SPList
|
List of Special Provisions - Print and include completed form with project submission.
|
Submission
|
Project Submission Letter
|
101-001
|
Maintenance Bonds
|
102-004
|
A + B Bidding (Traditional Bid + Incentive/Disincentive Payment)
|
102-009
|
Biding Requirements for Right-Of-Way Clearance Contracts
|
103-001
|
Bonding Requirements
|
104-001
|
Railroad Flagging
|
104-002
|
Railroad Flagging/a>
|
107-008
|
Legal Relations and Responsibility to Public (Railroad Insurance)
|
107-012
|
Federal Aviation Regulations
|
108-ID
|
Incentive / Disincentive
|
108-LR
|
Lane Rental
|
108-MI
|
Interanl Milestone
|
108-PP
|
Prosecution and Progress
|
108-001
|
Progress and Prosecution for Right-of-Way Clearance Contracts
|
<
108-005
|
Prosecution Progress (90 Days)
|
108-006
|
Prosecution Progress (120 Days)
|
108-023
|
Flexible Notice to Proceed
|
108-027
|
Delayed Notice to Proceed
|
108-081
|
Disincentive for Exposed Cold-Milled Pavement
|
108-182
|
Subletting of Contract (70%)
|
109-003
|
Price Adjustment for Fuel
|
110-001
|
General Porvisions for Use of Electornic Data
|
202-002 Off System
|
Osage Nation Mineral Reservation Sandy Soil Mining Permit
|
202-002 On System
|
Osage Nation Mineral Reservation Sandy Soil Mining Permit
|
246-002
|
Geogrid Earth Reinforcement
|
325-001
|
Moisture Barrier Membrane
|
407-002
|
Bonded Hot Mix Asphalt
|
410-001
|
Milled Hot Recycling of Bituminous Material (Partial Depth) 2”+ Surface Recycling
|
411-015
|
Rich Intermediate Layer (RIL)
|
411-018
|
Intelligent Compaction of Asphalt
|
414-017
|
Longitudinal Finish
|
414-018
|
Optimized Gradation for Portland Cement Concrete Pavement
|
415-001
|
Bituminous (Fiber Fill) Crack Sealing
|
430-2QA
|
Pavement and Bridge Deck Smoothness
|
435-003
|
Fiber Reinforced, Bonded Portland Cement Concrete Overlay
|
504-006
|
Rail, Parapets, and Curbs
|
504-007
|
Bridge Deck Finish on County Bridges
|
513-001
|
Anodes
|
516-001
|
Pulse-Echo Testing of Drilled Shafts
|
524-003
|
Fiber Reinforced Polymer Material
|
525-001
|
Migratory Bird Nest Prevention for Bridge Structures and Culverts
|
619-004
|
Plugging and Abandonment of Oil Wells
|
701-014
|
Optimized Gradation for Portland Cement Concrete Pavement
|
708-021
|
Reclaimed Asphalt Pavement and Shingles
|
708-024
|
Performance-Graded Asphalt Binder Using Multiple Stress Creep Recovery (MSCR) Test
|
809-001
|
Bridge Navigation Lighting
|
823-001
|
Temporary Traffic Signals
|
880-001
|
Traffic Surveillance
|
882-002
|
Portable Automated Real-Time Work Zone Information System (Smart Work Zone)
|