Fed/State Project Number: NHY-011N (017) |
Project: 12544(12) |
Category: 0100/ROADWAY |
0001 |
CLEARING AND GRUBBING |
201 0102 |
LSUM |
1.000 |
1.000 |
|
0.250 |
$27,000.00 |
$0.00 |
$6,750.00 |
0002 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
69,611.000 |
69,611.000 |
27,766.620 |
27,949.000 |
$2.55 |
$70,804.88 |
$71,269.95 |
0003 |
UNCLASSIFIED BORROW |
202(C) 0184 |
CY |
71,237.000 |
71,237.000 |
|
0.000 |
$3.85 |
$0.00 |
$0.00 |
0004 |
TYPE A-SALVAGED TOPSOIL |
205 4229 |
LSUM |
1.000 |
1.000 |
0.500 |
0.500 |
$20,500.00 |
$10,250.00 |
$10,250.00 |
0005 |
TEMPORARY BALE BARRIER |
222 2801 |
LF |
100.000 |
100.000 |
|
0.000 |
$4.10 |
$0.00 |
$0.00 |
0006 |
TEMPORARY SILT FENCE |
223 2801 |
LF |
800.000 |
800.000 |
343.000 |
343.000 |
$1.50 |
$514.50 |
$514.50 |
0007 |
TEMPORARY SEDIMENT FILTER |
224 2803 |
EA |
10.000 |
10.000 |
1.000 |
1.000 |
$76.50 |
$76.50 |
$76.50 |
0008 |
TEMPORARY SILT DIKE |
227 0100 |
LF |
1,008.000 |
1,008.000 |
|
0.000 |
$7.65 |
$0.00 |
$0.00 |
0009 |
DITCH LINER PROTECTION |
229 4318 |
LF |
1,700.000 |
1,700.000 |
|
0.000 |
$1.30 |
$0.00 |
$0.00 |
0010 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
156,292.000 |
156,292.000 |
|
0.000 |
$1.00 |
$0.00 |
$0.00 |
0011 |
MULCH SODDING |
230(B) 2807 |
SY |
51,501.000 |
51,501.000 |
|
0.000 |
$1.00 |
$0.00 |
$0.00 |
0012 |
SEEDING METHOD B |
232(B) 2814 |
AC |
42.930 |
42.930 |
|
0.000 |
$510.00 |
$0.00 |
$0.00 |
0013 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
42.930 |
42.930 |
|
0.000 |
$357.00 |
$0.00 |
$0.00 |
0014 |
(PL)ROCK FILTER DAM, TYPE 1 |
235(A) 0100 |
CY |
50.000 |
50.000 |
|
0.000 |
$210.00 |
$0.00 |
$0.00 |
0015 |
MOWING |
241 2832 |
AC |
85.860 |
85.860 |
|
0.000 |
$66.50 |
$0.00 |
$0.00 |
0016 |
AGGREGATE BASE |
303 0192 |
CY |
16,866.000 |
16,866.000 |
|
0.000 |
$41.50 |
$0.00 |
$0.00 |
0017 |
SEPARATOR FABRIC |
325 5271 |
SY |
107,764.000 |
107,764.000 |
|
0.000 |
$0.75 |
$0.00 |
$0.00 |
0018 |
(SP)FLY ASH |
326(A) 4200 |
TON |
4,857.000 |
4,857.000 |
|
0.000 |
$60.00 |
$0.00 |
$0.00 |
0019 |
(SP)LIME |
326(B) 4210 |
TON |
608.000 |
608.000 |
|
0.000 |
$80.00 |
$0.00 |
$0.00 |
0020 |
(SP)CEMENTITIOUS STABILIZED SUBGRADE |
326(E) 4240 |
SY |
112,431.000 |
112,431.000 |
|
0.000 |
$1.40 |
$0.00 |
$0.00 |
0021 |
(SP)LIME PRETREATMENT |
326(G) 4260 |
SY |
33,730.000 |
33,730.000 |
|
0.000 |
$0.70 |
$0.00 |
$0.00 |
0022 |
TRAFFIC BOUND SURFACE COURSE TYPE A |
403(A) 0217 |
TON |
964.000 |
964.000 |
0.000 |
394.320 |
$21.20 |
$0.00 |
$8,359.58 |
0023 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
403(E) 0225 |
TON |
8,557.000 |
8,557.000 |
|
0.000 |
$20.30 |
$0.00 |
$0.00 |
0024 |
TACK COAT |
407 0250 |
GAL |
14,605.000 |
14,605.000 |
|
0.000 |
$1.50 |
$0.00 |
$0.00 |
0025 |
PRIME COAT |
408 5774 |
GAL |
37,205.000 |
37,205.000 |
|
0.000 |
$2.90 |
$0.00 |
$0.00 |
0026 |
(SP)ASPHALT CONCRETE TYPE S2(PG 64-22 OK) |
411(S2) 5930 |
TON |
26,561.000 |
26,561.000 |
0.000 |
203.170 |
$36.60 |
$0.00 |
$7,436.02 |
0027 |
(SP)ASPHALT CONCRETE TYPE S3(PG 76-28 OK) |
411(S3) 5935 |
TON |
12,164.000 |
12,164.000 |
|
0.000 |
$44.45 |
$0.00 |
$0.00 |
0028 |
(SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) |
411(S3) 5945 |
TON |
4,456.000 |
4,456.000 |
0.000 |
191.850 |
$37.35 |
$0.00 |
$7,165.60 |
0029 |
(SP)ASPHALT CONCRETE TYPE S4(PG 76-28 OK) |
411(S4) 5950 |
TON |
8,062.000 |
8,062.000 |
|
0.000 |
$53.45 |
$0.00 |
$0.00 |
0030 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) |
411(S4) 5960 |
TON |
3,048.000 |
3,048.000 |
0.000 |
169.270 |
$46.65 |
$0.00 |
$7,896.45 |
0031 |
RUMBLE STRIP-METHOD AC-CON |
413(A) 4861 |
LF |
35,586.000 |
35,586.000 |
|
0.000 |
$0.15 |
$0.00 |
$0.00 |
0032 |
STRUCTURAL EXCAVATION UNCLASSIFIED |
501(A) 0313 |
CY |
75.000 |
75.000 |
|
72.810 |
$10.25 |
$0.00 |
$746.30 |
0033 |
CLASS A CONCRETE |
509(B) 0321 |
CY |
164.000 |
164.000 |
0.000 |
153.780 |
$347.00 |
$0.00 |
$53,361.66 |
0034 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
360.000 |
360.000 |
|
0.000 |
$205.00 |
$0.00 |
$0.00 |
0035 |
REINFORCING STEEL |
511(A) 0332 |
LB |
25,771.000 |
25,771.000 |
0.000 |
24,743.160 |
$0.85 |
$0.00 |
$21,031.69 |
0036 |
TYPE I PLAIN RIPRAP |
601(A) 0297 |
TON |
50.000 |
50.000 |
|
0.000 |
$35.50 |
$0.00 |
$0.00 |
0037 |
INLET (SMD-TYPE 2) |
611(E) 6002 |
EA |
1.000 |
1.000 |
|
0.000 |
$1,280.00 |
$0.00 |
$0.00 |
0038 |
INLET (SMD-TYPE 2B) |
611(E) 6006 |
EA |
6.000 |
6.000 |
|
0.000 |
$1,900.00 |
$0.00 |
$0.00 |
0039 |
INLETS ADJUST TO GRADE |
612(E) 0645 |
EA |
3.000 |
3.000 |
|
0.000 |
$1,500.00 |
$0.00 |
$0.00 |
0040 |
18" R.C.PIPE CLASS III |
613(B) 0491 |
LF |
420.000 |
420.000 |
-152.000 |
0.000 |
$28.25 |
$-4,294.00 |
$0.00 |
0041 |
24" R.C.PIPE CLASS III |
613(B) 0492 |
LF |
170.000 |
170.000 |
|
0.000 |
$37.00 |
$0.00 |
$0.00 |
0042 |
30" R.C.PIPE CLASS III |
613(B) 0493 |
LF |
20.000 |
20.000 |
|
0.000 |
$48.50 |
$0.00 |
$0.00 |
0043 |
36" X 22" R.C.PIPE ARCH CLASS A-III |
613(B) 4497 |
LF |
98.000 |
98.000 |
|
0.000 |
$81.85 |
$0.00 |
$0.00 |
0044 |
TYPE A4 CULVERT END TREATMENT |
613(CC) 7186 |
EA |
4.000 |
4.000 |
|
0.000 |
$693.00 |
$0.00 |
$0.00 |
0045 |
TYPE C4 CULVERT END TREATMENT |
613(CC) 7188 |
EA |
8.000 |
8.000 |
|
0.000 |
$1,000.00 |
$0.00 |
$0.00 |
0046 |
TYPE D4 CULVERT END TREATMENT |
613(CC) 7189 |
EA |
1.000 |
1.000 |
|
0.000 |
$1,425.00 |
$0.00 |
$0.00 |
0047 |
TYPE A6 CULVERT END TREATMENT |
613(CC) 7196 |
EA |
10.000 |
10.000 |
|
0.000 |
$900.00 |
$0.00 |
$0.00 |
0048 |
TYPE B6 CULVERT END TREATMENT |
613(CC) 7197 |
EA |
4.000 |
4.000 |
|
0.000 |
$930.00 |
$0.00 |
$0.00 |
0049 |
TYPE C6 CULVERT END TREATMENT |
613(CC) 7198 |
EA |
9.000 |
9.000 |
|
0.000 |
$1,200.00 |
$0.00 |
$0.00 |
0050 |
TYPE D6 CULVERT END TREATMENT |
613(CC) 7199 |
EA |
1.000 |
1.000 |
|
0.000 |
$1,000.00 |
$0.00 |
$0.00 |
0051 |
18" CORR. GALV. STEEL PIPE |
613(D) 0689 |
LF |
424.000 |
424.000 |
176.000 |
176.000 |
$15.35 |
$2,701.60 |
$2,701.60 |
0052 |
30" CORR. GALV. STEEL PIPE |
613(D) 0691 |
LF |
276.000 |
276.000 |
|
0.000 |
$23.35 |
$0.00 |
$0.00 |
0053 |
36" CORR. GALV. STEEL PIPE |
613(D) 0692 |
LF |
104.000 |
104.000 |
|
0.000 |
$28.35 |
$0.00 |
$0.00 |
0054 |
42" X 29" CORR. GALV. STEEL PIPE ARCH |
613(D) 4530 |
LF |
94.000 |
94.000 |
|
0.000 |
$34.80 |
$0.00 |
$0.00 |
0055 |
8" PERFORATED PIPE UNDERDRAIN ROUND |
613(P) 1092 |
LF |
1,388.000 |
1,388.000 |
|
0.000 |
$8.25 |
$0.00 |
$0.00 |
0056 |
8" NON-PERF.PIPE UNDERDRAIN RND. |
613(Q) 1097 |
LF |
462.000 |
462.000 |
|
0.000 |
$8.25 |
$0.00 |
$0.00 |
0057 |
PIPE UNDERDRAIN COVER MAT'L. |
613(R) 1100 |
CY |
417.000 |
417.000 |
|
0.000 |
$31.20 |
$0.00 |
$0.00 |
0058 |
TRENCH EXCAVATION |
613(S) 1180 |
CY |
613.000 |
613.000 |
|
0.000 |
$5.15 |
$0.00 |
$0.00 |
0059 |
STANDARD BEDDING MATERIAL |
613(T) 1181 |
CY |
66.000 |
66.000 |
|
0.000 |
$12.10 |
$0.00 |
$0.00 |
0060 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$15,000.00 |
$0.00 |
$0.00 |
0061 |
REMOVAL OF HEADWALL |
619(B) 0291 |
EA |
7.000 |
7.000 |
|
4.000 |
$500.00 |
$0.00 |
$2,000.00 |
0062 |
REMOVAL OF CONCRETE PAVEMENT |
619(B) 4727 |
SY |
17,067.000 |
17,067.000 |
|
20,133.330 |
$3.75 |
$0.00 |
$75,499.99 |
0063 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
39,214.000 |
39,214.000 |
6,476.290 |
34,698.960 |
$1.65 |
$10,685.88 |
$57,253.29 |
0064 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY |
619(B) 4763 |
SY |
17,334.000 |
17,334.000 |
|
17,473.330 |
$1.65 |
$0.00 |
$28,830.99 |
0065 |
REMOVAL OF GUARD RAIL |
619(B) 4780 |
LF |
679.000 |
679.000 |
|
679.000 |
$1.50 |
$0.00 |
$1,018.50 |
0066 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
6,069.000 |
6,069.000 |
|
0.000 |
$2.50 |
$0.00 |
$0.00 |
0067 |
BEAM GUARD RAIL-W-BEAM-SINGLE |
623(A) 0932 |
LF |
1,275.000 |
1,275.000 |
|
0.000 |
$19.25 |
$0.00 |
$0.00 |
0068 |
GUARD RAIL ANCHOR UNIT (TYPE B) |
623(F) 4447 |
EA |
1.000 |
1.000 |
|
0.000 |
$725.00 |
$0.00 |
$0.00 |
0069 |
(SP)G.E.T. GUARD RAIL END SECTION |
623(H) 8571 |
EA |
3.000 |
3.000 |
|
0.000 |
$2,550.00 |
$0.00 |
$0.00 |
0070 |
(PL)BRIDGE GUARD RAIL CONNECTION-TYPE A |
623(I) 8675 |
EA |
2.000 |
2.000 |
|
0.000 |
$1,800.00 |
$0.00 |
$0.00 |
0071 |
MAILBOX INSTALLATION-SINGLE |
629(A) 4958 |
EA |
8.000 |
8.000 |
|
0.000 |
$71.50 |
$0.00 |
$0.00 |
0072 |
MAILBOX INSTALLATION-MULTIPLE |
629(B) 4959 |
EA |
1.000 |
1.000 |
|
0.000 |
$130.00 |
$0.00 |
$0.00 |
0073 |
MAILBOX |
629(C) 4960 |
EA |
10.000 |
10.000 |
|
0.000 |
$25.50 |
$0.00 |
$0.00 |
0074 |
REMOVAL OF MAILBOX INSTALLATION |
629(D) 4961 |
EA |
10.000 |
10.000 |
|
0.000 |
$10.25 |
$0.00 |
$0.00 |
Fed/State Project Number: NHY-011N (017) |
Project: 12544(12) |
Category: 0300/TRAFFIC ITEMS |
0075 |
SHEET ALUMINUM SIGNS |
850(A) 8110 |
SF |
172.000 |
172.000 |
|
0.000 |
$11.25 |
$0.00 |
$0.00 |
0076 |
2" SQUARE TUBE POST |
851(C) 8324 |
LF |
29.000 |
29.000 |
|
0.000 |
$6.25 |
$0.00 |
$0.00 |
0077 |
2 1/4" SQUARE TUBE POST |
851(C) 8327 |
LF |
315.000 |
315.000 |
|
0.000 |
$6.25 |
$0.00 |
$0.00 |
0078 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) |
855(A) 8812 |
LF |
89,000.000 |
89,000.000 |
|
0.000 |
$0.45 |
$0.00 |
$0.00 |
0079 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) |
855(B) 8818 |
EA |
30.000 |
30.000 |
|
0.000 |
$60.00 |
$0.00 |
$0.00 |
0080 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
856(A) 8839 |
LF |
35,000.000 |
35,000.000 |
|
62,725.000 |
$0.10 |
$0.00 |
$6,272.50 |
0081 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 |
856(G) 8890 |
EA |
11,000.000 |
11,000.000 |
|
0.000 |
$0.60 |
$0.00 |
$0.00 |
0082 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
859(A) 8006 |
LF |
35,000.000 |
35,000.000 |
|
9,212.000 |
$0.15 |
$0.00 |
$1,381.80 |
0083 |
ARROW DISPLAY(TYPE C) |
880(A) 8812 |
SD |
720.000 |
720.000 |
62.000 |
156.000 |
$1.00 |
$62.00 |
$156.00 |
0084 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
7,200.000 |
7,200.000 |
868.000 |
2,197.000 |
$0.15 |
$130.20 |
$329.55 |
0085 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
10,080.000 |
10,080.000 |
3,751.000 |
7,946.000 |
$1.00 |
$3,751.00 |
$7,946.00 |
0086 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
19,440.000 |
19,440.000 |
2,232.000 |
6,058.000 |
$0.50 |
$1,116.00 |
$3,029.00 |
0087 |
BARRICADES(TYPE III) |
880(C) 8842 |
SD |
20,160.000 |
20,160.000 |
1,758.000 |
4,215.000 |
$0.05 |
$87.90 |
$210.75 |
0088 |
WING BARRICADES |
880(C) 8848 |
SD |
1,440.000 |
1,440.000 |
93.000 |
408.000 |
$0.10 |
$9.30 |
$40.80 |
0089 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
59,760.000 |
59,760.000 |
5,593.000 |
14,758.000 |
$0.05 |
$279.65 |
$737.90 |
0090 |
WARNING LIGHTS(TYPE C) |
880(E) 8872 |
SD |
36,000.000 |
36,000.000 |
3,348.000 |
8,806.000 |
$0.10 |
$334.80 |
$880.60 |
0091 |
DRUMS |
880(F) 8878 |
SD |
36,000.000 |
36,000.000 |
10,261.000 |
26,428.500 |
$0.20 |
$2,052.20 |
$5,285.70 |
0092 |
PORT.CHANGEABLE MESSAGE SIGN |
882(B) 8306 |
SD |
720.000 |
720.000 |
|
0.000 |
$5.00 |
$0.00 |
$0.00 |
0093 |
(PL)REMOVAL OF EXISTING SIGNS |
890(A) 8722 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$500.00 |
$0.00 |
$0.00 |
0094 |
(PL)REMOVE & RESET EXISTING SIGNS |
890A/B 8756 |
EA |
71.000 |
71.000 |
|
0.000 |
$85.00 |
$0.00 |
$0.00 |
9001 |
(PL)C/L CONST.ZONE PAV.MARKERS(YELLOW) |
856(G) 8884 |
EA |
0.000 |
0.000 |
|
0.000 |
$29.00 |
$0.00 |
$0.00 |
9002 |
TUBE CHANNELIZERS |
880(G) 8884 |
SD |
0.000 |
0.000 |
|
0.000 |
$0.23 |
$0.00 |
$0.00 |
9003 |
RELOC.PORT.TYPE PRECAST CONC.MEDIAN BARR |
627(G) 4316 |
LF |
0.000 |
0.000 |
|
0.000 |
$5.41 |
$0.00 |
$0.00 |