Fed/State Project Number: ACNHPPI-2400-(004)SS |
Project: 09032(20) |
Category: 0100/ROADWAY |
0001 |
CONSTRUCTION MISCELLANEOUS |
104 0300 |
LF |
100.000 |
100.000 |
|
0.000 |
$8.00 |
$0.00 |
$0.00 |
0002 |
CLEARING AND GRUBBING |
201(A) 0102 |
LSUM |
1.000 |
1.000 |
0.500 |
1.000 |
$8,829.47 |
$4,414.74 |
$8,829.48 |
0003 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
14,990.000 |
14,990.000 |
8,878.800 |
8,878.800 |
$15.48 |
$137,443.82 |
$137,443.82 |
0004 |
UNCLASSIFIED BORROW (TOPSOIL) |
202(D) 4781 |
CY |
838.000 |
838.000 |
|
0.000 |
$32.56 |
$0.00 |
$0.00 |
0005 |
TYPE A-SALVAGED TOPSOIL |
205(A) 4229 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$2,462.93 |
$0.00 |
$0.00 |
0006 |
TEMPORARY SILT FENCE |
221(C) 2801 |
LF |
4,057.000 |
4,057.000 |
|
836.000 |
$1.26 |
$0.00 |
$1,053.36 |
0007 |
TEMPORARY SEDIMENT FILTER |
221(D) 2803 |
EA |
2.000 |
2.000 |
|
0.000 |
$170.00 |
$0.00 |
$0.00 |
0008 |
TEMPORARY SILT DIKE |
221(F) 0100 |
LF |
42.000 |
42.000 |
|
0.000 |
$6.75 |
$0.00 |
$0.00 |
0009 |
(PL)TEMPORARY INLET SEDIMENT FILTER |
221(H) 0450 |
EA |
62.000 |
62.000 |
|
7.000 |
$185.00 |
$0.00 |
$1,295.00 |
0010 |
TEMPORARY FIBER LOG |
221(K) 0600 |
LF |
237.000 |
237.000 |
|
775.000 |
$1.75 |
$0.00 |
$1,356.25 |
0011 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
6,468.000 |
6,468.000 |
|
0.000 |
$1.34 |
$0.00 |
$0.00 |
0012 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
2.000 |
2.000 |
|
0.000 |
$400.00 |
$0.00 |
$0.00 |
0013 |
MOWING |
241 2832 |
AC |
3.000 |
3.000 |
|
0.000 |
$100.00 |
$0.00 |
$0.00 |
0014 |
AGGREGATE BASE TYPE A |
303(A) 2100 |
CY |
7,408.000 |
7,408.000 |
|
0.000 |
$74.25 |
$0.00 |
$0.00 |
0015 |
STABILIZED SUBGRADE |
307(K) 4300 |
SY |
34,920.000 |
34,920.000 |
|
0.000 |
$8.02 |
$0.00 |
$0.00 |
0016 |
CEMENT TREATED BASE |
317 4270 |
SY |
1,448.000 |
1,448.000 |
|
0.000 |
$19.60 |
$0.00 |
$0.00 |
0017 |
SEPARATOR FABRIC |
325 5271 |
SY |
35,743.000 |
35,743.000 |
|
0.000 |
$1.54 |
$0.00 |
$0.00 |
0018 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
402(E) 0225 |
TON |
79.000 |
79.000 |
|
0.000 |
$53.15 |
$0.00 |
$0.00 |
0019 |
TACK COAT |
407(B) 0250 |
GAL |
10,026.000 |
10,026.000 |
|
0.000 |
$2.20 |
$0.00 |
$0.00 |
0020 |
PRIME COAT |
408 5774 |
GAL |
20,440.000 |
20,440.000 |
|
0.000 |
$3.30 |
$0.00 |
$0.00 |
0021 |
SUPERPAVE, TYPE S3(PG 76-28 OK) |
411(B) 5935 |
TON |
5,651.000 |
5,651.000 |
|
0.000 |
$69.30 |
$0.00 |
$0.00 |
0022 |
SUPERPAVE, TYPE S3(PG 64-22 OK) |
411(B) 5945 |
TON |
16,801.000 |
16,801.000 |
|
0.000 |
$61.49 |
$0.00 |
$0.00 |
0023 |
SUPERPAVE, TYPE S4(PG 76-28 OK) |
411(C) 5950 |
TON |
4,401.000 |
4,401.000 |
|
0.000 |
$77.00 |
$0.00 |
$0.00 |
0024 |
COLD MILLING PAVEMENT |
412 5267 |
SY |
4,196.000 |
4,196.000 |
|
0.000 |
$2.20 |
$0.00 |
$0.00 |
0025 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) |
414(B) 5725 |
SY |
1,266.000 |
1,266.000 |
|
0.000 |
$26.76 |
$0.00 |
$0.00 |
0026 |
P.C. CONCRETE FOR PAVEMENT |
414(G) 5275 |
CY |
317.000 |
317.000 |
|
0.000 |
$162.35 |
$0.00 |
$0.00 |
0027 |
STRUCTURAL EXCAVATION UNCLASSIFIED |
501(A) 0313 |
CY |
11.000 |
11.000 |
|
0.000 |
$25.63 |
$0.00 |
$0.00 |
0028 |
GRANULAR BACKFILL |
501(F) 6352 |
CY |
50.000 |
50.000 |
|
0.000 |
$69.61 |
$0.00 |
$0.00 |
0029 |
CLSM BACKFILL |
501(G) 6315 |
CY |
10.000 |
10.000 |
|
0.000 |
$192.64 |
$0.00 |
$0.00 |
0030 |
TEMPORARY EARTH RETAINAGE |
502 1000 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$897,959.50 |
$0.00 |
$0.00 |
0031 |
CONCRETE RAIL (TR4) |
504(D) 6245 |
LF |
3,249.000 |
3,249.000 |
|
0.000 |
$156.58 |
$0.00 |
$0.00 |
0032 |
42" F-SHAPED PARAPET |
504(E) 6190 |
LF |
3,698.000 |
3,698.000 |
|
0.000 |
$98.57 |
$0.00 |
$0.00 |
0033 |
CLASS AA CONCRETE |
509(A) 0319 |
CY |
5.000 |
5.000 |
|
0.000 |
$1,130.29 |
$0.00 |
$0.00 |
0034 |
CLASS A CONCRETE |
509(B) 0321 |
CY |
239.000 |
239.000 |
|
0.000 |
$769.44 |
$0.00 |
$0.00 |
0035 |
CLASS A CONCRETE(LONG. BAR. DES. 1-A) |
509(B) 0325 |
CY |
85.000 |
85.000 |
|
0.000 |
$516.07 |
$0.00 |
$0.00 |
0036 |
CLASS A CONCRETE, SMALL STRUCTURES |
509(C) 0322 |
CY |
9.000 |
9.000 |
|
0.000 |
$1,107.44 |
$0.00 |
$0.00 |
0037 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
242.000 |
242.000 |
|
0.000 |
$986.41 |
$0.00 |
$0.00 |
0038 |
RETAINING WALL |
510(A) 6334 |
SY |
406.000 |
406.000 |
|
0.000 |
$736.47 |
$0.00 |
$0.00 |
0039 |
SLOPE WALL (5") |
510(C) 6135 |
SY |
2,715.000 |
2,715.000 |
|
0.000 |
$127.69 |
$0.00 |
$0.00 |
0040 |
MSE RETAINING WALL |
510(D) 6341 |
SY |
3,405.000 |
3,405.000 |
|
0.000 |
$645.35 |
$0.00 |
$0.00 |
0041 |
REINFORCING STEEL |
511(A) 0332 |
LB |
21,238.000 |
21,238.000 |
|
0.000 |
$1.17 |
$0.00 |
$0.00 |
0042 |
EPOXY COATED REINFORCING STEEL |
511(B) 4269 |
LB |
10,350.000 |
10,350.000 |
|
0.000 |
$1.58 |
$0.00 |
$0.00 |
0043 |
(SP)NEST PREVENTION |
525(C) 1000 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$6,756.03 |
$0.00 |
$0.00 |
0044 |
CONCRETE CURB (4" MNTBLE-INTEGRAL) |
609(A) 0287 |
LF |
494.000 |
494.000 |
|
0.000 |
$11.32 |
$0.00 |
$0.00 |
0045 |
CONCRETE CURB (6" BARRIER-INTEGRAL) |
609(A) 0300 |
LF |
648.000 |
648.000 |
|
0.000 |
$12.48 |
$0.00 |
$0.00 |
0046 |
1'-8" COMB. CURB & GUTTER (4" MNTBLE) |
609(B) 1500 |
LF |
1,088.000 |
1,088.000 |
|
0.000 |
$29.61 |
$0.00 |
$0.00 |
0047 |
2'-8" COMB. CURB & GUTTER (4" MNTBLE) |
609(B) 1523 |
LF |
444.000 |
444.000 |
|
0.000 |
$35.29 |
$0.00 |
$0.00 |
0048 |
4" CONCRETE DIVIDING STRIP |
610(C) 0608 |
SY |
1,281.000 |
1,281.000 |
|
0.000 |
$45.46 |
$0.00 |
$0.00 |
0049 |
6" CONCRETE DIVIDING STRIP |
610(C) 0609 |
SY |
693.000 |
693.000 |
|
0.000 |
$62.23 |
$0.00 |
$0.00 |
0050 |
MANHOLE (4' DIAMETER) |
611(A) 2657 |
EA |
12.000 |
12.000 |
2.000 |
3.000 |
$3,140.60 |
$6,281.20 |
$9,421.80 |
0051 |
SPECIAL INLET DRAIN |
611(G) 4012 |
EA |
1.000 |
1.000 |
|
0.000 |
$145,947.70 |
$0.00 |
$0.00 |
0052 |
INLET CI DES. 2 (STD) |
611(G) 5112 |
EA |
2.000 |
2.000 |
|
0.000 |
$5,664.84 |
$0.00 |
$0.00 |
0053 |
INLET - LONGITUDINAL BARRIER - TYPE I, DES. 2 |
611(G) 5699 |
EA |
20.000 |
20.000 |
3.000 |
4.000 |
$3,616.07 |
$10,848.21 |
$14,464.28 |
0054 |
INLET - LONGITUDINAL BARRIER - TYPE II, DES. 2 |
611(G) 5700 |
EA |
1.000 |
1.000 |
|
0.000 |
$7,599.82 |
$0.00 |
$0.00 |
0055 |
INLET (SMD-TYPE 2) |
611(G) 6002 |
EA |
7.000 |
7.000 |
2.000 |
4.000 |
$2,963.04 |
$5,926.08 |
$11,852.16 |
0056 |
JUNCTION BOXES |
611(L) 0487 |
CF |
315.000 |
315.000 |
|
0.000 |
$67.23 |
$0.00 |
$0.00 |
0057 |
MANHOLES ADJUST TO GRADE |
612(A) 0641 |
EA |
2.000 |
2.000 |
|
0.000 |
$879.88 |
$0.00 |
$0.00 |
0058 |
18" R.C.PIPE CLASS III |
613(A) 0491 |
LF |
2,731.000 |
2,731.000 |
141.700 |
383.700 |
$109.09 |
$15,458.05 |
$41,857.83 |
0059 |
24" R.C.PIPE CLASS III |
613(A) 0492 |
LF |
10.000 |
10.000 |
|
0.000 |
$126.36 |
$0.00 |
$0.00 |
0060 |
28" X 18" R.C.PIPE ARCH CLASS A-III |
613(A) 4496 |
LF |
289.000 |
289.000 |
|
0.000 |
$136.36 |
$0.00 |
$0.00 |
0061 |
EDGE DRAIN CONDUIT-PERFORATED |
613(J) 5915 |
LF |
6,708.000 |
6,708.000 |
|
0.000 |
$14.41 |
$0.00 |
$0.00 |
0062 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED |
613(K) 5916 |
LF |
1,200.000 |
1,200.000 |
|
0.000 |
$19.00 |
$0.00 |
$0.00 |
0063 |
(PL)VIDEO INSPECTION OF CONDUIT |
613(Y) 0100 |
LF |
100.000 |
100.000 |
|
0.000 |
$5.00 |
$0.00 |
$0.00 |
0064 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
0.500 |
1.000 |
$452,503.32 |
$226,251.66 |
$452,503.32 |
0065 |
REMOVAL OF CONCRETE PAVEMENT |
619(B) 4727 |
SY |
1,000.000 |
1,000.000 |
|
0.000 |
$12.09 |
$0.00 |
$0.00 |
0066 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
28,331.000 |
28,331.000 |
|
895.780 |
$3.30 |
$0.00 |
$2,956.07 |
0067 |
CONCRETE LONGITUDINAL BARRIER, DESIGN 1 |
627(A) 4317 |
LF |
1,348.000 |
1,348.000 |
|
0.000 |
$63.15 |
$0.00 |
$0.00 |
0068 |
CONCRETE LONGITUDINAL BARRIER END SECTIONS |
627(B) 4410 |
EA |
10.000 |
10.000 |
|
0.000 |
$2,013.41 |
$0.00 |
$0.00 |
0069 |
(PL) IMPACT ATTENUATOR |
871(A) 8330 |
EA |
2.000 |
2.000 |
|
0.000 |
$23,809.37 |
$0.00 |
$0.00 |
0070 |
PORTABLE LONGITUDINAL BARRIER |
877(A) 8483 |
LF |
225.000 |
225.000 |
|
0.000 |
$71.77 |
$0.00 |
$0.00 |
Subtotals For Category 0100/ROADWAY |
$406,623.76 |
$683,033.37 |
|
Fed/State Project Number: ACNHPPI-2400-(004)SS |
Project: 09032(20) |
Category: 0300/SIGNING AND STRIPING |
0071 |
DRILLED SHAFTS 60" DIAMETER |
516(A) 6096 |
LF |
144.000 |
144.000 |
|
0.000 |
$825.75 |
$0.00 |
$0.00 |
0072 |
STRUCTURAL CONCRETE |
804(A) 2915 |
CY |
1.980 |
1.980 |
|
0.000 |
$185.00 |
$0.00 |
$0.00 |
0073 |
REINFORCING STEEL |
804(B) 2916 |
LB |
290.000 |
290.000 |
|
0.000 |
$1.70 |
$0.00 |
$0.00 |
0074 |
(PL)REMOVAL OF OVERHEAD SIGN STRUCTURE & SIGNS |
805(A) 8718 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$10,500.00 |
$0.00 |
$0.00 |
0075 |
SHEET ALUMINUM SIGNS |
850(A) 8110 |
SF |
48.190 |
48.190 |
|
0.000 |
$23.00 |
$0.00 |
$0.00 |
0076 |
EXTRUDED ALUMINUM PANEL SIGNS |
850(B) 8112 |
SF |
42.000 |
42.000 |
|
0.000 |
$24.00 |
$0.00 |
$0.00 |
0077 |
EXTRUDED ALUMINUM PANEL SIGNS(OVERHEAD SIGNS) |
850(B) 8114 |
SF |
2,636.150 |
2,636.150 |
|
0.000 |
$26.00 |
$0.00 |
$0.00 |
0078 |
4"@13 GALV.STEEL WIDE FLANGE BEAM POST |
851(A) 3206 |
LF |
45.000 |
45.000 |
|
0.000 |
$18.00 |
$0.00 |
$0.00 |
0079 |
2 1/2"@5.79 GALV.STEEL PIPE POST |
851(B) 3217 |
LF |
56.000 |
56.000 |
|
0.000 |
$12.00 |
$0.00 |
$0.00 |
0080 |
3"@7.58 GALV.STEEL PIPE POST |
851(B) 3218 |
LF |
34.000 |
34.000 |
|
0.000 |
$13.00 |
$0.00 |
$0.00 |
0081 |
OVHD.SN.STR., MONOTUBE TYPE B 70' |
852(D) 0300 |
EA |
1.000 |
1.000 |
|
0.000 |
$125,000.00 |
$0.00 |
$0.00 |
0082 |
OVHD.SN.STR., MONOTUBE TYPE B 85' |
852(D) 0315 |
EA |
1.000 |
1.000 |
|
0.000 |
$127,500.00 |
$0.00 |
$0.00 |
0083 |
TRAFFIC STRIPE(PLASTIC)(6" WIDE) |
855(A) 8813 |
LF |
12,905.000 |
12,905.000 |
|
0.000 |
$1.70 |
$0.00 |
$0.00 |
0084 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) |
855(A) 8814 |
LF |
1,995.000 |
1,995.000 |
|
0.000 |
$1.95 |
$0.00 |
$0.00 |
0085 |
TRAFFIC STRIPE(PLASTIC)(12" WIDE) |
855(A) 8818 |
LF |
1,070.000 |
1,070.000 |
|
0.000 |
$2.00 |
$0.00 |
$0.00 |
0086 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) |
855(B) 8818 |
EA |
8.000 |
8.000 |
|
0.000 |
$150.00 |
$0.00 |
$0.00 |
0087 |
TRAFFIC STRIPE(PLASTIC)(WORDS) |
855(B) 8821 |
EA |
2.000 |
2.000 |
|
0.000 |
$200.00 |
$0.00 |
$0.00 |
0088 |
TRAFFIC STRIPE(PLASTIC)(SYMBOLS) |
855(B) 8824 |
EA |
6.000 |
6.000 |
|
0.000 |
$2,200.00 |
$0.00 |
$0.00 |
0089 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
857(F) 8006 |
LF |
2,500.000 |
2,500.000 |
|
0.000 |
$0.72 |
$0.00 |
$0.00 |
Subtotals For Category 0300/SIGNING AND STRIPING |
$0.00 |
$0.00 |
|
Fed/State Project Number: ACNHPPI-2400-(004)SS |
Project: 09032(20) |
Category: 0301/LIGHTING |
0090 |
CLASS A CONCRETE |
509(B) 0321 |
CY |
83.800 |
83.800 |
|
0.000 |
$500.00 |
$0.00 |
$0.00 |
0091 |
3/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED |
802(A) 8300 |
LF |
190.000 |
190.000 |
|
0.000 |
$17.00 |
$0.00 |
$0.00 |
0092 |
1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED |
802(A) 8306 |
LF |
80.000 |
80.000 |
|
0.000 |
$22.00 |
$0.00 |
$0.00 |
0093 |
2" PVC SCH.40 PLASTIC CONDUIT BORED |
802(B) 8340 |
LF |
395.000 |
395.000 |
|
0.000 |
$25.00 |
$0.00 |
$0.00 |
0094 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED |
802(B) 8342 |
LF |
1,055.000 |
1,055.000 |
|
0.000 |
$6.00 |
$0.00 |
$0.00 |
0095 |
2" HIGH DENSITY PE PIPE - TRENCHED |
802(C) 8557 |
LF |
2,195.000 |
2,195.000 |
|
0.000 |
$7.00 |
$0.00 |
$0.00 |
0096 |
JUNCTION BOX(8" X 8" X 6") |
802(E) 8372 |
EA |
4.000 |
4.000 |
|
0.000 |
$400.00 |
$0.00 |
$0.00 |
0097 |
PULL BOX |
803(A) 8060 |
EA |
13.000 |
13.000 |
|
0.000 |
$400.00 |
$0.00 |
$0.00 |
0098 |
PULL BOX(SIZE I) |
803(A) 8065 |
EA |
8.000 |
8.000 |
|
0.000 |
$400.00 |
$0.00 |
$0.00 |
0099 |
STRUCTURAL CONCRETE |
804(A) 2915 |
CY |
5.220 |
5.220 |
|
0.000 |
$500.00 |
$0.00 |
$0.00 |
0100 |
REINFORCING STEEL |
804(B) 2916 |
LB |
6,490.600 |
6,490.600 |
|
0.000 |
$1.25 |
$0.00 |
$0.00 |
0101 |
(PL)REMOVAL OF LIGHT POLE |
805(A) 8712 |
EA |
32.000 |
32.000 |
|
33.000 |
$250.00 |
$0.00 |
$8,250.00 |
0102 |
36' MTG.HT.HL.PTP.(G.STL.) |
806(D) 8995 |
EA |
13.000 |
13.000 |
|
0.000 |
$2,105.00 |
$0.00 |
$0.00 |
0103 |
38' MTG.HT.HL.PTP.(G.STL.) |
806(D) 8997 |
EA |
9.000 |
9.000 |
|
0.000 |
$1,500.00 |
$0.00 |
$0.00 |
0104 |
BREAKAWAY BASE (DES. B) |
807 8092 |
EA |
9.000 |
9.000 |
|
0.000 |
$596.00 |
$0.00 |
$0.00 |
0105 |
ROADWAY LUMINAIRE |
809(A) 8090 |
EA |
35.000 |
35.000 |
|
0.000 |
$1,367.00 |
$0.00 |
$0.00 |
0106 |
UNDERPASS LUMINIARE |
809(B) 8098 |
EA |
6.000 |
6.000 |
|
0.000 |
$560.00 |
$0.00 |
$0.00 |
0107 |
SERVICE POLE |
810(A) 3118 |
EA |
1.000 |
1.000 |
|
0.000 |
$3,500.00 |
$0.00 |
$0.00 |
0108 |
1/C NO.4 ELECTRICAL CONDUCTOR |
811 8038 |
LF |
10,100.000 |
10,100.000 |
|
0.000 |
$3.00 |
$0.00 |
$0.00 |
0109 |
1/C NO.10 ELECTRICAL CONDUCTOR |
811 8044 |
LF |
490.000 |
490.000 |
|
0.000 |
$0.50 |
$0.00 |
$0.00 |
0110 |
1/C NO.12 ELECTRICAL CONDUCTOR |
811 8046 |
LF |
4,375.000 |
4,375.000 |
|
0.000 |
$0.40 |
$0.00 |
$0.00 |
0111 |
(PL)TRAFFIC ITEMS |
890 7700 |
LSUM |
1.000 |
1.000 |
|
0.500 |
$10,000.00 |
$0.00 |
$5,000.00 |
Subtotals For Category 0301/LIGHTING |
$0.00 |
$13,250.00 |
|
Fed/State Project Number: ACNHPPI-2400-(004)SS |
Project: 09032(20) |
Category: 0303/TRAFFIC OPERATIONS |
0112 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
857(A) 8839 |
LF |
56,345.000 |
56,345.000 |
|
1,711.000 |
$0.12 |
$0.00 |
$205.32 |
0113 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(ARROWS) |
857(B) 8842 |
EA |
3.000 |
3.000 |
|
0.000 |
$65.00 |
$0.00 |
$0.00 |
0114 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) |
857(C) 8851 |
LF |
1,000.000 |
1,000.000 |
|
0.000 |
$3.20 |
$0.00 |
$0.00 |
0115 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 |
857(E) 8887 |
EA |
1,500.000 |
1,500.000 |
|
0.000 |
$0.80 |
$0.00 |
$0.00 |
0116 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
857(F) 8006 |
LF |
32,150.000 |
32,150.000 |
|
0.000 |
$0.27 |
$0.00 |
$0.00 |
0117 |
SAND FILLED IMPACT ATTENUATION MODULE |
870(A) 8485 |
SD |
18,240.000 |
18,240.000 |
|
0.000 |
$0.15 |
$0.00 |
$0.00 |
0118 |
(SP)CONST.ZONE IMPACT ATTEN. |
871(B) 8705 |
SD |
320.000 |
320.000 |
48.000 |
92.000 |
$4.00 |
$192.00 |
$368.00 |
0119 |
(PL)TRUCK MOUNTED ATTENUATOR |
876(A) 8482 |
SD |
175.000 |
175.000 |
|
0.000 |
$4.00 |
$0.00 |
$0.00 |
0120 |
DELIVER PORTABLE LONGITUDINAL BARRIER |
877(B) 8484 |
LF |
7,112.500 |
7,112.500 |
|
7,213.000 |
$11.26 |
$0.00 |
$81,218.38 |
0121 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER |
877(C) 8486 |
LF |
6,697.500 |
6,697.500 |
|
0.000 |
$10.81 |
$0.00 |
$0.00 |
0122 |
ARROW DISPLAY(TYPE C) |
880(A) 8812 |
SD |
320.000 |
320.000 |
2.000 |
6.000 |
$10.00 |
$20.00 |
$60.00 |
0123 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
10,880.000 |
10,880.000 |
576.000 |
1,104.000 |
$0.10 |
$57.60 |
$110.40 |
0124 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
8,320.000 |
8,320.000 |
344.000 |
665.000 |
$0.10 |
$34.40 |
$66.50 |
0125 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
16,640.000 |
16,640.000 |
616.000 |
1,232.000 |
$0.10 |
$61.60 |
$123.20 |
0126 |
CONSTRUCTION SIGNS 33.0 SF & OVER |
880(B) 8827 |
SD |
960.000 |
960.000 |
|
0.000 |
$20.00 |
$0.00 |
$0.00 |
0127 |
CONSTRUCTION BARRICADES(TYPE III) |
880(C) 8842 |
SD |
1,600.000 |
1,600.000 |
120.000 |
168.000 |
$9.00 |
$1,080.00 |
$1,512.00 |
0128 |
WING BARRICADES |
880(C) 8848 |
SD |
2,560.000 |
2,560.000 |
96.000 |
184.000 |
$0.10 |
$9.60 |
$18.40 |
0129 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
12,800.000 |
12,800.000 |
790.000 |
1,550.000 |
$0.50 |
$395.00 |
$775.00 |
0130 |
DRUMS |
880(F) 8878 |
SD |
7,680.000 |
7,680.000 |
542.000 |
994.000 |
$0.75 |
$406.50 |
$745.50 |
0131 |
TUBE CHANNELIZERS |
880(G) 8884 |
SD |
6,720.000 |
6,720.000 |
542.000 |
1,402.000 |
$1.50 |
$813.00 |
$2,103.00 |
0132 |
TRAFFIC SURVEILLANCE, POLICE |
880(L) 8911 |
HOUR |
1,400.000 |
1,400.000 |
6.500 |
43.500 |
$65.32 |
$424.58 |
$2,841.42 |
0133 |
(SP)SMART WORK ZONE SYSTEM-PORTABLE CHANGEABLE MESSAGE SIGN |
882 8370 |
SD |
11,200.000 |
11,200.000 |
456.000 |
703.000 |
$15.00 |
$6,840.00 |
$10,545.00 |
0134 |
(SP)SMART WORK ZONE SYSTEM-PORTABLE TRAFFIC SENSOR (PTS) |
882 8372 |
SD |
8,640.000 |
8,640.000 |
264.000 |
506.000 |
$5.00 |
$1,320.00 |
$2,530.00 |
0135 |
(SP)SMART WORK ZONE SYSTEM-PAN-TILT-ZOOM CAMERA (PTZC) |
882 8374 |
SD |
320.000 |
320.000 |
24.000 |
46.000 |
$21.00 |
$504.00 |
$966.00 |
0136 |
(SP)SMART WORK ZONE SYSTEM-WEBSITE SYSTEM |
882 8376 |
SD |
320.000 |
320.000 |
24.000 |
46.000 |
$80.00 |
$1,920.00 |
$3,680.00 |
0137 |
(PL)SMART WORK ZONE SYSTEM SETUP |
882 8378 |
EA |
1.000 |
1.000 |
|
1.000 |
$17,000.00 |
$0.00 |
$17,000.00 |
0138 |
PORT.CHANGEABLE MESSAGE SIGN |
882(A) 8306 |
SD |
1,280.000 |
1,280.000 |
|
25.000 |
$5.00 |
$0.00 |
$125.00 |
Subtotals For Category 0303/TRAFFIC OPERATIONS |
$14,078.28 |
$124,993.12 |
|