Oklahoma Department of Transportation
Final Estimate Affidavit

Contract ID: 080371   Estimate Number: 0023 , Final     Spec Year: 1999
Primary JP: 22980(04)   Residency: DUNCAN (07100)     Contract No: 410746
Date Created: 10/22/2013   Contractor FEI: 730799069     Account No: 400700

Project Number(s): STP-169B(117)UR, SSP-169A(129)SS
Contract Description: GRADE, DRAIN, SURFACE AND TRAFFIC SIGNALS CITY STREET (ELK AVENUE): FROM THE DUNCAN BYPASS TO CHISHOLM TRAIL PARKWAY. US-81: DUNCAN BYPASS AT ELK AVENUE. PROJECT LENGTH = 1.204 MILES.
Primary County: STEPHENS              
Name of Road: CITY STREET              
Prime Contractor: T & G CONSTRUCTION, INC.           Time Charged: 618.00
    800 S. E. 1ST STREET           Time Allowed: 547.00
    LAWTON , OK   73501           Percent Time: 112.98 %

  Paid To Date: $2,589,241.80 Payable This Statement: $4,368.95

CONTRACTOR AFFIDAVIT
STATE OF ___________________ )  
  )     §  
COUNTY OF __________________ )  
The undersigned contractor or duly authorized agent, of lawful age, being first duly sworn, on oath say that this claim is true and correct.
Affiant further states that the work, services or materials as shown by this claim have been completed or supplied in accordance with the plans, specifications, orders, requests and all other terms of the contract. Affiant further states that (s)he is duly authorized agent of the contractor for the purpose of certifying the facts pertaining to the giving of things of value to government personnel in order to procure the contract or obtain payment; that (s)he is fully aware of the facts and circumstances surrounding the making of the contract and has been personally and directly involved in the proceedings leading to the procurement of the contract and the filing of this claim; and, neither the contractor nor anyone subject to the contractor's direction or control has been paid, given or donated or agreed to pay, give or donate to any officer or employee of the State of Oklahoma any money or other thing of value, either directly or
indirectly, in procuring the contract or obtaining payment. The affiant further certifies that all laborers, mechanics, apprentices and trainees employed by him/her or by any subcontractor performing work under the contract on the project have been paid wages at rates not less than those required by the contract provisions, and that the work performed by each such laborer, mechanic, apprentice or trainee conformed to the classifications set forth in the contract or training program provisions applicable to the wage rate paid.
Affiant hereby agrees that Contractor will accept this estimate as full compensation for all money due Contractor by the Department of Transportation, and hereby relinquish all claims, either in contract or in tort, which have arisen or which might arise out of the construction of said project. That to the best of my knowledge and belief, all indebtedness for labor, materials, fuel, equipment, equipment rental, parts, supplies, insurance premiums, and claims for items not specifically mentioned, which are attributable to performance of the work on this project or which were incorporated therein in any manner, have been paid in full, and that there are not now any presently outstanding, unpaid claims for such indebtedness; that my position with the company is such, that if there were any such outstanding claims of the nature specified herein, I would ordinarily be aware of them.
Further affiant sayeth not.                                
T & G CONSTRUCTION, INC.                               
 
_________________________________________________
Affiant Signature
 
_________________________________________________
Affiant Printed Name
                          PE Seal
_________________________________________________
Affiant Company Position
Subscribed and sworn to before me this ______ day of ____________, 20____
My Commission Number: ____________ My Commission Expires: ______________
   
_________________________________________________              
_________________________________________________
                    Professional Engineer Signature
              Oklahoma Department of Transportation
Corporate Seal
Notary Seal                  

Oklahoma Department of Transportation
Final Estimate Summary
Created:    10/22/2013
Contract ID: 080371   Estimate Number: 0023     Contract No: 410746
Residency: DUNCAN (07100)   Estimate Type: Final     Account No: 400700

Project Number(s): STP-169B(117)UR, SSP-169A(129)SS
Primary Job Piece No: 22980(04)
Contract Description: GRADE, DRAIN, SURFACE AND TRAFFIC SIGNALS CITY STREET (ELK AVENUE): FROM THE DUNCAN BYPASS TO CHISHOLM TRAIL PARKWAY. US-81: DUNCAN BYPASS AT ELK AVENUE. PROJECT LENGTH = 1.204 MILES.
Primary County: STEPHENS              
Name of Road: CITY STREET              
Prime Contractor: T & G CONSTRUCTION, INC.              
    800 S. E. 1ST STREET              
    LAWTON , OK   73501              
Surety Company: WESTFIELD INSURANCE COMPANY              

Date Let: 11/20/2008 NTP Effective Date: 04/06/2009 Pay Period: 12/15/2010  TO  10/15/2013
Date Awarded: 12/08/2008 Date Work Began: 04/06/2009 Original Contract Time: 240
Date Contract Executed: 12/19/2008 Date Time Stopped: 12/14/2010 Current Time Charged: 618.00
Date NTP Issued: 12/31/2008 Completion Date: 12/14/2010 Current Time Allowed: 547.00
General Liability Expires: 10/01/2014 Workman's Comp Expires: 10/01/2014 Percent Time Used: 112.98 %
Specification Year: 1999        

Current Contract Amount: $2,673,926.81 Total to Date Prev to Date This Estimate
Bid Amount: $2,724,129.58 Participating: $2,673,943.58 $2,669,574.63 $4,368.95
Percent Complete: 96.83 % Non Participating: $0.00 $0.00 $0.00
Funds Available: $84,685.01 Total Earnings: $2,673,943.58 $2,669,574.63 $4,368.95
Unearned Balance: $134,887.78 Stockpiled Materials: $0.00 $0.00 $0.00
Gross Earnings: $2,673,943.58 $2,669,574.63 $4,368.95
Other Adjustments: $-31,451.78 $-31,451.78 $0.00
Liq Dam/Disincentive: $-53,250.00 $-53,250.00 $0.00
TOTAL: $2,589,241.80 $2,584,872.85 $4,368.95

Estimate Adjustment Detail

Contract ID: 080371   Estimate Number: 0023     Primary JP: 22980(04)



CHANGE ORDER HISTORY
Change Order Nbr. Change Order Description Status Approval Date Contract Time Adjustment Total Change Order Amount
002 Finalizing Contract Item Quantities Approved 10/15/2013 0.0 $-50,202.77


STOCKPILE PAYMENT HISTORY
Project Line Nbr Stockpile Description Adjustment Type Estimate Nbr Adjusted Amount
22980(04) 0013 STR-CV/DR (AML) Stockpiled Material Initial Payment 0012 $7,659.76
22980(04) 0013 STR-CV/DR (AML) Stockpiled Material Adjustment 0014 $-7,659.76
22980(04) 0014 STR-CV/DR (AML) Stockpiled Material Adjustment 0014 $-8,537.26
22980(04) 0014 STR-CV/DR (AML) Stockpiled Material Initial Payment 0012 $8,537.26
22980(04) 0015 STR-CV/DR (AML) Stockpiled Material Adjustment 0019 $-5,334.58
22980(04) 0015 STR-CV/DR (AML) Stockpiled Material Initial Payment 0012 $5,334.58
Subtotals For Stockpile Payments $0.00


LIQUIDATED DAMAGES HISTORY
Adjustment Description Estimate Nbr Time Units Rate Adjustment Amount
System Application of Liquidated Damages 0015 --10 $750.00 $-7,500.00
System Application of Liquidated Damages 0016 --12 $750.00 $-9,000.00
System Application of Liquidated Damages 0017 --15 $750.00 $-11,250.00
System Application of Liquidated Damages 0018 --12 $750.00 $-9,000.00
System Application of Liquidated Damages 0019 --15 $750.00 $-11,250.00
System Application of Liquidated Damages 0020 --7.0 $750.00 $-5,250.00
Subtotals For Liquidated Damages $-53,250.00


CONTRACT ADJUSTMENTS HISTORY
Adjustment Description Estimate Nbr Adjustment Amount
No general contract adjustments have been created on this contract.
Subtotals For Contract Adjustments $0.00


LINE ITEM ADJUSTMENT HISTORY
Project Item Nbr Line Item Description Adjustment Type Estimate Nbr Adj Quantity Unit Price Adjusted Amount
24153(04) 0012 (SP)LIME * Material Discrepancy Adjustments 0007 0.00 $0.00 $-320.08
24153(04) 0017 (SP)ASPHALT CONCRETE TYPE S2(PG 64-22 OK) * SUBSTANDARD ITEM 0012 0.00 $0.00 $627.99
24153(04) 0017 (SP)ASPHALT CONCRETE TYPE S2(PG 64-22 OK) Asphalt Binder Adjustment 0012 0.00 $0.00 $-5,722.88
24153(04) 0017 (SP)ASPHALT CONCRETE TYPE S2(PG 64-22 OK) Asphalt Binder Adjustment 0016 0.00 $0.00 $-1,537.40
24153(04) 0017 (SP)ASPHALT CONCRETE TYPE S2(PG 64-22 OK) * SUBSTANDARD ITEM 0022 0.00 $0.00 $-1,255.98
24153(04) 0018 (SP)ASPHALT CONCRETE TYPE S3(PG 76-28 OK) Asphalt Binder Adjustment 0012 0.00 $0.00 $-4,418.16
24153(04) 0018 (SP)ASPHALT CONCRETE TYPE S3(PG 76-28 OK) Asphalt Binder Adjustment 0019 0.00 $0.00 $-1,194.31
24153(04) 0019 (SP)ASPHALT CONCRETE TYPE S4(PG 76-28 OK) * SUBSTANDARD ITEM 0013 0.00 $0.00 $-3,185.89
24153(04) 0019 (SP)ASPHALT CONCRETE TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0013 0.00 $0.00 $-4,708.04
24153(04) 0019 (SP)ASPHALT CONCRETE TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0020 0.00 $0.00 $-1,338.35
24153(04) 0019 (SP)ASPHALT CONCRETE TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0022 -0.35 $-7.41 $2.60
24153(04) 0019 (SP)ASPHALT CONCRETE TYPE S4(PG 76-28 OK) * Material Discrepancy Adjustments 0022 0.00 $0.00 $-371.69
22980(04) 0026 (SP)ASPHALT CONCRETE TYPE S3(PG 70-28 OK) * ROADWAY DENSITY 0012 0.00 $0.00 $1,071.20
22980(04) 0026 (SP)ASPHALT CONCRETE TYPE S3(PG 70-28 OK) * Material Discrepancy Adjustments 0022 0.00 $0.00 $-2,142.40
22980(04) 0027 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) * TEST CODE 0009 0.00 $0.00 $-1,896.06
22980(04) 0027 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) * ROADWAY DENSITY 0009 0.00 $0.00 $-4,388.38
22980(04) 0030 6" CONCRETE DRIVEWAY (H.E.S.) * SUBSTANDARD ITEM 0018 0.00 $0.00 $-673.95
22980(04) 0044 REINFORCING STEEL * Material Discrepancy Adjustments 0010 0.00 $0.00 $2,384.67
22980(04) 0044 REINFORCING STEEL * Material Discrepancy Adjustments 0017 0.00 $0.00 $-2,384.67
Subtotals For Line Item Adjustments $-31,451.78
* = User applied Line Item Adjustments


MILESTONE INFORMATION
Milestone Number Milestone Description Start Date End Date Current Time Allowed Rate Milestone Closed
No milestones exist for this contract.


MILESTONE ADJUSTMENTS
Milestone Number Milestone Adjustment Description Estimate Nbr Total
No milestones adjustments exist for this contract.
Subtotals For Milestones $

Line Item Detail

Contract ID: 080371   Estimate Number: 0023     Primary JP: 22980(04)



Line Item Number Item Description Item Number Units Bid Qty Current Quantity Quantity Paid This Est. Quantity Paid To Date Unit Price Amount Paid This Est. Amount Paid To Date
Fed/State Project Number:    STP-169B(117)UR Project:    22980(04) Category:    0100/ROADWAY STP-169B(117)UR
0001 CLEARING AND GRUBBING 201 0102 LSUM 1.000 1.000   1.000 $40,000.00 $0.00 $40,000.00
0002 TYPE A-SALVAGED TOPSOIL 205 4229 LSUM 1.000 1.000   1.000 $10,000.00 $0.00 $10,000.00
0003 TEMPORARY SILT FENCE 223 2801 LF 300.000 0.000   0.000 $2.40 $0.00 $0.00
0004 TEMPORARY SEDIMENT FILTER 224 2803 EA 12.000 0.000   0.000 $200.00 $0.00 $0.00
0005 SOLID SLAB SODDING 230(A) 2806 SY 4,500.000 11,951.110   11,951.110 $3.20 $0.00 $38,243.55
0006 (SP)FLY ASH 327(A) 4200 TON 1,092.000 948.950   948.950 $70.00 $0.00 $66,426.50
0007 (SP)CEMENTITIOUS STABILIZED SUBGRADE 327(E) 4240 SY 25,292.000 24,204.020   24,204.020 $5.00 $0.00 $121,020.10
0008 TRAFFIC BOUND SURFACE COURSE TYPE E 403(E) 0225 TON 612.000 474.990   474.990 $25.50 $0.00 $12,112.25
0009 CLASS C CONCRETE 509(D) 0325 CY 75.000 74.640   74.640 $270.00 $0.00 $20,152.80
0010 TYPE I PLAIN RIPRAP 601(A) 0297 TON 10.000 10.990   10.990 $55.00 $0.00 $604.45
0011 INLET CICI DES. 2 (B) 611(E) 5113 EA 3.000 3.000   3.000 $4,368.00 $0.00 $13,104.00
0012 INLET CICI DES. 2 (D) 611(E) 5115 EA 2.000 2.000   2.000 $5,865.00 $0.00 $11,730.00
0013 INLET W/SMALL JCT.BOX,CICI-JB-1,DES.2(B) 611(E) 5972 EA 3.000 3.000   3.000 $7,604.00 $0.00 $22,812.00
0014 INLET W/SMALL JCT.BOX,CICI-JB-1,DES.2(D) 611(E) 5974 EA 3.000 3.000   3.000 $7,763.00 $0.00 $23,289.00
0015 INLET W/SMALL JCT.BOX,CICI-JB-1,DES.3(D) 611(E) 5986 EA 1.000 1.000   1.000 $11,089.00 $0.00 $11,089.00
0016 18" R.C.PIPE CLASS III 613(B) 0491 LF 306.000 306.000   306.000 $58.35 $0.00 $17,855.10
0017 18" CORR. GALV. STEEL PIPE 613(D) 0689 LF 1,475.000 1,471.000   1,471.000 $30.00 $0.00 $44,130.00
0018 15" CORR. GALV. STEEL PIPE 613(D) 5717 LF 150.000 50.000   50.000 $25.00 $0.00 $1,250.00
0019 18" PREFAB. CULVERT END SECTION, ROUND 613(M) 5726 EA 2.000 2.000   2.000 $700.00 $0.00 $1,400.00
0020 6" PERFORATED PIPE UNDERDRAIN ROUND 613(P) 1091 LF 375.000 0.000   0.000 $20.00 $0.00 $0.00
0021 6" NON-PERF.PIPE UNDERDRAIN RND. 613(Q) 1096 LF 125.000 0.000   0.000 $14.00 $0.00 $0.00
0022 (SP)FENCE-STYLE SWF (5 BARBED WIRE) 624(C) 4459 LF 1,375.000 931.000   931.000 $5.95 $0.00 $5,539.45
Subtotals For Category     0100/ROADWAY STP-169B(117)UR    $0.00 $460,758.20
Fed/State Project Number:    STP-169B(117)UR Project:    22980(04) Category:    0110/ASPHALT OPTION STP-169B(117)UR
0023 UNCLASSIFIED EXCAVATION 202(A) 0183 CY 10,504.000 10,504.000   10,504.000 $10.00 $0.00 $105,040.00
0024 TACK COAT 407 0250 GAL 2,378.000 1,740.000   1,740.000 $3.00 $0.00 $5,220.00
0025 PRIME COAT 408 5774 GAL 3,727.000 4,039.420   4,039.420 $8.00 $0.00 $32,315.36
0026 (SP)ASPHALT CONCRETE TYPE S3(PG 70-28 OK) 411(S3) 5940 TON 4,862.000 4,547.100   4,547.100 $92.00 $0.00 $418,333.20
0027 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) 411(S3) 5945 TON 4,494.000 4,569.010   4,569.010 $88.00 $0.00 $402,072.88
0028 (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) 411(S4) 5955 TON 2,438.000 2,864.110   2,864.110 $97.00 $0.00 $277,818.67
0029 1'-8" COMB. CURB & GUTTER (6" BARRIER) 609(B) 1513 LF 7,485.000 7,478.000   7,478.000 $13.00 $0.00 $97,214.00
0030 6" CONCRETE DRIVEWAY (H.E.S.) 610(B) 0399 SY 614.180 881.270   881.270 $38.00 $0.00 $33,488.26
Subtotals For Category     0110/ASPHALT OPTION STP-169B(117)UR    $0.00 $1,371,502.37
Fed/State Project Number:    STP-169B(117)UR Project:    22980(04) Category:    0300/TRAFFIC STP-169(117)UR
0038 2" PVC SCH.40 PLASTIC CONDUIT TRENCHED 802(B) 8342 LF 120.000 48.000   48.000 $4.20 $0.00 $201.60
0039 3" PVC SCH.40 PLASTIC CONDUIT BORED 802(B) 8344 LF 280.000 257.000   257.000 $21.00 $0.00 $5,397.00
0040 3" PVC SCH.40 PLASTIC CONDUIT TRENCHED 802(B) 8346 LF 70.000 46.000   46.000 $4.80 $0.00 $220.80
0041 PULL BOX(SIZE I) 803 8065 EA 3.000 3.000   3.000 $260.00 $0.00 $780.00
0042 PULL BOX(SIZE II) 803 8066 EA 1.000 1.000   1.000 $290.00 $0.00 $290.00
0043 STRUCTURAL CONCRETE 804(A) 2915 CY 10.900 10.900   10.900 $570.00 $0.00 $6,213.00
0044 REINFORCING STEEL 804(B) 2916 LB 1,644.600 1,644.600   1,644.600 $1.45 $0.00 $2,384.67
0045 POLE & 25' TS MST.ARM(G.STL.) 806(A) 8726 EA 1.000 1.000   1.000 $3,518.00 $0.00 $3,518.00
0046 POLE & 30' TS MST.ARM(G.STL.) 806(A) 8728 EA 1.000 1.000   1.000 $3,898.00 $0.00 $3,898.00
0047 POLE & 40' TS MST.ARM(G.STL.) 806(A) 8732 EA 2.000 2.000   2.000 $5,378.00 $0.00 $10,756.00
0048 SERVICE POLE 810(A) 3118 EA 1.000 1.000   1.000 $1,569.00 $0.00 $1,569.00
0049 1/C NO.6 ELECTRICAL CONDUCTOR 811 8040 LF 200.000 88.000   88.000 $1.70 $0.00 $149.60
0050 VEH.ACT.SOL.ST.TRAF.SIG.CON.ASM 825 8550 EA 1.000 1.000   1.000 $9,443.00 $0.00 $9,443.00
0051 (PL)DETECTION SYSTEM (VIDEO) 828 8132 LSUM 1.000 1.000   1.000 $21,143.00 $0.00 $21,143.00
0052 1WAY 3SEC. ADJ. SIG. HD. S-6 831 8231 EA 8.000 8.000   8.000 $522.00 $0.00 $4,176.00
0053 1WAY 3SEC. ADJ. SIG. HD. S-9 831 8252 EA 2.000 2.000   2.000 $484.00 $0.00 $968.00
0054 BACKPLATE 833 3030 EA 10.000 10.000   10.000 $81.00 $0.00 $810.00
0055 5/C TRAF.SIG.ELECT.CABLE 834(A) 8207 LF 833.000 818.000   818.000 $1.10 $0.00 $899.80
0056 9/C TRAF.SIG.EL.CABLE 834(A) 8209 LF 352.000 275.000   275.000 $1.65 $0.00 $453.75
0057 (PL)E.P.S. OPTICAL DETECTOR 840(B) 8593 EA 4.000 4.000   4.000 $610.00 $0.00 $2,440.00
0058 (PL)E.P.S. OPTICAL DETECTOR CABLE 840(C) 8594 LF 685.000 536.000   536.000 $0.90 $0.00 $482.40
0059 (PL)E.P.S. 2 CHANNEL PHASE SELECTOR 840(D) 8595 EA 2.000 2.000   2.000 $1,570.00 $0.00 $3,140.00
0060 SHEET ALUMINUM SIGNS 850(A) 8110 SF 35.610 29.360   29.360 $17.00 $0.00 $499.12
0061 MAST ARM MOUNTED SIGNS(ALUMINUM) 850(C) 8118 SF 61.500 61.500   61.500 $25.00 $0.00 $1,537.50
0062 2" SQUARE TUBE POST 851(C) 8324 LF 72.000 60.000   60.000 $19.00 $0.00 $1,140.00
0063 TRAFFIC STRIPE(PLASTIC)(4" WIDE) 855(A) 8812 LF 13,385.000 12,142.000   12,142.000 $1.30 $0.00 $15,784.60
0064 TRAFFIC STRIPE(PLASTIC)(ARROWS) 855(B) 8818 EA 4.000 10.000   10.000 $100.00 $0.00 $1,000.00
0065 TRAFFIC STRIPE(PLASTIC)(WORDS) 855(B) 8821 EA 2.000 2.000   2.000 $135.00 $0.00 $270.00
0066 CONSTRUCTION TRAFFIC CONTROL 880(J) 8905 LSUM 1.000 1.000   1.000 $17,890.00 $0.00 $17,890.00
0067 (PL)REMOVAL OF EXISTING SIGNS 890(A) 8724 EA 4.000 4.000   4.000 $50.00 $0.00 $200.00
Subtotals For Category     0300/TRAFFIC STP-169(117)UR    $0.00 $117,654.84
Fed/State Project Number:    STP-169B(117)UR Project:    22980(04) Category:    0600/STAKING STP-169B(117)UR
0068 STAKING 642 0098 LSUM 1.000 1.000   1.000 $23,950.00 $0.00 $23,950.00
Subtotals For Category     0600/STAKING STP-169B(117)UR    $0.00 $23,950.00
Fed/State Project Number:    STP-169B(117)UR Project:    22980(04) Category:    0640/CONSTRUCTION STP-169B(117)UR
0069 (SP)SWPPP DOCUMENTATION AND MANAGEMENT 220 2800 LSUM 1.000 1.000 0.500 1.000 $15,000.00 $7,500.00 $15,000.00
0070 MOBILIZATION 641 1552 LSUM 1.000 1.000   1.000 $85,000.00 $0.00 $85,000.00
Subtotals For Category     0640/CONSTRUCTION STP-169B(117)UR    $7,500.00 $100,000.00
Subtotals For Project STP-169B(117)UR /22980(04) $7,500.00 $2,073,865.41


Line Item Number Item Description Item Number Units Bid Qty Current Quantity Quantity Paid This Est. Quantity Paid To Date Unit Price Amount Paid This Est. Amount Paid To Date
Fed/State Project Number:    SSP-169A(129)SS Project:    24153(04) Category:    0100/ROADWAY SSP-169A(129)SS
0001 CLEARING AND GRUBBING 201 0102 LSUM 1.000 0.000   0.000 $15,000.00 $0.00 $0.00
0002 UNCLASSIFIED EXCAVATION 202(A) 0183 CY 1,572.000 1,572.000   1,572.000 $10.00 $0.00 $15,720.00
0003 UNCLASSIFIED BORROW 202(C) 0184 CY 500.000 500.000   500.000 $25.00 $0.00 $12,500.00
0004 TYPE A-SALVAGED TOPSOIL 205 4229 LSUM 1.000 1.000   1.000 $1,500.00 $0.00 $1,500.00
0005 TEMPORARY SILT FENCE 223 2801 LF 500.000 0.000   0.000 $2.40 $0.00 $0.00
0006 TEMPORARY SILT DIKE 227 0100 LF 56.000 0.000   0.000 $9.20 $0.00 $0.00
0007 SOLID SLAB SODDING 230(A) 2806 SY 2,712.000 0.000   0.000 $3.20 $0.00 $0.00
0008 VEGETATIVE MULCHING 233(A) 2817 AC 2.080 0.000   0.000 $500.00 $0.00 $0.00
0009 MOWING 241 2832 AC 35.000 0.000   0.000 $100.00 $0.00 $0.00
0010 AGGREGATE BASE 303 0192 CY 978.000 971.400 -114.220 971.740 $49.30 $-5,631.05 $47,906.77
0011 SEPARATOR FABRIC 325 5271 SY 7,147.000 6,773.410   6,773.410 $2.25 $0.00 $15,240.18
0012 (SP)LIME 327(D) 4230 TON 89.000 65.220   65.220 $200.00 $0.00 $13,044.00
0013 (SP)LIME STABILIZED SUBGRADE 327(H) 4270 SY 6,587.000 5,425.740   5,425.740 $4.50 $0.00 $24,415.84
0014 TRAFFIC BOUND SURFACE COURSE TYPE E 403(E) 0225 TON 402.000 409.160   409.160 $49.30 $0.00 $20,171.59
0015 TACK COAT 407 0250 GAL 614.000 435.000   435.000 $4.00 $0.00 $1,740.00
0016 PRIME COAT 408 5774 GAL 2,261.000 1,888.940   1,888.940 $8.00 $0.00 $15,111.52
0017 (SP)ASPHALT CONCRETE TYPE S2(PG 64-22 OK) 411(S2) 5930 TON 1,195.000 1,123.010   1,123.010 $90.00 $0.00 $101,070.90
0018 (SP)ASPHALT CONCRETE TYPE S3(PG 76-28 OK) 411(S3) 5935 TON 874.000 828.200   828.200 $115.00 $0.00 $95,243.00
0019 (SP)ASPHALT CONCRETE TYPE S4(PG 76-28 OK) 411(S4) 5950 TON 785.000 786.350   786.350 $135.00 $0.00 $106,157.25
0020 COLD MILLING PAVEMENT 417 5267 SY 2,339.000 2,362.020   2,362.020 $6.00 $0.00 $14,172.12
0021 CLASS A CONCRETE 509(B) 0321 CY 6.000 5.040   5.040 $400.00 $0.00 $2,016.00
0022 1'-8" COMB. CURB & GUTTER (4" MNTBLE) 609(B) 1500 LF 124.000 124.000   124.000 $18.00 $0.00 $2,232.00
0023 REMOVAL OF ASPHALT PAVEMENT 619(B) 4728 SY 683.000 681.680   681.680 $10.00 $0.00 $6,816.80
0024 SAWING PAVEMENT 619(C) 0924 LF 2,939.000 2,959.000   2,959.000 $5.00 $0.00 $14,795.00
Subtotals For Category     0100/ROADWAY SSP-169A(129)SS    $-5,631.05 $509,852.97
Fed/State Project Number:    SSP-169A(129)SS Project:    24153(04) Category:    0300/TRAFFIC CONTROL SSP-169A(129)SS
0025 SHEET ALUMINUM SIGNS 850(A) 8110 SF 25.000 25.000   25.000 $17.50 $0.00 $437.50
0026 2 1/4" SQUARE TUBE POST 851(C) 8327 LF 54.000 54.000   54.000 $25.00 $0.00 $1,350.00
0027 TRAFFIC STRIPE(PLASTIC)(4" WIDE) 855(A) 8812 LF 14,500.000 5,012.000   5,012.000 $0.50 $0.00 $2,506.00
0028 TRAFFIC STRIPE(PLASTIC)(ARROWS) 855(B) 8818 EA 8.000 0.000   0.000 $90.00 $0.00 $0.00
0029 TRAFFIC STRIPE(PLASTIC)(WORDS) 855(B) 8821 EA 4.000 0.000   0.000 $100.00 $0.00 $0.00
0030 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) 856(A) 8839 LF 12,000.000 0.000   0.000 $0.10 $0.00 $0.00
0031 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 856(G) 8887 EA 2,400.000 0.000   0.000 $0.55 $0.00 $0.00
0032 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) 859(A) 8006 LF 6,000.000 0.000   0.000 $0.25 $0.00 $0.00
0033 CONSTRUCTION SIGNS 0 TO 6.25 SF 880(B) 8818 SD 1,440.000 0.000   0.000 $0.50 $0.00 $0.00
0034 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF 880(B) 8821 SD 360.000 2,785.000   2,785.000 $2.00 $0.00 $5,570.00
0035 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF 880(B) 8824 SD 900.000 3,105.000   3,105.000 $2.50 $0.00 $7,762.50
0036 BARRICADES(TYPE III) 880(C) 8842 SD 1,440.000 208.000   208.000 $1.15 $0.00 $239.20
0037 VERTICAL PANELS 880(D) 8854 SD 4,860.000 0.000   0.000 $0.35 $0.00 $0.00
0038 WARNING LIGHTS(TYPE A) 880(E) 8860 SD 3,600.000 2,964.000   2,964.000 $0.20 $0.00 $592.80
0039 WARNING LIGHTS(TYPE C) 880(E) 8872 SD 11,700.000 3,760.000   3,760.000 $0.11 $0.00 $413.60
0040 DRUMS 880(F) 8878 SD 6,840.000 3,760.000   3,760.000 $0.36 $0.00 $1,353.60
0041 PORT.CHANGEABLE MESSAGE SIGN 882(B) 8306 SD 180.000 0.000   0.000 $15.00 $0.00 $0.00
Subtotals For Category     0300/TRAFFIC CONTROL SSP-169A(129)SS    $0.00 $20,225.20
Fed/State Project Number:    SSP-169A(129)SS Project:    24153(04) Category:    0600/STAKING SSP-169A(129)SS
0042 STAKING 642 0098 LSUM 1.000 1.000   1.000 $20,000.00 $0.00 $20,000.00
Subtotals For Category     0600/STAKING SSP-169A(129)SS    $0.00 $20,000.00
Fed/State Project Number:    SSP-169A(129)SS Project:    24153(04) Category:    0640/CONSTRUCTION SSP-169A(129)SS
0043 (SP)SWPPP DOCUMENTATION AND MANAGEMENT 220 2800 LSUM 1.000 1.000 0.250 1.000 $10,000.00 $2,500.00 $10,000.00
0044 MOBILIZATION 641 1399 LSUM 1.000 1.000   1.000 $40,000.00 $0.00 $40,000.00
Subtotals For Category     0640/CONSTRUCTION SSP-169A(129)SS    $2,500.00 $50,000.00
Subtotals For Project SSP-169A(129)SS /24153(04) $-3,131.05 $600,078.17