Information source is the ODOT Construction Division Graybook system - Mon 8/16/2010 8:20:11 PM | ||||||||||||||||
| County | Highway Number |
Contract ID |
Job Piece |
Project | Stimulus Indicator |
Prime Contractor |
Job Description |
Current Contract Amount |
Amount Paid |
Let Date |
Award Date |
Contract Date |
Work Order Date |
Work Order Effective Date |
Estimated Completion Date |
Actual Completion Date |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Adair | SH-51 | 100155 | 2717204 | STP-STIM(434)EH/STP-STIM* | E | GLOVER & ASSOCIATES, INC. | *(434)PT.3EH / 0.613 MI. SH -51;PEDESTRIAN IMPROV./RESUR- FACE (ASPHALT)FROM MAPLE ST. ,EXT EAST IN HULBERT. | $384,793.70 | $0.00 | 04/15/2010 | 05/03/2010 | 05/19/2010 | 05/27/2010 | 08/02/2010 | 10/30/2010 | |
| Alfalfa | SH-45 | 100057 | 2720604 | STP-STIM(467)EH/STP-STIM* | E | HEMBREE & HODGSON CONSTRUCTION, LLC | *(467)PT.3EH / 0.863 MI. SH- 45;PEDESTRIAN IMPROV./RESURF. (ASPHALT)FROM MCCLURE AVE., EXTEND E. IN GOLTRY. | $491,607.33 | $0.00 | 04/15/2010 | 05/03/2010 | 05/26/2010 | 06/08/2010 | 07/19/2010 | 10/16/2010 | |
| Beaver | SH-270 | 100156 | 2720704 | STP-STIM(468)EH | E | PARK CONSTRUCTION COMPANY | 0.366 MI. US-270:PEDESTRIAN IMPROV. FROM MISSISSIPPI ST., EXTEND E. TO TX AVE. IN THE TOWN OF FORGAN. | $664,508.68 | $662,089.12 | 01/28/2010 | 02/01/2010 | 02/17/2010 | 03/22/2010 | 04/19/2010 | 06/17/2010 | |
| Beckham | SH-152 | 090682 | 2719804 | STP-STIM(459)EH | E | SAC SERVICES, INC. | 1.248 MI. SH-152/US-283; PEDESTRIAN IMPROVEMENT, FROM MAIN STREET,EXTEND NORTH IN THE CITY OF SAYRE. | $465,076.55 | $465,076.39 | 12/17/2009 | 01/11/2010 | 01/25/2010 | 02/03/2010 | 03/01/2010 | 04/29/2010 | |
| Blaine | SH-51 | 100063 | 2720004 | STP-STIM(461)EH/STP-STIM* | E | K & K CONTRACTING, INC. | *(461)PT.3EH/ 0.822 MI. SH- 51/SH-58;PEDESTRIAN IMPROV. FROM GRANT ST. EXTEND E., & SH-58 FROM PK. ST. | $626,582.20 | $244,432.82 | 04/15/2010 | 05/03/2010 | 05/19/2010 | 05/27/2010 | 07/05/2010 | 10/02/2010 | |
| Caddo | US-277 | 100157 | 2721304 | STP-STIM(474)EH | E | BLACO CONSTRUCTION, LLC | 0.045 MI. US-277;PEDESTRIAN IMPROV./FROM F AVE. W. TO ONE BLOCK W. OF MAIN ST. IN THE TOWN OF CEMENT. | $66,709.35 | $66,709.34 | 02/25/2010 | 03/01/2010 | 03/15/2010 | 03/23/2010 | 05/03/2010 | 07/01/2010 | 07/16/2010 |
| Carter | SH-53A | 100026 | 2721404 | STP-STIM(475)EH | E | COMMERCIAL CONCRETE | 0.251 MI. SH-53A;PEDESTRIAN IMPROV.;FROM GRAND ST.,EXTEND NORTH IN THE TOWN OF GENE AUTRY. | $100,387.20 | $100,040.89 | 01/28/2010 | 02/01/2010 | 02/25/2010 | 04/05/2010 | 07/07/2010 | ||
| Cotton | SH65 | 100072 | 2721004 | STP-STIM(471)EH/STP-STIM* | E | T & G CONSTRUCTION, INC. | *(471)PT.3EH / 0.719 MI. SH -65;PEDESTRIAN IMPROV./RESUR- FACE(ASPHALT)FROM OREGON ST. ,EXTEND S. TO OKLA. ST. IN TEM | $463,962.76 | $21,123.94 | 04/15/2010 | 05/03/2010 | 05/19/2010 | 05/26/2010 | 07/12/2010 | 10/09/2010 | |
| Creek | US-75A | 100073 | 2721504 | STP-STIM(476)EH/STP-STIM* | E | KEN LASTER COMPANY | *(476)PT.3EH / US-75A;PEDES- TRIAN IMPROV./RESURFACE (ASPHALT)FROM 9TH ST.,EXTEND NORTH IN MOUNDS. | $250,333.99 | $66,953.64 | 04/15/2010 | 05/03/2010 | 05/19/2010 | 05/26/2010 | 07/05/2010 | 10/02/2010 | |
| Dewey | SH-51 | 100029 | 2719904 | STP-STIM(460)EH | E | RUDY CONSTRUCTION CO. | 0.356 MI. SH-51;PEDESTRIAN IMPROV. FROM SPECK ST.,EXTEND EAST IN THE TOWN OF VICI. | $315,420.00 | $309,104.48 | 01/28/2010 | 02/01/2010 | 02/12/2010 | 02/19/2010 | 04/05/2010 | 06/03/2010 | 08/03/2010 |
| Ellis | SH-46 | 100031 | 2720504 | STP-STIM(466)EH | E | LOPP CONSTRUCTION, LLC | 0.229 MI. SH-46;PEDESTRIAN IMPROV. FROM N. OF SH-46/SH- 15 JCT EXTEND N. IN GAGE. | $118,741.00 | $18,942.02 | 04/15/2010 | 05/03/2010 | 05/19/2010 | 05/28/2010 | 07/12/2010 | 09/10/2010 | |
| Ellis | US-283 | 100030 | 2720404 | STP-STIM(465)EH | E | REDLANDS CONTRACTING, LLC | 0.673 MI. US-283/PEDESTRIAN IMPROVMENTS;FROM GRAND AVE. EX-TEND N. IN THE TOWN OF SHATTUCK. | $572,884.58 | $536,065.63 | 02/25/2010 | 03/01/2010 | 03/15/2010 | 03/24/2010 | 05/03/2010 | 07/01/2010 | |
| Garvin | SH-19 | 100075 | 2718804 | STP-STIM(449)EH | E | K & K CONTRACTING, INC. | 0.178 MI. SH-19;PEDESTRIAN IMPROV. FROM E. OF SH-19/SH- 74 JCT EXTEND E. IN MAYSVILLE. | $101,008.45 | $43,841.19 | 04/15/2010 | 05/03/2010 | 05/19/2010 | 05/26/2010 | 07/12/2010 | 09/10/2010 | |
| Grady | SH-17 | 100158 | 2721104 | STP-STIM(472)EH | E | RUDY CONSTRUCTION CO. | 0.380 MI. SH-17;PEDESTRIAN IMPROV. FROM COMANCHE AVE.,EX-TEND EAST IN THE TOWN OF RUSH SPRINGS. | $172,882.36 | $172,882.33 | 01/28/2010 | 02/01/2010 | 02/12/2010 | 02/17/2010 | 04/05/2010 | 07/03/2010 | 06/23/2010 |
| Grady | US-81 | 100033 | 2720904 | STP-STIM(470)EH | E | RUDY CONSTRUCTION CO. | 0.243 MI. US-81:PEDESTRIAN IMPROV. FROM 5TH ST. EXTEND NORTH IN THE TOWN OF POCASSET. | $134,356.00 | $134,355.97 | 01/28/2010 | 02/01/2010 | 02/12/2010 | 02/17/2010 | 04/05/2010 | 06/03/2010 | |
| Greer | SH-34 | 100034 | 2720104 | STP-STIM(462)EH | E | K & R BUILDERS, INC. | 1.262 MI. SH-34;PEDESTRIAN IMPROV. FROM SOUTH ST., EXT. NORTH IN THE CITY OF MANGUM. | $503,422.95 | $0.00 | 03/18/2010 | 04/12/2010 | 04/23/2010 | 04/26/2010 | 08/02/2010 | 10/30/2010 | |
| Harmon | US-62 | 100077 | 2719704 | STP-STIM(458)EH/STP-STIM* | E | K & K CONTRACTING, INC. | *(458)PT.3EH / 0.298 MI.;US -62;PEDESTRIAN IMPROV./RESUR- FAE(ASPHALT)FROM N. 1ST ST. ,EXTEND E. IN HOLLIS. | $476,465.60 | $0.00 | 04/15/2010 | 05/03/2010 | 05/19/2010 | 05/27/2010 | 07/19/2010 | 10/16/2010 | |
| Haskell | SH-31 | 100159 | 2717704 | STP-STIM(439)EH | E | GLOVER & ASSOCIATES, INC. | 0.2530 MI. SH-31/SH-2;PEDES -TRAIN IMPROV. SH-2 FROM 4TH ST. TO N. OF 2ND ST., & SH- 31 FROM HOYT TO MAIN IN THE CT | $169,815.40 | $153,812.91 | 01/28/2010 | 02/01/2010 | 02/17/2010 | 02/24/2010 | 04/05/2010 | 06/03/2010 | |
| Jefferson | SH-5 | 090683 | 2720804 | STP-STIM(469)EH | E | T & G CONSTRUCTION, INC. | 0.220 MI.;SH-5/PEDESTRIAN IMPROVEMENT;FROM ANDERSON AVE.,EXTEND SOUTH IN THE CITY WAURIKA. | $249,028.75 | $221,634.40 | 12/17/2009 | 01/11/2010 | 01/27/2010 | 02/02/2010 | 03/01/2010 | 04/29/2010 | |
| Jefferson | SH-5 | 100079 | 2721204 | STP-STIM(473)EH | E | T & G CONSTRUCTION, INC. | 0.192 MI. SH-5:PEDESTRIAN IMPROVEMENTS/FROM COMMERCIAL AVE. TO 4TH ST., IN THE CITY OF HASTINGS. | $226,517.00 | $104,378.20 | 02/25/2010 | 03/01/2010 | 03/17/2010 | 03/25/2010 | 05/03/2010 | 07/01/2010 | |
| Kay | US-60B | 100035 | 2719104 | STP-STIM(452)EH | E | HEMBREE & HODGSON CONSTRUCTION, LLC | 0.747 MI. US-60B/US-77: PEDESTRIAN IMPROVEMENTS;ON US-60 BUS. RD.FROM MAIN ST. EXT. EAST. ON US-77. | $335,082.11 | $323,485.40 | 02/25/2010 | 03/01/2010 | 03/09/2010 | 03/22/2010 | 05/03/2010 | 07/01/2010 | |
| Kingfisher | SH-81 | 100036 | 2719604 | STP-STIM(457)EH | E | RUDY CONSTRUCTION CO. | 0.2205 MI. SH-81;PEDESTRIAN IMPROV. FROM JUST SOUTH OF SH-33, EXTEND NORTH IN THE CITY OF KINGFISHER. | $573,407.50 | $260,594.94 | 01/28/2010 | 02/01/2010 | 02/12/2010 | 02/19/2010 | 04/05/2010 | 06/03/2010 | |
| Kingfisher | US-81 | 100161 | 2719204 | STP-STIM(453)EH | E | TMC CONSTRUCTION COMPANY | 0.454 MI. US-81;PEDESTRAIN IMPROV. FROM IOWA ST.,EXT. NORTH IN THE CITY OF OKARCHE. | $320,517.40 | $309,188.55 | 01/28/2010 | 02/01/2010 | 02/12/2010 | 02/17/2010 | 04/05/2010 | 06/03/2010 | |
| Kingfisher | US-81 | 100162 | 2719304 | STP-STIM(454)EH/STP-STIM* | E | TMC CONSTRUCTION COMPANY | *(454)PT.3EH / 1.433 MI. US -81;PEDESTRIAN IMPROV./RESUR- FACE (ASPHALT)FROM 7TH ST., EXTEND N. IN HENNESSEY. | $814,376.50 | $0.00 | 04/15/2010 | 05/03/2010 | 05/19/2010 | 05/27/2010 | 07/05/2010 | 10/02/2010 | |
| Kiowa | US-183 | 100082 | 2720204 | STP-STIM(463)EH/STP-STIM* | E | SEWELL BROS., INC. | *(463)PT.3EH / 1.38 MI. US- 183;PEDESTRIAN IMPROV./RESUR- FACE (ASPAHLT)FROM 5TH ST., EXTEND N. IN HOBART. | $517,232.50 | $83,513.51 | 04/15/2010 | 05/03/2010 | 05/19/2010 | 05/26/2010 | 07/05/2010 | 10/02/2010 | |
| Le Flore | US-271 | 100083 | 2717904 | STP-STIM(441)EH | E | HUB CONSTRUCTION, INC. | 0.103 MI. US-271;PEDESTRIAN IMPROV. FROM CHURCH ST.,EXTENDSOUTHEAST IN THE TOWN OF TALIHINA. | $138,611.63 | $135,228.30 | 01/28/2010 | 02/01/2010 | 02/10/2010 | 02/17/2010 | 04/05/2010 | 06/03/2010 | 06/02/2010 |
| Lincoln | SH-105 | 100038 | 2718604 | STP-STIM(447)EH | E | MORTON CONSTRUCTION, INC. | 0.172 MI. SH-105;PEDESTRIAN IMPROVMENTS;FROM OK ST., EX- TEND EAST IN THE TOWN OF TRYON. | $249,699.90 | $189,116.81 | 02/25/2010 | 03/01/2010 | 03/19/2010 | 03/25/2010 | 05/03/2010 | 07/31/2010 | |
| Lincoln | SH-18 | 100084 | 2718504 | STP-STIM(446)EH | E | DEVINE DOZER & CONSTRUCTION LLC | 0.262 MI. SH-18;PEDES- TRIAN IMPROV. FROM HAYES ST., EXTEND N,. IN THE CITY OF AGRA. | $164,331.56 | $144,982.20 | 01/28/2010 | 02/01/2010 | 02/10/2010 | 02/18/2010 | 04/05/2010 | 06/03/2010 | 07/12/2010 |
| Logan | SH-33 | 100086 | 2719504 | STP-STIM(456)EH | E | SAC SERVICES, INC. | 0.893 MI. SH-33:PEDESTRIAN IMPROVEMENTS:FROM CHOCTAW RD.,EXTEND EAST IN THE TOWN OF LANGSTON. | $1,428,547.18 | $554,352.28 | 02/25/2010 | 03/01/2010 | 03/17/2010 | 03/22/2010 | 05/03/2010 | 07/31/2010 | |
| Logan | SH-74 | 100085 | 2719404 | STP-STIM(455)EH/STP-STIM* | E | MARKWELL PAVING COMPANY, INC. | (455)PT.3EH/ 0.518 MI. SH- 74;PEDESTRIAN IMPROV./RESUR- FACE (ASPHALT)FROM N. LOCUS ST. S. TO W. ADAMS ST. | $373,695.20 | $0.00 | 04/15/2010 | 05/03/2010 | 05/10/2010 | 05/28/2010 | 07/19/2010 | 10/16/2010 | |
| Marshall | US-70 | 100040 | 2718404 | STP-STIM (445)EH | E | RUDY CONSTRUCTION CO. | 0.338 MI. US-70/US-70B;PEDES -TRIAN IMPROV. ON US-70,FROM MAY TUBBY ST. EXT. SOUTHEAST .ON US-70B,FROM FIRST ST. EXT. | $481,393.18 | $350,809.41 | 01/28/2010 | 02/01/2010 | 02/12/2010 | 02/19/2010 | 04/05/2010 | 08/02/2010 | |
| Mayes | US-412A | 100092 | 2721904 | STP-STIM(480)EH/STP-STIM* | E | DTEC SERVICES, LLC | *(480)EH/STP-STIM(480)PT.3 EH/ 0.344 MI. US-412A;PEDES- TRIAN IMPROV./RESURFACE ( ASPHALT)FROM BROADWAY ST., | $235,468.18 | $53,632.20 | 04/15/2010 | 05/03/2010 | 05/19/2010 | 05/27/2010 | 07/05/2010 | 10/02/2010 | |
| McCurtain | US-70 | 100164 | 2718104 | STP-STIM(442)EH | E | HUB CONSTRUCTION, INC. | 0.868 MI. US-70/US-259/PEDES -TRIAN IMPROV.;ON US-70,FROM N. PK.DR.,EXTEND E. ON US- 259,FROM CRAIG RD.,EXTEND N. | $252,255.93 | $247,255.93 | 01/28/2010 | 02/01/2010 | 02/10/2010 | 02/17/2010 | 04/05/2010 | 06/03/2010 | |
| Murray | SH-7 | 100165 | 2740504 | STP-STIM(516)EH | E | SILVER STAR CONSTRUCTION COMPANY, INC. | 0.404 MI. SH-7;FROM 9TH ST., EXTEND EAST IN THE CITY OF SULPHUR. | $314,280.00 | $95,318.93 | 04/15/2010 | 05/03/2010 | 05/19/2010 | 05/28/2010 | 07/12/2010 | 09/10/2010 | |
| Muskogee | SH-2 | 100166 | 2717404 | STP-STIM(436)EH/STP-STIM* | E | GLOVER & ASSOCIATES, INC. | *(436)PT.3EH /0.696 MI. SH-2 ;PEDESTRIAN IMPROV./RESURFACE (ASPHALT)FROM JUST S. OF MUSKOGEE AVE.,EXTEND N. IN POR | $366,419.70 | $0.00 | 04/15/2010 | 05/03/2010 | 05/19/2010 | 05/27/2010 | 08/02/2010 | 10/30/2010 | |
| Muskogee | SH-72 | 100041 | 2717304 | STP-STIM(435)(438)EH | E | GLOVER & ASSOCIATES, INC. | 0.560 MI. SH-72;PEDESTRIAN IMPROV.:FROM 4TH ST.,EXTEND N. IN THE TOWN OF COUNCIL HILL. FROM EUGENE AVE.,EXTEND | $244,939.63 | $186,632.62 | 01/28/2010 | 02/01/2010 | 02/18/2010 | 02/24/2010 | 04/05/2010 | 07/02/2010 | |
| Nowata | US-60 | 100167 | 2721604 | STP-STIM(477)EH | E | CANTERA CONCRETE COMPANY, LLC | 0.747 MI. US-60;PEDESTRIAN IMPROVEMENTS;FROM DELAWARE AVEEXTEND S. THEN EAST IN THE CITY OF NOWATA. | $199,261.00 | $171,227.37 | 02/25/2010 | 03/01/2010 | 03/09/2010 | 03/16/2010 | 05/03/2010 | 07/01/2010 | |
| Osage | SH-18 | 100168 | 2721704 | STP-STIM(478)EH | E | DTEC SERVICES, LLC | 0.246 MI. SH-18; PEDESTRIAN IMPROV. FROM WALNUT ST.,EXTENDSOUTH IN THE CITY OF FAIRFAX. | $210,735.18 | $49,691.74 | 04/15/2010 | 05/03/2010 | 05/19/2010 | 05/24/2010 | 07/05/2010 | 09/03/2010 | |
| Ottawa | SH-10 | 100169 | 2724804 | STP-STIM(489)EH | E | PBX CORPORATION | 0.282 MI. SH-10/PEDESTRIAN IMPROV.;FROM C ST., EXTEND E. IN THE CITY OF MIAMI. | $484,614.50 | $409,607.57 | 01/28/2010 | 02/01/2010 | 02/16/2010 | 02/20/2010 | 04/05/2010 | 06/03/2010 | |
| Ottawa | US-69A | 100098 | 2721804 | STP-STIM(479)EH/STP-STIM* | E | GLOVER & ASSOCIATES, INC. | *(476)PT.3EH / 0.563 MI. US -69A: PEDESTRIAN IMPROV./RE- SURFACE (ASPHALT)FROM 4TH ST., EXTEND N. IN QUAPAW. | $402,763.16 | $18,129.00 | 04/15/2010 | 05/03/2010 | 05/19/2010 | 05/26/2010 | 07/05/2010 | 10/02/2010 | |
| Pittsburg | US-69 | 100170 | 2724404 | STP-STIM(485)EH | E | RUDY CONSTRUCTION CO. | 0.567 MI. US-69:PEDESTRAIN IMPROV. FROM 8TH ST., EXTEND NORTH IN THE CITY OF KIOWA. | $538,509.53 | $457,124.67 | 01/28/2010 | 02/01/2010 | 02/16/2010 | 02/20/2010 | 04/05/2010 | 08/02/2010 | |
| Seminole | SH-56 | 100045 | 2718704 | STP-STIM(448)EH | E | WADE CONSTRUCTION, INC. | 0.11 MI. SH-56;PEDESTRIAN IMPROVEMENT. FROM CHESTNUT ST., EXTEND EAST IN THE TOWN OF SASAKWA. | $156,594.00 | $116,086.39 | 02/25/2010 | 03/01/2010 | 03/15/2010 | 03/22/2010 | 05/03/2010 | 08/30/2010 | |
| Sequoyah | US-64 | 100171 | 2717504 | STP-STIM(437)EH | E | GLOVER & ASSOCIATES, INC. | 0.679 MI. US-64/SH-82: PEDESTRIAN IMPR. ON US-64, FROM BLACKSTONE ST.,EXT. E. ON SH-82,FROM MAIN ST. | $465,168.68 | $409,801.87 | 01/28/2010 | 02/01/2010 | 02/18/2010 | 02/24/2010 | 04/05/2010 | 06/03/2010 | |
| Texas | US-412 | 090685 | 2720304 | STP-STIM(464)EH | E | K & K CONTRACTING, INC. | 0.348 MI. US-412; PEDEST- RIAN IMPROVEMENT/FROM 2ND ST. EXTEND WEST IN THE CITY OF HARDESTY. | $212,949.55 | $197,994.02 | 12/17/2009 | 01/11/2010 | 01/27/2010 | 02/02/2010 | 03/01/2010 | 04/29/2010 | |
| Wagoner | SH-51B | 100172 | 2724304 | STP-STIM(484)EH | E | GLOVER & ASSOCIATES, INC. | 0.420 MI. SH-51B;PEDESTRIAN IMPROV. FROM HALE ST. SOUTH TOBELAIRE ST., IN THE CITY OF PORTER. | $411,829.50 | $403,100.87 | 01/28/2010 | 02/01/2010 | 02/18/2010 | 02/24/2010 | 04/05/2010 | 06/18/2010 | |