 8892 |
EA |
1.000 |
1.000 |
|
0.000 |
$1,050.00 |
$0.00 |
$0.00 |
0620 |
10' MTG.HT.TS PED.POLE(G.STL.) |
806(B) 8894 |
EA |
14.000 |
14.000 |
|
8.000 |
$1,250.00 |
$0.00 |
$10,000.00 |
0630 |
2/C NO.10 ELECTRICAL CONDUCTOR |
811 8060 |
LF |
700.000 |
700.000 |
|
0.000 |
$2.25 |
$0.00 |
$0.00 |
0640 |
PROVIDE SERVICE/MAINTENANCE FOR CCTV |
815(B) 8630 |
HOUR |
1.000 |
1.000 |
0.000 |
28.250 |
$150.00 |
$0.00 |
$4,237.50 |
0650 |
VEHICLE LOOP DETECTOR |
828(A) 8142 |
EA |
17.000 |
17.000 |
|
0.000 |
$1,425.00 |
$0.00 |
$0.00 |
0660 |
LOOP DETECTOR WIRE |
828(B) 8136 |
LF |
10.000 |
10.000 |
|
0.000 |
$18.00 |
$0.00 |
$0.00 |
0670 |
PEDESTRIAN PUSH BUTTON |
830 8000 |
EA |
23.000 |
23.000 |
|
8.000 |
$1,700.00 |
$0.00 |
$13,600.00 |
0680 |
TRAFFIC SIGNAL HEADS |
831 8100 |
EA |
1.000 |
1.000 |
|
0.000 |
$11,000.00 |
$0.00 |
$0.00 |
0690 |
1WAY 2SEC. ADJ. PED. SIG. HD. S-20 |
831 8295 |
EA |
22.000 |
22.000 |
|
8.000 |
$775.00 |
$0.00 |
$6,200.00 |
0700 |
5/C TRAFFIC SIGNAL ELECTRICAL CABLE |
834(A) 8207 |
LF |
795.000 |
795.000 |
|
0.000 |
$2.85 |
$0.00 |
$0.00 |
0710 |
7/C TRAFFIC SIGNAL ELECTRICAL CABLE |
834(A) 8208 |
LF |
800.000 |
800.000 |
|
0.000 |
$3.40 |
$0.00 |
$0.00 |
0720 |
9/C TRAFFIC SIGNAL ELECTRICAL CABLE |
834(A) 8209 |
LF |
10.000 |
10.000 |
|
0.000 |
$6.80 |
$0.00 |
$0.00 |
0730 |
12/C TRAFFIC SIGNAL ELECTRICAL CABLE |
834(A) 8210 |
LF |
50.000 |
50.000 |
|
0.000 |
$3.40 |
$0.00 |
$0.00 |
0740 |
15/C TRAFFIC SIGNAL ELECTRICAL CABLE |
834(A) 8211 |
LF |
820.000 |
820.000 |
|
0.000 |
$4.00 |
$0.00 |
$0.00 |
0750 |
18/C TRAFFIC SIGNAL ELECTRICAL CABLE |
834(A) 8212 |
LF |
820.000 |
820.000 |
|
0.000 |
$4.25 |
$0.00 |
$0.00 |
0760 |
21/C TRAFFIC SIGNAL ELECTRICAL CABLE |
834(A) 8213 |
LF |
700.000 |
700.000 |
|
0.000 |
$7.25 |
$0.00 |
$0.00 |
0770 |
2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE |
834(B) 8220 |
LF |
385.000 |
385.000 |
|
0.000 |
$2.75 |
$0.00 |
$0.00 |
0780 |
E.P.S. OPTICAL DETECTOR CABLE |
840(C) 8594 |
LF |
10.000 |
10.000 |
|
0.000 |
$3.25 |
$0.00 |
$0.00 |
Subtotals For Category 0302/TRAFFIC SIGNALS |
$0.00 |
$40,852.50 |
|
Fed/State Project Number: NHPP-272N(283)IG |
Project: 33959(04) |
Category: 0900/FEDERAL NON PARTICIPATING |
8004 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
0.000 |
705.000 |
|
7.870 |
$25.00 |
$0.00 |
$196.75 |
8005 |
AGGREGATE BASE TYPE A |
303(A) 2100 |
CY |
0.000 |
418.000 |
|
7.870 |
$52.00 |
$0.00 |
$409.24 |
8006 |
SUBGRADE, METHOD B |
310(B) 0149 |
SY |
0.000 |
1,226.000 |
|
23.610 |
$3.40 |
$0.00 |
$80.27 |
8007 |
SEPARATOR FABRIC |
325 5271 |
SY |
0.000 |
1,306.000 |
|
62.000 |
$1.35 |
$0.00 |
$83.70 |
8008 |
FULL DEPTH P.C.C. PATCH(PLACEMENT ONLY) |
414(E) 0225 |
SY |
0.000 |
1,132.000 |
|
571.990 |
$22.00 |
$0.00 |
$12,583.78 |
8009 |
P.C. CONCRETE FOR PAVEMENT |
414(G) 5275 |
CY |
0.000 |
284.000 |
|
143.000 |
$185.00 |
$0.00 |
$26,455.00 |
8010 |
CONCRETE JOINT SEALING |
415 6300 |
LF |
0.000 |
5,303.000 |
1,300.000 |
1,300.000 |
$2.25 |
$2,925.00 |
$2,925.00 |
8011 |
REMOVAL OF CONCRETE PAVEMENT |
619(B) 4727 |
SY |
0.000 |
1,132.000 |
|
635.070 |
$16.00 |
$0.00 |
$10,161.12 |
8012 |
CONC.CURB(6" MNTBLE-INTEGRAL) |
609(A) 0288 |
LF |
0.000 |
267.000 |
|
252.500 |
$15.00 |
$0.00 |
$3,787.50 |
8013 |
CONC.CURB(8" BARRIER-INTEGRAL) |
609(A) 0380 |
LF |
0.000 |
114.000 |
0.000 |
86.750 |
$15.00 |
$0.00 |
$1,301.25 |
8014 |
REMOVAL OF CURB AND GUTTER |
619(B) 4726 |
LF |
0.000 |
145.000 |
|
104.590 |
$2.25 |
$0.00 |
$235.33 |
8015 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) |
856(A) 8530 |
LF |
0.000 |
532.000 |
|
3,197.000 |
$0.80 |
$0.00 |
$2,557.60 |
8016 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) |
856(A) 8555 |
LF |
0.000 |
353.000 |
|
180.500 |
$11.00 |
$0.00 |
$1,985.50 |
8017 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) |
856(B) 8860 |
EA |
0.000 |
16.000 |
|
6.000 |
$138.00 |
$0.00 |
$828.00 |
8018 |
DECORATIVE MEDIAN CONCRETE |
610(C) 5824 |
SY |
0.000 |
40.000 |
|
35.750 |
$187.62 |
$0.00 |
$6,707.42 |
Subtotals For Category 0900/FEDERAL NON PARTICIPATING |
$2,925.00 |
$70,297.46 |
|
Subtotals For Project NHPP-272N(283)IG /33959(04) |
$89,000.12 |
$3,191,127.88 |